Page 335 - Anuario FFCC - 2025
P. 335
Renovation of Line 6 of the Madrid Metro (Lot 1). Complete
renovation of the track superstructure on an 11.5 kilometers
section. The existing types of tracks will be replaced with the
latest state-of-the-art slab track, and the existing rail and coun-
ter-rail will also be renewed.
> Metro and Metropolitan Infrastructures. International. COSFESA guía de empresas
Adaptation of the Mondego Mobility System in Coimbra (CONTRATAS Y SERVICIOS FERROVIARIOS, S.A.U.)
to a BRT-Metrobus solution. Coimbra B - Portagem sec-
tion. Portugal. Dirección postal / Postal address:
Execution of the route of the Metrobus channel and surroun- C/Ramón Cabanillas 2-B, local 2.
ding streets in a section of 1.8 kilometers, which is mainly 32004 - Ourense. España
developed on the existing railway platform. Teléfono: +34 988 23 15 61
Email: cosfesa@grupoortiz.com
Construction of the machinery pool and offices of the Mon- Web: www.grupoortiz.com
dego Mobility System (Coimbra). Portugal.
Descripción:
Rubí Line of the Porto Metro. New metro line with a COSFESA es una empresa especializada en la Construcción y
length of 6.3 kilometers, extending between the Casa da Mantenimiento de Infraestructura ferroviaria y Superestructura
Música (Porto) and Santo Ovídio (Vila Nova de Gaia) sta- de vía, (Renovación, Rehabilitación y Montaje de vía y apa-
tions. It includes the construction of three above-ground ratos de vía,…). Ha obtenido, además, la licencia de Empresa
stations, five underground stations, a car park for 500 ve- Ferroviaria. Con una experiencia de 40 años en el sector ferro-
hicles, the connection with the Devesas railway station, as viario, COSFESA posee un importante parque de maquinaria
well as the construction of several viaducts and subways y cuenta con una amplia plantilla totalmente especializada.
for vehicles and people. A highlight of the project is the
construction of a new bridge over the Douro River, which Equipo directivo:
will be called “Ferreirinha“. Comité de Dirección:
Presidente Ejecutivo: Juan Antonio Carpintero López
Certifications: Consejero Delegado: Javier de la Mata Medina
Quality System Certificate: AENOR Certificate for ISO 9001. Vicepresidenta Ejecutiva: Sara Carpintero Grande
Certificate of the Environmental Management System: AENOR Secretario General: Juan Luis Domínguez Sidera
Certificate for ISO 14001. Director General Sostenibilidad y Transformación Digital:
Occupational Risk Prevention Certificate: Bureau Veritas Cer- Carlos Bárcena Martín
tificate for ISO 45001:2018. Director de Concesiones: Carlos Carpintero Grande
Director de Concesiones y Tesorería: Alberto de la Fuente Sanz
Directora Económico Financiera: María Carpintero Grande
Director General de Cosfesa y vocal del comité de dirección
de Grupo Ortiz: Alejandro Laca García
Principales productos y servicios:
Realización de Obras de Construcción, Modificación y Man-
tenimiento de Trazados de Vía Ferroviaria e Infraestructuras
asociadas: montajes de vía, estaciones, mantenimientos, re-
novaciones, plataforma, estructuras, en Líneas de Alta Veloci-
dad, Red Convencional y Red de ancho Métrico.
Productos estrella: MANTENIMIENTO: 1. Construcción y
Mantenimiento de Infraestructura y Superestructura en Lí-
neas de Alta Velocidad, Red Convencional y Red de Ancho
Métrico en todo el ámbito nacional. VÍA: 2. Obras de Reno-
Spanish Railway Yearbook 2025 Anuario del Ferrocarril 333