Page 393 - Anuario FFCC - 2025
P. 393

the construction works of the signaling installations in the   Among the specific scientific and technical objectives, the fol-
                sections: Castelló de la Plana-L‘Ametlla de Mar and on the   lowing stand out:
                branch: Tortosa-L ‚Aldea-Amposta. Adif           1. To formulate a propoal of criteria guiding the selection of
               - Technical assistance for the drafting of projects, monitoring   the optimal excitation level, along with the preferred mo-
                and supervision of telecommunications works of the sub-  del calibration methodology, for the dynamic characteri-
                directorate of engineering and network construction. Lot 2.   zation of a masonry bridge (optimal BiME).  guía de empresas
                Geographic area south and east. Adif             2. To validate a new procedure using two representative
               - Technical assistance for the monitoring and supervision   structures, applying four excitation levels and different
                of the installation works of new electronic interlocking   EMA and OMA techniques for dynamic characterization.
                and replacement of track circuits in the Montcada split   3. To determine whether high-level dynamic excitation (E4) is
                station. Adif                                     necessary due to the appearance of any nonlinear behavior.
               - Technical assistance during the completion of the works for   4. To assess the need for adjusting nonlinear FEM-DEM models
                the comprehensive treatment of the contact line in the Sag-  to accurately reproduce the structural dynamic behavior.
                rera - Mollet - Granollers section of the Aeroport -Maçanet   5. To verify the proposed method for selecting the optimal
                – Massanesa line. Adif                            BiME through experimental testing.
               - Technical Assistance for the design projects and execution   6. To propose equivalent linear models for predicting the dy-
                of works for the interlocking installations, train protection   namic behavior of masonry bridges.
                systems, centralized traffic control, auxiliary detection sy-  7. To demonstrate the capability for predictive analysis.
                stems, power supply system, fixed telecommunications,
                mobile telecommunications, protection and security in-  The ACE FABRI project is being developed by INSE RAIL and
                stallations and affections of the Nudo de la Encina-Xàtiva-  is expected to be operational in 2026.
                Valencia section of the Mediterranean Corridor. Adif
                                                                Geographical areas where products and services are marketed:
               Operation and Maintenance projects               Spain and Portugal.
               - Projects for specific investment actions in the area of the
                maintenance division. South and northeast lot. Adif   Certifications:
               - Technical assistance for the comprehensive maintenance of   Quality, Environment, Health and Safety: ISO 9001:2015
                the track superstructure of Metro de Madrid.    (Quality) * ISO 14001:2015 (Environment) * ISO 45001:2018
               - Technical assistance and engineering of spare parts and   (Health and Safety)
                installations of the facilities maintenance area of Metro
                de Madrid.                                      No. of employees: 99 (end of 2024)
               - Inspection,  monitoring  and supervision of  the activities   Share capital: 5,2 million Euros (end of 2024)
                carried out to upgrade and adapt the entire high voltage,   R&D Investment: 325.000 Euros (end of 2024)
                low voltage and lighting electrical installation to the new   Sales: 10,5 million Euros (end of 2024)
                requirements and current regulations for low-voltage elec-
                trical installations in the Diego de León and Avenida de
                América stations of Metro de Madrid.
               - Technical Assistance for the monitoring, supervision, and
                control of asbestos removal works from signaling equip-
                ment on Line 7A of Metro de Madrid

               Innovations in 2024:

               ACE FABRI Project
               In 2024, Inse Rail launched the innovation project ACE
               FABRI in collaboration with the CDTI (Centre for the De-
               velopment of Industrial Technology). The project aims to
               develop a new methodology for structural monitoring to
               characterize the dynamic behavior of masonry structures,
               enabling the maintenance of railway structures made of
               ashlar or rubble masonry.




            Spanish Railway Yearbook 2025 Anuario del Ferrocarril                                               391
   388   389   390   391   392   393   394   395   396   397   398