Description

ORTIZ CONSTRUCCIONES y PROYECTOS, S.A. is a company specializing in the execution and overhauling of infrastructures at different network levels: conventional, high-speed or metropolitan transport, with the capacity to implement all the necessary work. We build, strengthen and carry out improvement work on roadways, tunnels, bridges and stations, consolidation of ditches, overhaul of embankments and reconstruction of gutters.

Management team

Management board:
Chairman and CEO: Juan Antonio Carpintero López
Executive Vice-President: Sara Carpintero Grande
General Secretary: Juan Luis Domínguez Sidera
Corporate General Manager: Raul Arce Alonso
Development General Manager: Francisco Javier de la Mata Medina
Sustainability and Digital Transformation General Manager: Carlos Bárcena Martín
Economic and Administrative General Manager: Federico Colom
Concessions Director: Carlos Carpintero Grande
Concessions and Treasury Director: Alberto de la Fuente Sanz
Economic and Financial Director: María Carpintero Grande

Main products and services

Construction of Railway Construction Works and associated Infrastructures: viaducts, structures, tunnels, earthworks, railway infrastructures, drains and railway stations.


Top products: INFRASTRUCTURE: 1. Construction of the trackbed for the high-speed railway between Madrid and Extremadura. Talayuela-Cáceres. Section: Toril-Río Tiétar. 2. Implementation of the construction work of the New Parla Norte Station (Madrid). Work on railways.

 

Activities by year

A number of ongoing projects being carried out by ORTIZ CONSTRUCCIONES y PROYECTOS, S.A. is provided as follows.

Construction of the trackbed for the high-speed railway between Madrid and Extremadura. Talayuela-Cáceres. Section: Toril-Río Tiétar.
Construction of a section of 10,682 m of the high-speed railway trackbed up to the sub-ballast layer. Emphasis is placed on construction of the viaduct over the River Tiétar, covering a length of 302 m with 6 spans 43+4 x 54+43 m and with a single-cell caisson section made from prestressed concrete to a thickness of 3.80 m and 14 m width. A bridge was built over the EX-A1 highway spanning 211 m made from prefabricated T beam platforms 1.40 m thick and a compression slab of more than 25 cm over prefabricated concrete floor plates. Earthworks comprise 2 million cubic metres including excavation and landfill work. Embankments are built using the landfill from excavation work of the cemented section.

Implementation of the construction work of the New Parla Norte Station (Madrid). Work on railways.
New local railway station, to the north of the urban area of Parla town. The station will be integrated into the currently operating Region of Madrid's C-4 local railway. The station will cover an area of 900 m2 and will comprise a single floor with three differentiated areas: passenger hall, shopping area and technical service facilities. The station will have platforms 210 m long and a minimum width of 5 m. An underpass will link the platforms built using buried caissons measuring 5 m wide and 3 m headroom.

Execution of the construction work on the branch line linking the Monforte del Cid-Murcia high-speed railway line with the Chinchilla-Cartagena line.
Execution of the trackbed for the direct link (bypass) in the El Reguerón area with a single standard gauge track and design speed of 160 km/h, as well as replacement of easements and affected services, environmental integration of the infrastructure and complementary works. The RM-F16 viaduct is particularly noteworthy, allowing the crossing of the High-speed Railway line with the F-16 country road featuring three spans (12 + 16 + 12) and deep foundations using prefabricated piles on all supports. The geotechnical conditions of the site required specific geotechnical methods: preload on embankments and reinforcements of the natural terrain using gravel columns and vertical drainage.

 

Areas ORTIZ CONSTRUCCIONES y PROYECTOS, S.A. carries out its business activities nationally and internationally.

Certifications Quality and Environment:
Quality Management System certificate in accordance with ISO 9001:2015 standard assigned registration number ER- 0159/1997.
Environmental Management System certificate in accordance with the ISO 14001:2015 standard assigned registration number GA-2000/0039.
Certificate of the Energy Management System in accordance with the ISO 50001:2018 standard assigned registration number GE-2014/0023.
CO2 Compliance Certificate calculated in accordance with the requirements of the GHG PROTOCOL assigned registration number GHG-0099/2023.
Certificate from the Occupational Health and Safety Management System in accordance with the ISO 45001:2018 standard assigned registration number SST-0199/2012 (formerly OSHAS 18001:2007).
Certificate from the Statutory Audit of Occupational Risk Prevention assigned registration number APRL-2022/0040.
All the aforementioned certificates were awarded by AENOR INTERNACIONAL, S.A.U.

Activities Infraestructure, Mechanical construction, Track.