Page 293 - Anuario FFCC - 2025
P. 293

gineering Manager: Agustín Bonillo García. R&D Manager:   (including designing), financial and legal of the central transport
               Noemi Jiménez Redondo. Building Engineering Manager: José   terminal, commuting stations and massive transport system APM,
               Moriana Pericet. Construction Materials Laboratory Manager:   which includes passenger stations, approximately 19 km in the
               Manuel Salas Casanova. Geotechnics Manager: Isidro Ocete   municipiality of Rionegro (Colombia) *Metro stations at Line 17
               Ruiz. Health&Safety Manager: Cristina Cobalea Medina. Chief   (Sao Paulo, Brazil): Congonhas and Campo Belo, *Railway stati-
               Financial Officer and IT Manager: Andrés Céspedes Ortega.  ons at CPTM Line 13 (Sao Paulo, Brazil): Airport station, CECAP   guía de empresas
                                                                and Eng. Goulart. *Morro da Suade tunnel at coastal recovery
               Activity: Engineering and Consulting.            Project for Olimpic Games (Prefeitura de Rio de Janeiro, Brazil).

               Main products and services:                      Site supervision, Health, and Safety Coordination in rail-
               Centro de Estudios de Materiales y Control de Obra, S.A.   way works:
               (CEMOSA) is an engineering  consultancy and quality con-  *Site supervision for the Execution of the Construction Works of
               trol company in the field of construction. The main business   the New Railway Access to the Port of Seville *Health and Safety
               areas are: Transport Infrastructures (railways, roads, airports   Coordination during the execution of works on high-speed lines
               and ports), Building, Materials Quality Control, Geothecnics,   in the North and Northwest of Spain (Valladolid-Asturias). * Con-
               Certification, Sostenibility, Health and Safety and R&D. The   sultancy and Technical Assistance for the control and monitoring
               services offered in the field of Railway Infrastructures are: fea-  of the works and actions on the Monforte del Cid-Murcia High
               sibility studies, geotechnical studies, detailed designs, Project   Speed Line. Management of the commissioning of High-Speed
               Management, work direction, topography, material quality   Lines. *Quality and Healthy&Safety audit of platform construc-
               control, technical and environmental site supervision, testing   tion works at high-speed line Bobadilla-Granada (Andalusia,
               facilities, pathology studies, Health&Safety coordination, and   Spain) *Civil works, acoustic attenuation, and drainage repair at
               R&D.                                             high-speed line León-Asturias (Variante de Pajares) (Spain).

               Top products: ENGINEERING AND CONSULTING: 1. cem-  Quality Control for railway infrastructure:
               BOX Building Platform: Digital Twin for energy efficiency in   *Quality Control of the Construction Project for Line 5 of the
               buildings. 2. cemBOX Infra Platform: Digital Twin oriented   Bilbao Metropolitan Railway *Material quality control of Line
               Civil Infrastructure Asset Management Platform.  1 of Metro de Ciudad de Panamá (Panama) *Material quality
                                                                control of Lines 1 and 2 of Metro de Málaga (Spain) *Material
               Activities in the year:                          quality control of track construction of High Speed Train in the
               Some of the main and most representative railway activities   North corridor (Spain).
               during 2024 and previous years are listed as follows.
                                                                Activities in other fields of transport engineering:
               Railway infrastructure design:                   Some activities in other transport engineering fields are listed
               *Consultancy and Technical Assistance for the control and mo-  as follows.
               nitoring of works and actions on the Monforte del Cid-Murcia
               high-speed line. Management of the commissioning of high-  Airports:
               speed lines. *Removal of level crossings on the Córdoba - Mála-  *Engineering Services for Expansion Project of Jorge Chávez
               ga line (ADIF) *Revision, adaptation and construction project for   International Airport - newLIM (Peru) *Project Management
               pedestrian and vehicles bridge on the Madrid-Sevilla line at m.t.   Construction of South Terminal, Tocumen International Air-
               de Lora del Río (ADIF) *Consultancy services for the project of   port (Panama). *Masterplans for Pacifico area (Colombia)
               the suppression of the pedestrian level crossings of Camí de Ca   *Field flight Anadarko Moçambique Area 1 Monzanbique
               na Dolça in Verge de Lluc (Palma) and Sa Farinera (Marratxi) of   Lng (Mozambique) *Design Widening Taxiway echo. Interna-
               the Mallorca railway service network *Renovation of the track at   tional Airport Sangsters – Montego Bay (Jamaica) *Designing
               Aboño station, Port of Gijón *Drafting of projects for the removal   of the different actions (flight fields, control tower, SEI, urba-
               of level crossings on line of the conventional network in Orense-  nisation and accesses, water networks, automatic system for
               Monforte-Lugo (ADIF) *Project for the removal of level crossings   baggage) in the International Airport of Palmerola (Honduras)
               on the La Encina-Valencialine (Benifaió,Valencia) *Due Dili-  *Design of the terminal building and taxiway extension at In-
               gence for light rail in Barranquilla (Colombia) *Feasibility study   ternational Airport “El Dorado” (Bogotá, Colombia) *Contract
               for railway access to Container area in the Port of Buenaventura   for the design, construction, operation, and maintenance of
               (Colombia) *Consulting services to carry out the process of due   the infrastructure of the International Airport Rafael Núñez,
               diligence, intervention plans and integral structuration: technical   Cartagena (Colombia) *Supervision and conditioning of the




            Spanish Railway Yearbook 2025 Anuario del Ferrocarril                                               291
   288   289   290   291   292   293   294   295   296   297   298