Page 379 - Anuario FFCC - 2023
P. 379
participates in the implementation of the MaaS (Mobility as a R&D Investment: Over 1,500 million Euros over the last six
Service) paradigm at the European level with projects such as years
Connective and Extensive. These developments have already Results: 172 million Euros
been tested in the form of pilot projects in several European
cities.
Indra works in the field of railway system signalling, guía de empresas
communications and automation as part of the X2RAIL
projects under the IP2 programme, and in the digitalisation and
optimisation of freight transport through projects such as Fr8rail-
III under IP5. Its developments in wireless communications for
on-board and on-track systems, standardised and interoperable
communications, and train integrity monitoring will soon be INECO
validated by demonstrators in test environments. (INGENIERÍA Y ECONOMÍA
DEL TRANSPORTE S.M.E. M.P., S.A.)
In the field of railway IoT, Indra plays a very important role in
the InSecTT project, which is part of the ECSEL programme, Pº de la Habana, 138
where we have deployed solutions such us Virtual Coupling E-28036 Madrid. España
based on 5G and edge computing. The company is also Tel.: +34 91 452 12 00
participating in the FENIX project (CEF-Connecting Europe Fax: +34 91 452 13 00
Facility programme), where it is working on indoor terminal ineco@ineco.com
access automation. It´s currently developing the SIMPLE www.ineco.com
project to design and implement the pioneering Spanish digital
logistics platform that will enable data sharing between all the Descripción: Referente en ingeniería y consultoría en el ámbito
actors in the chain and ensure between the different freight de la movilidad sostenible y la transformación digital, Ineco
transport modes and nodes, placing Spain at the forefront of lleva 50 años diseñando soluciones integrales, innovadoras
Europe in solutions of this sort. y tecnológicas que han permitido avanzar hacia un nuevo
modelo de movilidad más sostenible y más segura. Soluciones
Geographic areas where your products and services are que contribuyen de manera directa en la mejora de la calidad
marketed: de vida de millones de personas.
Spain (50%). America (19%). Europe (17%). Asia, Middle East
and Africa (14%). Equipo directivo:
Presidente: Sergio Vázquez Torrón. Directora General de
Certifications: Ingeniería y Consultoría: Patricia Rey. Director General de
Quality Management Systems: ISO 9001. Railway Quality Negocio Nacional: Moisés Gilaberte. Directora General
standard: ISO 22163: Certificación IRIS. Aerospace & Defense Negocio Internacional: Ainhoa Zubieta. Directora General
Quality standards: AQAP 2110, AQAP 2210, PECAL 2310, EN de Organización y Recursos: Magdalena Bodelón. Director
9100, EN 9110, UNE-EN 9120 Design Organization (ROD), Ejecutivo de Coordinación Corporativa: Celestino Rodríguez.
EASA part 145, EASA part 21G (POA), EASA part 21J (DOA), Secretario General: Alberto Torró. Director de Planificación,
PERAM 145. Development and maintenance processes of Eficiencia y Análisis: Daniel Latorre. Directora de la Oficina de
software: CMMi (Capabitity Maturity Model Integration), Innovación y Desarrollo de Producto: Ana Rojo.
TMMi (Test Maturity Model Integrated). Environment: ISO
14001, EMAS. Energy Management: ISO 50001. TI Service Actividad: Ingeniería y consultoría de referencia en el ámbito
Management: ISO/IEC 20000-1. Information Security: UNE- de la movilidad sostenible y la transformación digital.
ISO/IEC 27001. Innovation Management: CEN/TS 16555-
1. I+D+i: UNE 166002. Risk Management: ISO 31000. Principales productos y servicios:
Compliance: UNE 19601. Health & Safety ISO 45001; Gracias a su enfoque integral, multidisciplinar y tecnológico,
Collaboration business ISO 44001. Business Continuity: ISO Ineco se ha mantenido como actor de referencia en España en el
23301. Road Traffic Safety: ISO 39001. modo ferroviario, con una sólida trayectoria que se inició hace
más de 50 años. Entre los principales proyectos desarrollados
Turnover: 3,851 million Euros en el ámbito nacional, se encuentran la continuación de los
No. of employees: 57,000 trabajos para la modernización y ampliación de la Estación
Share capital: 35,330,880.40 Euros de Atocha; los trabajos realizados en la estación de Ourense;
Spanish Railway Yearbook 2023 Anuario del Ferrocarril 377