derived from periodical infrastructure and track inspections
                                                                or incidents and infrastructure improvement actions.
               Description:
               COSFESA is a company specializing in Construction and Main-  Infrastructure, track and switches maintenance in High-
               tenance of Railway Infrastructure and Track Superstructure, (Re-  Speed Lines in Galicia and the High-Speed Atlantic Axis.
               newal, Rehabilitation and Assembly of track and switches,...).   (Area of influence of the Irixo and A Mezquita headquarters).  guía de empresas
               It has also obtained the Railway Transport Company license.   The service is provided on the Pedralba de la Pradería-Ourense,
               With 40 years’ experience in the railway sector, COSFESA has   Ourense-Santiago, and Vigo Urzaiz-A Coruña High Speed lines,
               an important machinery fleet and a large, fully specialized staff.  with special infrastructures such as the Maceiras, Bolaños and
                                                                Espiño tunnels, Teixeiras and Río Ulla (HSL and CL) viaducts
               Management team:                                 and all kinds of structures, along 665 km of the general track
               Management board:                                line, managed from the Irixo and A Mezquita headquarters.
               Executive Chairman: Juan Antonio Carpintero López  Preventive maintenance activities are carried out on infrastruc-
               CEO: Javier de la Mata Medina                    ture, track, switches and headquarters, corrective maintenance
               Executive Vice-President: Sara Carpintero Grande  responding to incidents by providing relief to affected trains and
               General Secretary: Juan Luis Domínguez Sidera    small maintenance activities leading to an improvement in the
               Sustainability and Digital Transformation General Manager:   value of assets, safety, reliability, and comfort from the service.
               Carlos Bárcena Martín
               Concessions Director: Carlos Carpintero Grande   Infrastructure, track, and switches maintenance of the North
               Concessions and Treasury Director: Alberto de la Fuente Sanz  and Central High-Speed Network. (Area of influence of the
               Economic and Financial Director: María Carpintero Grande  Olmedo and Villada headquarters).
               General Manager of Cosfesa and member of the Management   The area which this service is provided is the High-Speed rail-
               Board of Grupo Ortiz: Alejandro Laca García      way access to the North and North-West railway corridor of
                                                                Spain, linking the cities of Madrid, Segovia, Valladolid, Palen-
               Main products and services:                      cia, León, and Burgos, with special infrastructures such as the
               Construction, Modification and Maintenance Works on Rail-  Guadarrama and San Pedro tunnels, viaducts, and all kinds
               way  Track Layouts  and associated  Infrastructures: track  as-  of structures, along 441.31 km of the general track line, ma-
               semblies, railway stations, maintenance, renewal, platform,   naged from the Olmedo (182.771 km) and Villada (258.541
               structures, on High-Speed Lines, Conventional Network and   km) headquarters. Preventive maintenance is carried out for
               Metric Gauge Network.                            surveillance, data evaluation, diagnosis and programming of
                                                                short, medium, and long-term interventions, corrective main-
               Top products: MAINTENACE: 1. Construction and Mainte-  tenance acting immediately in incidents and improvement ac-
               nance of Infrastructure and Superstructure on High-Speed   tions increasing the value of assets, and upgrading the safety,
               Lines, Conventional Network and Metric Gauge Network   reliability, and comfort from the service in the long term.
               throughout the country. TRACK: 2. Infrastructure and track
               renewal works on the Guillarei Station-Redondela Station   Track assembly works for the North-Northwest High-Speed Cor-
               section. Line 810.                               ridor. Madrid-Galicia High Speed Line and Maintenance. Lot 1:
                                                                Track assembly. Line section: Olmedo-Pedralba de la Pradería.
               Activities in the year:                          The remaining works consists of doubling the track (64 km)
               A selection of the projects under execution of COSFESA is in-  on the existing railway platform between Medina del Campo
               cluded below.                                    and Coreses, completing the assembly of 1,435 mm wide
                                                                double track between Olmedo and Pedralba de la Pradería,
               Infrastructure and track maintenance for conventional and   in a 197.495 km long, in addition to the rail links in Olmedo,
               metric gauge lines in the Northwest region of Spain.  Valladolid and Medina del Campo in a 24.60 km long.
               The area where this service is provided is the Conventional   The service involves maintenance of the infrastructure (plat-
               Railway Network belonging to the regional headquarters of   form), track (and switches), as well as the maintenance of
               León, Ourense, and Salamanca, with 2,471.60 km of track   buildings (offices, warehouses, workshops) and other faci-
               and the 796,20 km of the Northwest Metric Gauge lines.  lities of the La Hiniesta headquarter and other locations.
               Cyclic maintenance activities are carried out (infrastruc-
               ture and track  inspections  and adjustments, checks, track   Track renewal works on the section Ourense-Monforte de
               cleaning), maintenance activities according to the condition,   Lemos. Line 810.