Company data |
Management team |
Chairman and Chief Executive Officer: Eugenio Llorente Gómez. COBRA General Manager: Jose Mª Castillo Lacabex. Railways General Manager: Enrique Leal Hernandez. Installations General Manager: Rafael Pulido Ortega. Substations Branch Manager: Rodrigo Arias Pérez. Inland Areas Manager: José Burgos Gómez.Center Area Manager: Jose Burgos Gómez. Cataluña Area Manager: Antonio Carpi Cucalón. Levante Area Manager: Alejandro Just Rodrigo . Andalucía Area Manager: Rafael Palacín Rizo. Castilla y Léon Area Manager: Jose Burgos Gomez. Northern Area Manager: Manuel Fernando Rodriguez Rodriguez. Local Managers: Marcos Cuello, Miguel Castro, Francisco Javier Martinez Solera, Marcelino Bravo Rodríguez, Juan Antonio Madrid Cuevas.
|
Activity |
Electrification, signalling, telecommunications, detection systems, engineering, consulting and technical assistance. |
Main products and services |
Catenary and Overhead Contact System for: DC & AC Railways, metropolitan railways, tramways, trolleybuses, rigid catenary, third rail. Substations: Power substations, DC & AC traction substation. Service lines. Railway communications: Remote command and control of traction substations. Overhead lines, quads, optic fibre. Telephony. Public-address system, data display monitors, timing. Telex and data transmission. Automatic vehicle identification systems, radio-block system. Signalling and safety systems: electronic interlocking. Automation of level crossings. Landslide and perimeter protection. Access control. Ticketing systems. Operation support systems (OSS). Engineering. Design. Projects. Supplies. Installations. Commissioning. Supervision. Maintenance. Systems for detecting falling objects on the track. Hot box detection system.
Top products: INFRASTRUCTURE: 1. OM2-30 “NORMALIZACIÓN DE INFRAESTRUCTURA CATENARIAS SECTOR LAJA - HUALQUÍ”. 2. CONSTRUCTION PROJECT OF THE OVERHEAD CONTACT LINE AND ASSOCIATED SYSTEMS FOR THE BIFURCATION SECTION PEÑAS BLANCAS–MÉRIDA–BADAJOZ–FRONTERA PORTUGUESA OF THE MADRID–EXTREMADURA HIGH SPEED LINE.
|
Activities by year |
Activities in 2020:
-Laja-Hualqui (Chile) Electrification Project (Overhead Catenary System & 2kV Auxiliary Power Supply).
-Mediterranean Corridor Line. Encina-Xátiva Stretch. Signaling System Installation.
-Northern Lot (Spain): Electrification System Preventive and Corrective Maintenance. Electrification Auxiliary Works (Contact Line, Traction Substations and High Voltage Lines).
-Madrid-Extremadura/Portuguese Border High Speed Line: Object Fall Detection System.
-Madrid-Extremadura/Portuguese Border High Speed Line: Hot Box Detection System.
|
Innovations |
Innovation in 2020:
-Hazard Log Correlation Study. Hazard Log impact over the surroundings, economics and environment during the different phases of the Project Life Cycle (Design, Tender, Execution, Test & Commissioning, After Sales Service).
|
Areas |
EUROPE
AFRICA
LATIN AMERICA
ASIA |
Certifications |
Quality and Environment:
ISO 14001
ISO 50001
ISO 9001
|
Turnover |
1.164.685.858 € |
No. of employees |
3.549 |
Share capital |
24.040.000 € |
R&D Investment |
4.016.798 € |
Results |
99.220.114 € |
Activities |
Electrification, Engineering and consulting, Telecommunication. |
|