company guide  the railway tracks to integrate the railway in León city   Execution works of the project to extend the gauge at

                    (Spain).
                                                                     overpasses on the conventional railway line between
                                                                     Ourense-Monforte-Lugo. Spain.
                                                                     Adaptation of the gauge of 9 overpasses for the
                    Works for the execution of new track configuration as
                                                                     implementation of the new electrification in the
                    a result of the elimination of the telephonic blocks on
                    the metric gauge lines between Ferrol-Ortigueira and La
                                                                     conventional line section between Ourense-Monforte-
                    Asunción-Guardo. Spain.
                                                                     Lugo, making a lowering of platform and track. In
                                                                     addition, tracks will be extended at one station in order
                    The  main  objective  of  this  contract  is  to  adapt  the  rail
                    yard of 7 stations located on the Ferrol-Ortigueira section
                    of line 740 and 8 stations on line 790 of the metric
                                                                     and communications installations affected by these works
                    gauge network.  The works include the renewal  and
                                                                     will be replaced.
                    reconfiguration of tracks and track devices, the execution   to achieve a useful length of 750 meters, and all the safety
                    of new drainage systems, slope improvement and the   Execution  of  the  works  corresponding  to  the  track
                    remodelling and construction of new platforms.   devices renewal project (Phase 1) on the Madrid-Seville
                                                                     high-speed line. Spain.
                    Implementation of standard gauge on the Mediterranean   The works include the necessary works for the replacement
                    Corridor.  Section:  Valencia  Nord-Valencia  Joaquín   of a total of 63 track devices on the Madrid-Seville High
                    Sorolla. Spain.                                  Speed Line.
                    The project includes the necessary works to allow
                    standard gauge trains to enter both Joaquín Sorolla   Integral improvement of the infrastructure of the Madrid-
                    Station and Valencia Nord Station, which currently only   Seville high-speed railway line. Section C: Guadalmez-
                    accommodate Iberian gauge trains.                Córdoba. Spain.
                    The section to be worked on is about 2 km long, and the   The works include actions to improve the Madrid-Sevilla
                    works to be carried out include the implementation of   High Speed Line corridor in an 80 km section between
                    mixed gauge and conversion to standard gauge, the lifting   Guadalmez and Cordoba, including the conditioning
                    of track and track devices that are no longer in use and the   and  improvement  of  the  drainage  system,  cuttings,
                    installation of new ones, the construction of a new section   embankments, tunnels, enclosures and service roads.
                    of railway platform, and the construction of a section of
                    slab track.                                      Complete track renovation on the Gijón-Laviana section
                                                                     of the metric gauge network in Asturias. Spain.
                    Complete remodelling of Fuente de San Luis Station in   Complete renewal of the current track superstructure
                    Valencia  for  the  implementation  of  standard  gauge.   on a 45.6 km section. Works will be carried out on the
                    Spain.                                           platform, trenches, embankments and track superstructure
                    Renovation and/or adaptation to mixed gauge of the   including the renewal of ballast, construction of walls,
                    existing track superstructure on the general track that   construction of protective breakwaters, replacement of
                    does not yet have it and on a large part of the rail yard,   rails, sleepers and track devices.
                    including optimisation of the geometry.
                    In addition, a new platform will be created to extend   Track renewal on line 810 on the Ourense-Monforte de
                    passing tracks or connect existing tracks. Drainage,   Lemos section. Spain.
                    electrification, railway installations, services and   Track renewal (ballast, rail, sleepers and switches and
                    easements and auxiliary installations will be adapted to   track devices, not including electrification) to be done
                    the new track configuration.                     after the previous works of the infrastructure projects,
                                                                     including the dismantling and assembly of the safety and
                    Implementation of standard gauge on the Mediterranean   signalling installations affected.
                    Corridor.  Castellbisbal-Murcia  Section.  Castellón-
                    Vinaroz Subsection. Spain.                       Renewal  of  tracks  3  and  5  and  replacement  of  track
                    Implementation of standard gauge on the general tracks of   devices at Blanes Station. Barcelona to Maçanet Railway
                    the 77.5 km of the section, as well as on storage sidings   Line. Spain.
                    of the stations, extending some of them extending some of   The project includes the works for the renovation of tracks
                    them to adapt the parking lengths to 750 m, according to   3 and 5, including the laying of ballast, replacement of
                    the interoperable standard train.                sleepers, assembly of rails, construction of a new section