Page 493 - Anuario FFCC - 2023
P. 493
interventions treatment plan, in lines with iberian track 166002:2014, AENOR IDI-0002/2007.
gauge (MIV) Period: 01/09/2021 - 31/08/2023 Sections: Criminal Compliance Management System Certificate:
5 - Centro and 2 – Norte. UNE-EN ISO 19601:2017. AENOR GCP-2020/0006.
Declaration of Verification of Greenhouse Emissions
INTERNATIONAL: Reporting of 2021: LLOYD´S REGISTER QUALITY
ASSURANCE ESPAÑA S.L.U.: ISO 14064-1:2018. LRQA guía de empresas
POLAND: Line 1: Modernisation of railway line L1 Section: Reference: SGI 6013190.
Koluszki – Czestochowa / Line E30: Section: Krzeszowice- Registration Certificate for VIAS with the Footprint
Krakow Mydlniki / Line E20/CE20 Modernisation of Register, CO compensation and absorption project of
2
railway line Siedlce, Lukow and Medzyrecz / Line 226: the Ministry for Ecological Transition and Demographic
Construction project for the improvement of the railway Challenge with the awarding of the ´Calculo y Reduzco`
access to the Gdansk port / Line 8: Modernisation of [Calculation and Reduction] mark 2021 (Code 2022-
Line 8. Section: Warszawa Okλcie – Radom (LOT A, B, a1563) and ‘Calculo, Reduzco y Compenso‘ 2021.
F) / Line 131: Project and Works: Modernisation of Line Codes: 2022-c174.
131. Section: Bydgoszcz-Chorzòw Batory / Line 311: Voluntary Cancellation of Emissions 2022 Certificate:
Modernisation of railway line 311. Section: Jelenia Góra - UNITED NATIONS. According to the voluntary
Szklarska Poreba Górna. Cancellation Procedure in the MDL Registry. Reference:
USA: Dulles Corridor. Phase 2 Lot B / Workshops and VC25371/2022.
garages. Station of Wachusett and depot facilities located BIM Management System Certificate: UNE-EN ISO
in Westminster - Massachusetts. 19650-2:2018 Certification no. VC 723155.
CANADÁ: Parking base Lincolnville / Installation of 12.5
km of double track and maintenance base in Ottawa. Turnover: Vias Group: 474.99 million Euros.
COLOMBIA: Railway repair of sections Bogotá-Belencito, No. of employees: Vias Group: 1,594 employees.
La Caro-Zipaquirá and Bogotá-Facatativá. Share capital: 23.74 million Euros.
FRANCE: Toulouse Underground / Gauge changing R&D Investment: 1.52 million Euros.
facilities in Cerbere / Roissy Underground / Montpellier Equity: 48.63 million Euros.
Tramway / Track renewal in Fideac – Bagnac / Renewal of
catenaries Paris - Lyon.
ITALY: Turin Underground.
PORTUGAL: Station of Ermesinde / Porto da Figuera
da Foz / Duplication and Electrification of section Cete
Peñafiel / Mondengo Underground / Station of Coimbra.
Geographic areas where your products and services are
marketed: Spain.
Certifications:
System certification: VOITH TURBO
Quality Management System Certificate: UNE-EN ISO
9001:2015, AENOR ER-0459/1995. Avenida de Suiza, 3
Environmental Management System Certificate: UNE-EN E-28821 Coslada. Madrid. España
ISO 14001:2015. AENOR GA-1999/0010. Tel.: +34 91 670 78 00
Energy Management System Certificate: UNE-EN ISO alberto.bethencourt@voith.com
50001:2018. LLOYD´S REGISTER QUALITY ASSURANCE www.voith.com
ESPAÑA, S.L.U. Certification no. 10376177.
Occupational Health and Safety Management System Equipo directivo:
Certificate: BUSTIO SERVICIOS DE AUDITORÍA, Director General: Mark Neumann. Director División Mobility:
S.L.:- LEGAL AUDIT. Certification no. 2809 / 2021 / Gonzalo Oliver Pinacho. Director área de Ferrocarriles: Alberto
DNV GL BUSINESS ASSURANCE ESPAÑA, S.L.U.: ISO Bethencourt. Responsable de producto transmisión de potencia:
45001:2018 Certification no. C535449. Jaime Herrero. Responsable de producto acoplamiento y
R&D&i Management System Certificate: UNE uniones articuladas: Juan Gómez. Responsables de atención al
cliente: Cristina Pérez y Elena Santamaría.
Spanish Railway Yearbook 2023 Anuario del Ferrocarril 491