Page 332 - Anuario FFCC - 2024
P. 332
company guide keeping rail traffic interrupted until Jan 3th, due to heavy rain COXABENGOA
and wind in the last 3 weeks of 2022.
These activities are the reconstruction of the left embankment,
drainage, and reinforcement of the right slope at km 132/200,
reconstruction of the embankment platform at km 135/350 of
the Caldelas de Tui train stop, construction of a 180 m long
riprap to contain the landslide at km 142/500, reconstruction
of the sinkhole at km 143/725 embankment with a riprap and
replacement of pipes.
Emergency of consolidation of the infrastructure due to
Calle Energía Solar 1
landslides because of November 2023 rainstorms between E-41014 Sevilla. España
San Clodio Quiroga and Frieira. Lines 800 and 810. Infra- infra@coxabengoa.com
structure and track actions. www.coxabengoa.com
This contract awarded to COSFESA, involves the damage re-
pair due to the bad weather, causing rockfalls. The main ac- Descripción:
tivities are the slope consolidation at the km 82+850 in L810 Coxabengoa, utility global de agua y energía verticalmente in-
line, repair of the tunnel 57 exit in L800 line, trees felling and tegrada, que aplica soluciones tecnológicas innovadoras para
vegetation clearing on the Barbantes-Frieira section, and track el desarrollo sostenible, a través de su vertical de Infraestruc-
levelling with ballast removal. turas, desarrolla las actividades de ingeniería, construcción,
instalación y mantenimiento de infraestructuras, abarcando el
Geographic areas where your products and services are mar- desarrollo de proyectos de transmisión y distribución eléctri-
keted: ca, electrificación ferroviaria, construcción de instalaciones e
COSFESA carries out the activities which define its corporate infraestructuras para todo tipo de plantas y edificios, así como
purpose throughout the country. It has permanent facilities in la fabricación auxiliar eléctrica, de electrónica y de estructu-
Ourense (offices, warehouse, and machinery park). ras metálicas.
Certifications: Equipo directivo:
Quality and Environment: Presidente Coxabengoa: Enrique Riquelme
Quality Management System Certificate compliant with ISO CEO Vertical de Infraestructuras: Pablo Infante Cossío.
9001:2015 standard and Registration Number ES-0358/1997. Director de División Ferroviaria: Jose Javier González Solano.
Environmental Management System Certificate compliant Director de Oficina técnica e Ingeniería: Juan Carlos Cortés
with ISO 14001:2015 standard and Registration Number GA- Rengel.
2003/0021.
Occupational Health and Safety Management System Certi- Actividad: Construcción, infraestructuras, electrificación de
ficate compliant with ISO 45001:2018 standard and Registra- energía, electrificación ferroviaria, construcción de plantas
tion Number SST-0132/2008 (former OSHAS 18001:2007). renovables, instalaciones eléctricas y mecánicas, telecomu-
Audits on the Prevention of Occupational Risks Certificate nicación, señalización, fabricación de electrónica y equipos
with Registration Number APRL-2020/0154. eléctricos auxiliares, fabricación de estructuras metálicas, in-
All of them certified by AENOR INTERNACIONAL, S.A.U. geniería y consultoría, mantenimiento.
Principales productos y servicios:
Ingeniería, construcción y mantenimiento industrial y de in-
fraestructuras en los sectores de la energía, industria, medio-
ambiente, transporte y comunicaciones: líneas de transmisión
y distribución eléctrica, electrificación ferroviaria, instalacio-
nes e infraestructuras para todo tipo de plantas y edificios,
fabricación auxiliar eléctrica, de electrónica y de estructuras
metálicas.
Productos estrella: ELECTRIFICACIÓN: 1. Construcción y
330 Anuario del Ferrocarril 2024 Spanish Railway Yearbook