Page 277 - Anuario FFCC - 2023
P. 277
Metro systems: - Quality Management, according to the standard ISO 9001
Services for the Interventoria of Line 1 of Metro Bogotá - Environmental Management, according to the standard ISO
Chile Metro 14001
Quito Metro - Greenhouse Gases, according to the standard ISO 14064-1
Technical assistance services for the drafting of the construction
project: Extension of the Llobregat - Anoia line of FGC. Plaza Turnover: 640 million Euros
Espanya - Gracia. No. of employees: 11,311 guía de empresas
Services for the drafting of the informative study and construction
project for the extension of L5 of the Madrid Metro. Extension
to T1-T2-T3 of Adolfo Suárez - Madrid Barajas Airport.
Services for the drafting of the Southern Extension of the
Granada Metropolitan Railway. Armilla - Churriana de la Vega
- Las Gabias section.
Project for the construction of line 2 and line 4 of the Lima
Metro.
Project management services (Project Management), interface
coordination and technical assistance for line 2 of the Panama
Metro.
Technical assistance contract for the management of the works AZVI, S.A.U
corresponding to the execution of the infrastructure and track
superstructure of lines 1 and 2 of the Malaga Metro. Section: Sede Central / Head Office:
Guadalmedina-Atarazanas. Almendralejo, 5
E-41019 Sevilla. España
Innovations: Tel.: +34 954 99 93 20
R&D Fax: +34 954 99 92 00
The company continues to carry out important R&D&I www.azvi.es
activities to generate solutions and apply the most advanced
technologies to its customers’ needs. This activity is mainly Empresas del Grupo Azvi / Azvi Group companies:
carried out through projects in collaboration with customers, Azvi
universities, research centres and other companies, with Traccion Rail
incentives and funding from entities such as the Centre for the Manfevias
Development of Industrial Technology (CDTI) and the European Ispalvia
Commission (EC). Cointer
The three most important projects are: Super PV, which Azsuma
integrates AI into photovoltaic plants to reduce maintenance
costs and achieve new systems for obtaining solar energy, Equipo directivo:
based on state-of-the-art PV; Islander, which proposes the Director General: Roberto Gallardo Fernández-Díez.
design of a complete system to turn the German island of Director de Contratación y Desarrollo de Negocio:
Borkum into a fully autonomous and decarbonised energy Gabriel Peñafiel Trueba. Director de Obras Civiles: Carlos
enclave by 2030; and SDN-Microsense, which aims to design Puebla Montalvo. Director de Obras Ferroviarias: César
and provide a new resilient, multi-layered, SDN-compatible Domínguez González-Seco. Director de Edificación:
microgrid architecture. Pablo Reiter Fernández. Director de Estudios y Estrategia:
Juan Jesús García de Pablo. Director Técnico: Juan
Geographic areas where your products and services are Pérez Torres. Director de México: José María Martínez
marketed: Benavente. Director de América del Sur y Centroamérica:
Head office: Seville Offices: Spain, United Kingdom, Irlanda, Manuel Álvarez Asensio.
Bahrein, Dubai, Saudi Arabia, India, Mexico, Poland, Portugal,
Panama, Dominican Republic, Colombia, Ecuador, Chile, Actividad: Ferrocarril y construcción de obra civil,
Peru, Brasil, Andorra, Argentina, Italy, Germany, Morocco and logística, transporte ferroviario, mantenimiento de
Algeria. maquinaria pesada de vía e instalación y mantenimiento
de sistemas de electrificación ferroviaria.
Certifications:
Quality and Environment:
Spanish Railway Yearbook 2023 Anuario del Ferrocarril 275