company guide  railway transport installations.          - Feasibility study, preliminary design and construction pro-

                 Inse Rail has a multi-faceted team of experts in civil enginee-
                                                                     ject for an accessible connection between platforms, adap-
                                                                     tation and commissioning of the former Almodóvar del Río
                 ring, electric engineering, mechanics and telecommunicati-
                                                                     station (Córdoba). Adif
                 ons, who provide each individual customer with the service
                                                                    - Construction project for the new maintenance base in Ri-
                 and commitment to achieve their objectives.
                                                                     poll (Girona). Renfe
                 Inse Rail is at the forefront of technology and maintains a
                                                                    - Replacement project for switch number 11 at the Campo-
                 strong  commitment  to innovation,  evidenced by  its syste-
                                                                     manes PAET of type DMMHB1-60-190-0.11-CR-D. Adif
                 matic participation in R&D programs in collaboration with
                 Universities and Technological Research Centers, creating
                 and maintaining proprietary tools to respond to the needs and
                                                                   Construction Engineering projects
                                                                    - Technical assistance for the supervision and monitoring of
                 technical challenges of our activity.
                                                                     the construction works of the future Atocha transit station
                 Top products: INNOVATION ENGINEERING: Project GALI-  that will allow trains that leave from Chamartín Station to
                 BRAIL.                                              stop at Madrid’s southern terminal, and will also expand the
                                                                     terminal’s capacity Adif
                 Activities in 2024:                                - Technical assistance for the supervision and monitoring
                                                                     of the construction works to adapt the Madrid-Zaragoza
                 Consulting and Design Projects                      stretch to the Rolling Highway (RH) of the Algeciras-Zara-
                  - Construction project for the new railway access to the Ali-  goza route. Adif
                   cante airport and the new passenger station. Adif  - Technical assistance for the supervision and monitoring of
                  - Detailed design projects for the improvement of evacuati-  track overhaul and gage adaptation works in the Bobadilla–
                   on and ventilation conditions in case of fire in the subway   Ronda section, from km point 26+500 to km point 69+583
                   suburban stations of Embajadores, Getafe Centro and Parla   of the Bobadilla–Algeciras Line. Adif
                   (Metro de Madrid). Adif                          - Technical assistance for the monitoring and control of the
                  - Project design to extend the Diagonal – Baix Llobregat tram   works related to C.M.S. (Control, Command and Signaling)
                   to the center of Sant Feliu de Llobregat. Autoritat del Trans-  for the high-speed access channel to Valencia, including
                   port Metropolitá de Barcelona                     actions at Joaquín Sorolla and Valencia Nord stations. Adif
                  - Project for the new Alstom maintenance center in Santa   - Project management of railway systems works (signaling,
                   Perpetua de la Mogoda. Alstom                     communications, control, and safety) for the entire tram
                  - Project to upgrade the Vilapicina Workshop for the expan-  line to Alcalá de Guadaíra, between Pablo de Olavide
                   ding fleet. TMB                                   University and Montecarmelo.  Regional Government of
                  - Construction project for a workshop for rolling stock main-  Andalusia
                   tenance in southern Madrid. Adif                 - Supervision of the signaling system renewal works on Line
                  - Project to modernize an old railway depot in Ponferrada   7A of Metro de Madrid. Metro Madrid
                   with siding for trains 740 meters long. Ponferrada City   - Technical assistance for the management, control, and
                   Council                                           supervision of works related to energy remote control sy-
                  - Construction projects to extend the sidings of the Gene-  stems. Adif
                   ral Interest Railway Network to 750m. Lot 3. Southern   - Technical assistance for the supervision and monitoring of
                   Section. Adif                                     the works for the renewal of safety installations at A Susana
                  - Detailed  design  project  of  the  control,  command  and   station (Line 822 Zamora–A Coruña). Adif
                   signalling subsystem associated with the Master Plan for   - Technical assistance for the supervision and monitoring of
                   the Galician Railway Network, Northwest Plan (2017-  the comprehensive remodeling works at Grisén station. Adif
                   2025). Adif                                      - Management, auditing and coordination of the safety of the
                  - Construction projects for the electric traction substation,   signaling and telecommunications works in several sections
                   and associated transformation centers, and the energy re-  of the Portuguese National Railway Network. Infraestructu-
                   mote control of the Ronda-Algeciras section of the Bobadil-  ras de Portugal
                   la-Algeciras line. Adif                          - Technical assistance to monitor the works of the construc-
                  - Construction project for the electrification of the high-speed   tion project with actions to commission the access to the
                   line duplication Antequera – Granada. Section: Archidona   Barcelona airport’s new terminal. Barcelona commuter rail
                   Junction – La Chana Junction, and tracks 8 and 9 of Grana-  network. Adif
                   da station. Adif                                 - Technical assistance for the monitoring and supervision of




       390                                                     Anuario del Ferrocarril 2025 Spanish Railway Yearbook
   387   388   389   390   391   392   393   394   395   396   397