company guide  Management team:                         Madrid-Valladolid-León and Burgos sections of the Madrid-

                                                                   Valladolid-León and Burgos high-speed lines (2023); Main-
                                                                   tenance services for the Madrid-Valladolid-León and Burgos
                                                                   sections of the  Madrid-Valladolid-León  high-speed lines
                                                                   (2023). (2023);  Execution of communications infrastructure
                 General Director: Alejandro Just; International Business Direc-
                 tor: Bertrand Devambez; National Business Director: Francis-
                                                                   renewal works in the north-west area (2023); Communicati-
                 co Martínez; Financial Director: Borja Enseñat; Engineering
                                                                   ons infrastructure renewal works in the north area; Execution
                                                                   of the 25 kV AC electrification project works on track 1,435
                 Director: Jorge Domingo; R&D Director: Rubén Jiménez.
                 Activity:
                                                                   reform and modernisation plan for line 6 traction centres,
                                                                   40% of which can be financed under the 2021-2027 ERDF
                 Syneox is a railway electrification company belonging to the
                 Cobra Industrial Services division (Cobra IS), part of the VINCI   between Xàtiva and Nudo de la Encina (2023); Works for the
                                                                   operational programme of the Community of Madrid. Lot 1:
                 group. Syneox has extensive national and international expe-  Reform and modernisation of the following CTRs on Line 6:
                 rience in the construction of catenary and substations for high   CTR Méndez Álvaro, CTR Manuel Becerra, CTR República Ar-
                 speed, conventional and urban lines, signalling, energy and   gentina, CTR Universitaria, CTR Lucero, CTR Mirasierra and
                 construction of associated civil works. Its activity continues   CTR Argüelles.
                 once construction is complete, carrying out maintenance.
                                                                   Geographic areas where your products and services are mar-
                 Main products and services:                       keted: Spain, Latin America (Dominican Republic, Chile), Is-
                 Electrification (catenary and substations for high speed, con-  rael, Saudi Arabia, India, China.
                 ventional and urban lines). Signalling. Energy. Associated civil
                 works. Maintenance.                               Certifications:
                                                                   Quality: Certificate ISO 9001:2015 nº ER-0200/1994 AENOR.
                 Top projects: ELECTRIFICATION: 1. Construction and main-  Environment: Certificate ISO 14001:2015 nº GA 2023/0010
                 tenance of the project for the overhead contact line and as-  AENOR.
                 sociated systems of the Murcia-Almeria high-speed Mediter-  Safety: Certificate ISO 45001:2018 nº SST-0002/2023 AE-
                 ranean corridor. Murcia-Lorca sections. 2. Construction and   NOR.
                 maintenance of the project for the traction electrical substa-  Adhered to “United Nations Global Compact”.
                 tion and associated auto-transformer centres on the Murcia-
                 Lorca section. Murcia-Almería high-speed line.    No. of employees: 643
                                                                   R&D investment: 1% of turnover
                 Activities in the year:                           Turnover: 80.000 (thousands of euros)
                 Projects  in  execution:  Execution  of  the  works  and  mainte-
                 nance of the project for the overhead contact line and asso-
                 ciated systems for the Murcia-Almeria high-speed Mediter-
                 ranean corridor. Murcia-Lorca sections; Execution of works
                 and maintenance of the construction project for the electrical
                 traction substation and associated auto-transformer centres on
                 the Murcia-Lorca section. Murcia-Almería high-speed line;
                 Execution of works on the construction project for the new
                 Ourense intermodal station and pedestrian walkway and the
                 construction project for the new Ourense intermodal station.
                 Covering of the track bed. Structure and urban development.

                 Projects awarded: Comprehensive management of civil pro-
                 tection installations in the tunnels belonging to the Chamar-
                 tín-Torrejón de Velasco, Madrid-Valladolid-León, Venta de
                 baños-Burgos and Olmedo-Zamora-Pedralba high-speed lines
                 (2023);  Maintenance  services  for  traction  energy  installati-
                 ons: overhead contact line, energy remote control, substati-
                 ons, auto-transformer centres and associated systems on the




       480                                                     Anuario del Ferrocarril 2024 Spanish Railway Yearbook
   477   478   479   480   481   482   483   484   485   486   487