company guide > Metros e Infraestructuras Metropolitanas. Internacional. Management team:
President: José Antonio Madrazo
Adaptación del sistema de movilidad del Mondego (Coim-
Salas. Managing Director: Pedro Cavero de Pablo.
bra, Portugal) a una solución de BRT (Metrobus). Tramo
Main products and services:
Coimbra B-Portagem.
Ejecución del trazado del canal de Metrobus y calles aledañas
Railway projects: infrastructure, track and electrification as-
sembly, stations, maintenance, metropolitan lines, trams, me-
en un tramo de 1.8 kilómetros, que se desarrolla principal-
mente sobre la plataforma ferroviaria actualmente existente.
tric gauge lines and private lines.
Top products: INFRASTRUCTURE: 1. Emergency works on
Construcción del parque de material y oficinas del Sistema de
movilidad del Mondego (Coimbra, Portugal).
the C3 commuter line in Valencia because of the floods of
October 2024. TRACK: 2. Renovation of switches and slee-
Línea Rubí del Metro de Oporto. Nueva línea de metro pers in the High-Speed Line Madrid-Sevilla. 3. Renovation of
con una longitud de 6,3 kilómetros, que se extiende ent- Line 6 of the Madrid Metro (Lot 1). MAINTENANCE: 4. Main-
re las estaciones Casa da Música (Porto) y Santo Ovídio tenance of conventional network infrastructure and track.
(Vila Nova de Gaia). Incluye la construcción de tres esta-
ciones en superficie, cinco estaciones subterráneas, un Activities in the year:
estacionamiento para 500 vehículos, la conexión con la Below, a choice of some projects under execution.
estación de ferrocarril de Devesas, así como la ejecución
de varios viaductos y pasos inferiores para vehículos y > Railways. Spain.
personas. Destaca en el proyecto la construcción de un
nuevo puente sobre el río Duero, que llevará el nombre Mediterranean Corridor of High-Speed Line between Murcia
de “Ferreirinha“. and Almería. Níjar-Río Andarax section. Railway substructu-
re and civil works. Spain.
Certificaciones: The project is a 25.5 kilometers long section that belongs to
Certificado del sistema de Calidad: Certificado AENOR para the HSL Murcia-Almería in Spain. It runs between the towns of
ISO 9001. Níjar and Almería, and involves the execution of earthworks,
Certificado del sistema de Gestión Medioambiental: Certifica- 16 viaducts, an 880 meters bored tunnel, 56 culverts for drai-
do AENOR para ISO 14001. nage, 9 underpasses and 4 overpasses. The viaduct over the
Certificado de Prevención de Riesgos Laborales: Certificado Andarax River, 1.414 meters long, stands out in this project.
Bureau Veritas para ISO 45001:2018.
Mediterranean Corridor of High-Speed Line between Murcia
and Almería. Totana-Lorca section. Railway substructure and
civil works. Spain.
The project consists in the construction of a new 7,5 kilome-
ters of double-track high-speed line, including the earthworks,
Description: the construction of 1 viaduct, 5 overpasses and one under-
Convensa, a railworks company pass, a new station in Lorca-San Diego, the expansion of La
Contratas y Ventas (Convensa) is a company specialising Hoya Station and a large amount of utility relocation works.
in railway construction. Its extensive experience of more
than 50 years in this sector, together with a large fleet Mediterranean Corridor of High-Speed Line between Murcia
of its own railway machinery and a technical and human and Almería section. Totana-Totana section. Railway sub-
team that is a benchmark in the sector, allows it to tackle structure and. Civil works. Spain.
any railway project with complete confidence. Furthermo- The project is a 10 kilometers long section that belongs to the
re, Convensa is part of the FCC Group, which gives it a HSL Murcia-Almería. It involves the execution of earthworks,
technological capacity and experience that positions it as 6 viaducts (one 954 m long over a highway), 4 overpasses and
a leader among national and international railway con- 2 underpasses and the construction of a new station in the
struction companies. municipality of Totana.