Main Design and Detail Design of La Tenería railway station. Madrid conmuter line C-3.
Main Design and Detail Design of railway infrastructure, section 96/650 to 96/780 (San Juan del Puerto) Line from Seville to Huelva”.
Main design and Detail Design of railway infrastructure. Embankment Stabilization in section 59/940 to 60/400, Line from Madrid to Valence.
Main design and Detail Design of railway infrastructure. Wall stability in section 117/020 to 117/720 (Abdalajís). High speed railway from Cordova to Malaga.
Stabilization and improvement of the cut in sections 141/680 to 142/980 and 144/390 to 145/515. High speed railway from Madrid to Valence.
Main Design and Detail Design of Level Crossing Suppression in km 251/045 and 252/039 (Calatayud). Line from Madrid to Barcelona.
Main Design and Detail Design of Level Crossing Suppressions km. 2/770, 2/325, 1/919 and 0/727 (Ripoll). Line from Barcelona to French Border (La Tour de Carol)
Main Design and Detail Design of underpasses between platforms in Riudellots (Girona) railway station.
Main Design and Detail Design of underpasses between platforms in Balenyà – Tona - Seva (Barcelona) railway station.
Main Design and Detail Design of underpasses between platforms in Sollana (Valence) railway station.
Main Design and Detail Design of Metro de Madrid. Improvement of accessibility in station Nuñez de Balboa.
Main Design and Detail Design of Metro de Madrid. Improvement of accessibility in station Oporto.
Main Design and Detail Design of Metro de Madrid. Improvement of accessibility in station Duque de Pastrana.
|