Cookie Consent by FreePrivacyPolicy.com Company tab: CYCASA - Revista VÍA LIBRE - Fundación de los Ferrocarriles Españoles

Company: Company tab

CYCASA  
Canteras y Construcciones, S.A.

Versión en castellano

Postal address Henao, 18 - 1º
E-48009 Bilbao. Spain
Telephone +34 94 444 70 51   Fax +34 94 410 03 60   E-mail cycasa@cycasa.com
Company data
Management team

President: José Manuel Rodríguez Emaldi. CEO: Leónides Gutiérrez Pozo. Railway Works Manager: Miguel Moreno Díaz. Civil Works Manager: Fernando Aitor Cruz Lorenzo. Industrial Works Manager: José Manuel Tomé Landa. Head of Studies: Francisco Javier González de la Mora. Technical Manager: Oscar Rodríguez Barrio. Financial Manager: Imanol San Miguel Bikunia.

Activity Track Construction, Infrastructure and Superstructure, Track Maintenance, Aggregates Production and Supply, Civil Works and Building Works (housing, nursing homes, car parks, etc.).

Main products and services

Manufacture and supply of aggregates (ballast, gravel, etc.), having its own quarry in Santa Maria del Cubillo (Ávila). Construction and maintenance of railway lines (Feve, Metro Bilbao, ETS, ADIF, Ferrocarrils de la Generalitat Valenciana (FGV) and other Authorities). Construction and maintenance of roads and motorways. Urban development works, supply, sanitation and agglomerates. Building works (housing, nursing homes, car parks, etc.).

Activities by year

Railway Sector: Type 1 annual ballast supply (High Speed) for ADIF. Ballast supply on various high-speed sections for ADIF. Various track maintenance works (ADIF, ADIF ALTA VELOCIDAD, Metro Bilbao, ETS, ADIF-RAM), upkeep and urgent interventions in incidents at all national authorities, and different private clients.

Machinery and Equipment: Following with the policy of improving the machinery at CYCASA CANTERAS Y CONSTRUCCIONES, S.A., different types of machinery for civil engineering (shovels, trucks, etc.) have been added. Installation of asphalt plant. Enhancement of track alignment plotting systems and optimization of track geometry, as well as of the recorder, to be implemented in 2021 in tampers 08-16, 08-32 y 09-32.

Innovations

Research, Development, and Technological Innovation

CDW. Authorization of a treatment plant in Santa Maria del Cubillo.

2023-04-10, received Authorization for Exceptional Use of Rural Land.

THE TERRITORIAL COMMISSION FOR THE ENVIRONMENT AND URBAN DEVELOPMENT HEREBY AGREES: TO AUTHORIZE the use requested by CYCASA CANTERAS Y CONSTRUCCIONES, S.A. The expansion of Activities for the treatment of Construction and Demolition Waste, CDW, due to compliance with the current legislation in the field of Urban Development.

2023-04-12, the report of PHASE 1 of this implementation is presented in order to Inform the Territorial Environmental Service of Ávila about the status of the installation of the Crushing Plant for clean stone CDW and what the PIRCYL (Comprehensive Waste Plan of Castile and León) requires for the treatment of the selected clean stone waste.

2023-06-29, visit by a representative of the Territorial Environmental Service of Ávila in charge of our application, resulting in a positive inspection.

2024.02.02, The JCYL (Government of Castile and León) has authorized the organization with NIMA 050000769 for these activities, with the authorization number of the facility for the treatment of non-hazardous waste 07G424050000769. This authorizes the management of 21,000 Tn/year of LER Code 17.05.03 with treatment code R0507 for milling and another 27,000 Tn/year of LER codes 17.01.01 (concrete), 17.05.04 (earth and stones), 17.05.08 (railway ballast) with treatment codes R0506, R1203, and R1301.

It will enable us to reduce environmental impacts, increase reserves and consumption of natural aggregates, by incorporating CDW into MBs and granular layers, and by integrating the operation into a circular economy model included in the EU's 2030 targets.

HAZITEK ECO2D4.0 of the Basque Government, in the first quarter of 2023, the annuity of the project for the "Experimental dimensioning of road infrastructures using strategic waste, and development of a monitoring and simulation ecosystem for the selection of sustainable solutions" is approved. It was presented with the rest of the members of the group for a value of €726,777.46 and approved for €484,313.36.

The members that make up the group are Befesa with Waelz process ferrosite, FCC with bottom ash from the MSW incineration, Tubos Reunidos with black steel mill slag, Fuchosa with green smelting sands, and CYCASA with revalorized milling waste.

PRTR PATSYD 22/0032 of the Plan for the Recovery, Transformation and Resilience of the Economy, within the support program for sustainable transport specifically for the "renovation and adaptation of resources, machinery to produce sustainable road surfaces: reduction of carbon footprint and sound reducers", the monitoring and control reports of the project have been submitted to MITMA (Ministry of Transport and Sustainable Mobility) in the four quarters of 2023.

The project has been presented in conjunction with PADECASA, with an investment of €4,396,723.00 that was subsidized with €1,758,689.20. The most important investments include the processes of incorporation of RAP into cold recycling, with independent weighing of the two fractions of revalorized aggregate of the bituminous mixtures, renewal of the heat insulation, system of liquid and solid additives, wetting of the filler.

CYCASA's investments at the end of 2023 amounted to €1,231,401.99 (excluding VAT) with a matched subsidy of €492,560.79.

Areas Spain.
Certifications Quality, OHS and Environment:
Approved as ADIF supplier of AVE aggregates. AENOR company registration, UNE-EN-ISO 9001-2015 QA standard, UNE-EN-ISO 45001-2018 in Occupational Health and Safety, Certificate of Registration of UNE-EN-ISO-14001-2015, Environmental Management System. Civil and Railway Works, Railway and Roads Service and Maintenance Contracts.

Registration of the equality plan with national labour authority, 28 March, 2023, with number 012560.

Share capital 3,113,012.00 Euros
Activities Infraestructure, Maintenance, Others, Track.
Previous company
see other company tabs
Next company