Product name:
Track doubling on the Renedo-Guarnizo section of the C-1 local train line between Torrelavega and Renedo
Description:
Construction of a concrete slab in Parbayón, supported by more than 80 piles, which facilitates the installation of the new double track in an area with a complicated orography. It includes the elimination of the level crossing at Parbayón through the construction of a subway.
Web: