Cookie Consent by FreePrivacyPolicy.com Company tab: CYCASA - Revista VÍA LIBRE - Fundación de los Ferrocarriles Españoles

Company: Company tab

CYCASA  Canteras y Construcciones, S.A.

Versión en castellano

Postal address Henao, 18 - 1º
E-48009 Bilbao. Spain
Telephone +34 94 444 70 51   Fax +34 94 410 03 60   E-mail cycasa@cycasa.com
Company data
Management team

President: José Manuel Rodríguez Emaldi. CEO: Leónides Gutiérrez Pozo. Railway Works Manager: Miguel Moreno Díaz. Civil Works Manager: José Manuel Tomé Landa. Head of Studies: Francisco Javier González de la Mora. Technical Manager: Oscar Rodríguez Barrio. Financial Manager: Imanol San Miguel Bikunia.

Activity Track Construction, Infrastructure and Superstructure, Track Maintenance, Aggregates Production and Supply, Civil Works and Building Works (housing, nursing homes, car parks, etc.).

Main products and services

Manufacture and supply of aggregates (ballast, gravel, etc.), having its own quarry in Santa Maria del Cubillo (Ávila). Construction and maintenance of railway lines (Feve, Metro Bilbao, ETS, ADIF, Ferrocarrils de la Generalitat Valenciana (FGV) and other Authorities). Construction and maintenance of roads and motorways. Urban development works, supply, sanitation and agglomerates. Building works (housing, nursing homes, car parks, etc.).

Activities by year

Railway Sector: Type 1 annual ballast supply (High Speed) for ADIF. Ballast supply on various high-speed sections for ADIF. Various track maintenance works, upkeep, and urgent interventions, as well as construction and renovation of superstructure works in all national authorities (ADIF, ADIF ALTA VELOCIDAD, METRO BILBAO, ETS, ADIF RAM, AUTORIDAD PORTUARIA DE SANTANDER, FERROCARRILS DE LA GENERALITAT DE CATALUNYA, FERROCARRILS DE LA GENERALITAT VALENCIANA).

Machinery and Equipment: Following with the policy of improving the machinery at CYCASA CANTERAS Y CONSTRUCCIONES, S.A., different types of machinery for civil engineering (shovels, trucks, etc.) have been added. Installation of asphalt plant. Implementation in heavy machinery for track levelling and alignment, of SMART ALC track geometry optimisation and plotting systems as well as a DRP recording system.

Innovations

Research, Development and Technological Innovation

- In 2022 we received a favourable simplified environmental report for the project, while waiting for the granting of building, environmental, and activity permits for introducing the management, transport, treatment, and recycling of construction waste (CDW) into the Municipal District.

- This will enable a reduced environmental impact, increasing the reserves and consumption of natural aggregates by incorporating CDW into MBs and granular layers, and integrating the operation into a circular economy model included in the EU’s 2030 targets.

- In 2022 we concluded the industry 4.0 project for digitalising the organisation’s bituminous mixture plant by means of the SENSASFALT project, incorporating the digitalisation of bituminous mixture manufacturing processes; the investment amounted to € 248,824.00.
 
-The first quarter saw the approval of the GV’s HAZITEK ECO2D4.0 project for the “Experimental dimensioning of road infrastructures using strategic waste and development of a monitoring and simulation ecosystem for the selection of sustainable solutions”, which was presented with the rest of the group’s members for the amount of € 652,815.27 and approved for € 540,356.36.

-The group is made up of Befesa (with Waelz process ferrosite), FCC (with bottom ash from MSW), Tubos Reunidos (with black slag from steelworks), Fuchosa (with green foundry sand), and CYCASAS (with recovered milling waste). 

- Specifically, CYCASAS’ annual budget for 2022 was presented as € 117,756.01 and approved as € 100,097.04. The annual budget for 2023 has been presented with a request amounting to € 149,812.65.

- It was presented to the MITMA (Ministry of Transport, Mobility and Urban Agenda) in the second half of the year, as part of the Recovery, Transformation, and Resilience Plan for the economy, within the programme to support sustainable transport, specifically for the “renewal and adaptation of resources, machinery for obtaining sustainable road surfaces: reduction of carbon footprint and noise reducers”

- The project was presented jointly with PADECASA, with an investment of € 4,396,723.00, including a subsidy amounting to € 1,758,689.20. The most important investments involve the incorporation of RAP into cold recycling, with independent weighing of the two fractions of aggregates recovered from bituminous mixtures, renewal of lagging, system of liquid and solid additives, humidification of the filler.

Areas Spain.
Certifications Quality, OHS and Environment: Approved as ADIF supplier of AVE aggregates. AENOR company registration, UNE- EN-ISO 9001-2015 QA standard, UNE-EN-ISO 45001-2018 in Occupational Health and Safety, Certificate of Registration of UNE-EN-ISO-14001-2015, Environmental Management System. Civil and Railway Works, Railway and Roads Service and Maintenance Contracts.

Share capital 3,113,012.00 euros
Activities Infraestructure, Maintenance, Others, Track.
Previous company
see other company tabs
Next company