Product name:
Modernization of the Western Line, Mira Sintra / Meleças – Caldas da Rainha section
Description:
The main actions are the rectification of some curves on the railway layout, the electrification of the line, and interventions in 6 stations and 3 halts, with the creation of passenger docks with minimum lengths of 150 m and technical rooms to accommodate the command and control equipment for circulation and telecommunications.
Web: