Company data |
Management team |
CEO: Ignacio Gastón Najarro.
Ignacio Clopés Estela. Ángel Luis Sánchez Gil. Enrique Blanco Gómez. Ignacio García Bilbao. Ángel Sánchez Bartolomé. Agustín Manzanas Pata. Javier Vaca de Osma Ulacia. José Carlos Esteban Blein. José Vicente Baraja Martí. Mario Menéndez Montoya. Silvia Rodriguez Hueso. Benjamín Aaron Juárez.
|
Activity |
Infrastructure Construction and Engineering.
|
Main products and services |
Ferrovial Group is a leading global infrastructure operator, with more than 70 years of experience, with extensive capabilities to develop complete projects, from the conception of the technical proposal, financing, design and construction to the operation and maintenance of infrastructures. It is listed simultaneously on Euronext Amsterdam, Nasdaq and the Spanish stock market, where it is a member of the IBEX 35.
The company has more than 25,000 employees, of which nearly 6,500 are in Spain, and a presence in more than 15 countries, including the United States, Canada, the United Kingdom, Spain, Poland and Australia. The company focuses on four key businesses: Toll Roads, Airports, Construction and Energy.
Both technological innovation and sustainability are essential cross-cutting themes in Ferrovial's corporate strategy. Its responsibility towards environmental protection, good governance and the development of the regions where it operates is endorsed by Ferrovial's continued presence in globally recognised sustainability indices such as the Dow Jones Best in Class Index (formerly the Dow Jones Sustainability Index).
Top products: INFRASTRUCTURE: 1. Execution of works for the Construction Project of High-Speed Rail Platform Madrid-Extremadura. Section: River-Malpartida in Plasencia (Spain). MAINTENANCE: 2. Application of Artificial Intelligence for vegetation control.
|
Activities by year |
Railway tracks
Spain
- Undergrounding of the R2 commuter line of Barcelona as it passes through the urban area of Montcada I Reixac and construction of the new station.
- Accesses to La Sagrera station.
- Track assembly of La Sagrera High Speed station.
- Architecture and facilities of La Sagrera Train Technical Treatment Area.
- Architecture and installations of La Sagrera Train Technical Treatment Area (PHASE B).
- Viaduct over the Ebro River and connection platform with the Castejón-Comarca de Pamplona High Speed Railway Line.
- Renewal, change of gauge and adaptations of Xátiva-Nudo de la Teja.
- Integral improvement of the infrastructure of the Madrid-Seville High Speed Line. Section: Guadalmez-Córdoba.
- Renewal of turnouts (PHASE 1) in the Madrid-Seville High Speed Line.
- Renewal of turnouts (PHASE 2) in the Madrid-Seville High Speed Line.
- Oural Tunnel located in the Monforte-Lugo section of Line 800: A Coruña-León.
- Platform of the Mediterranean High Speed corridor. Section: Lorca-Pulpí.
- Platform of the Mediterranean High Speed corridor. Section: Pulpí-Vera.
- Platform of the Madrid - Extremadura - Talayuela – Cáceres High Speed Railway. Section: Río Tiétar - Malpartida de Plasencia.
- Remodeling of the A Coruña - San Cristovo station and signaling system, train protection, centralized traffic control and communications.
- Undergrounding of the arterial railway network in the city of Murcia. Undergrounding of the station and Barriomar and undergrounding of Nonduermas.
- Architecture, installations and urban development of the Carmen Station (Murcia).
- Maintenance depot and service building at the Murcia freight logistics centre.
- Algeciras-Zaragoza railway motorway. Section: San Fernando-Santa Maria de la Huerta.
- Emergency works as a result of the Storm DANA.
- Platform of the Vitoria-Bilbao-San Sebastián High Speed Railway. Section: Legutiano-Escoriatza. Subsection II.
- Maintenance of infrastructure, track and switch and crossing of the Madrid South High Speed Railway Line. Lot 2 and 3.
- Maintenance of infrastructure, track and switch and crossing for the Madrid Northeast High Speed Railway Line. Lot 2.
- Maintenance of infrastructure, track and switch and crossing for the Madrid Northwest High Speed railway line. Lot 1.
- Maintenance of infrastructure, track and switch and crossing for the Plasencia-Badajoz High Speed railway line.
- Maintenance of MIV Northwest. Lot 1.
- Maintenance of MIV East. Lot 4.
- Maintenance of MIV Center. Lot 5.
- Vegetation control by herbicide train in AV.
- Vegetation control and margins on conventional lines. Lot 1.
- Vegetation control and margins on conventional lines. Lot 3.
- Vegetation control and margins on conventional lines. Lot 4.
- Vegetation control and margins on conventional lines. Lot 5.
- Operation of ADIF locomotives. Northeast. Lot 1.
- Operation of ADIF locomotives. East. Lot 2.
- Towing of trains with materials for works to be carried out on the conventional gauge network
- Railway Traction Services
International
- Construction of the California High Speed Line. Section 4: Fresno-Bakersfield (USA).
- Design and construction of lots C2 and C3 of the British HS2 High Speed railway line (UK).
- Design and construction of track infrastructure of the British HS2 High Speed railway line (UK).
- Construction of the “Rail Baltica” High Speed railway line in Latvia.
- Construction of the “Rail Baltica” High Speed railway line in Estonia.
Metros and metropolitan railways
Spain
- Barcelona Metro (Spain). Line 8 between Plaza de España and Gracia stations.
International
- Toronto Metro (Canada).
- Sydney Metro (Australia).
- Paris Metro (France).
- Lisbon Metro (Portugal). Yellow and pink line.
|
Areas |
The United States and Poland, in addition to Spain as a market of origin, remain the division´s main markets, accounting for around 80% of sales. Other geographies with a stable presence are the United Kingdom, France, Portugal, Latvia, Estonia, Chile, Perú, Puerto Rico, Australia and Canada.
|
Certifications |
Quality and Environment
- Ferrovial, the first Spanish and European construction company to obtain the Environmental Management certificate in accordance with ISO 14001 (AENOR).
- Quality Certificate in accordance with ISO 9001 (AENOR).
- Energy Efficiency Certificate as accredited by the ISO 50001 (AENOR).
- Occupational Health and Safety Certificate according to the ISO 45001 (AENOR).
- Certificate of R+D+i according to the EMAS III/UNE 166002 (AENOR).
- Certificate of carbon management in infrastructures according to PAS 2080:2016.
- Certificate of digitization of information management throughout the entire life cycle of a built asset using BIM (BUILDING INFORMATION MODELING) as accredited by the BIM ISO 19650 (AENOR).
- Information Security Certificate in accordance with ISO 27001 (AENOR).
- Certificate of customer complaints and claims according to the ISO 10002 (AENOR).
- Ethical and Socially Responsible Management System Certificate according to SGE 21 (Forética).
- Tax and Fiscal Compliance Certificate according to UNE 19602 (AENOR).
- Collaborating in the definition of the UNE 53001 Standard on Management System for the United Nations Sustainable Development Goals.
- Zero Waste Certificate according to SGS (Société Générale de Surveillance)
|
Turnover |
7.234 M€ |
No. of employees |
18.131 |
R&D Investment |
30,41 M€ |
Order volume |
16.755 M€ |
Ebitda |
430 M€ |
Activities |
Training, certification, research, Infraestructure, Engineering and consulting, Others, Track. |
|