Page 492 - Anuario FFCC - 2023
P. 492

company guide  Activities in the year:                    Valladolid: Sections: Madrid – Valladolid and Olmedo

                    Main Railway Works:
                                                                     – Medina del Campo; High Speed Railway Line Madrid
                                                                     – Castilla la Mancha - Levante - Murcia: Sections: Madrid
                                                                     – Valencia and Gabaldón – Albacete – Alicante - Murcia;
                    NATIONAL:
                                                                     High Speed Railway Line Madrid - Galicia: Section:
                                                                     Olmedo – Pedralba de la Pradería.
                    HIGH SPEED RAILWAY LINES:
                    High Speed Railway Line Madrid – Barcelona – French
                                                                     CONVENTIONAL LINES:
                    Border: Section: Trinidad Junction - Montcada (Barcelona)
                    / Track assembly line Figueres – Perpignan; High Speed
                    Railway Line Madrid  –  Castilla la Mancha - Levante -
                                                                     Adaptation of Iberian Gauqe to International Gauge for
                    Murcia: Section: Olalla – Arcas del Villar / Section: Buñol   ADIF:  Section: Castellbisbal/Papiol to Mollet San Fost
                                                                     both traffics / Track renewal, instalation phase. Section:
                    –  Cheste / Section Albacete  – Alpera bypass / Section:   Villar de Chinchilla-Alpera-Almansa. Madrid-Alicante
                    Monforte del Cid -  Aspe (Alicante) /  Track assembly   Line / Mediterranean Corridor.  Section: Castellbisbal -
                    Section: Gabaldón - Siete Aguas / Track assembly Section:   Murcia. Subsections: Sant Vicenç de Calders – Tarragona
                    Monforte del Cid – Túnel de Callosa; High Speed Railway   – Nudo de Vilaseca and Fuente de San Luis - Almussafes
                    Line Madrid - Valladolid: Section: Tres Cantos – Colmenar   / Remodelling of tracks and platforms at the Chamartín
                    Viejo  /  Guadarrama  tunnels  sections  3  and  4  /  Track   station (Madrid) / Remodelling of tracks and catenary in
                    assembly Section: Segovia - Fuente de la Cruz; High   the Atocha – Recoletos – Chamartín tunnel / Track renewal.
                    Speed Railway Line North - Northwest Corridor: Section:   Section: Plasencia del Monte –  Ayerbe / Infrastructure
                    Ponte Ambia – Taboadela (Orense) / Section: Prado - Porto   improvement works Monforte – Orense Line. Sections:
                    (Orense) / Track assembly Section: Olmedo - Pedralba de   009+059 -019+798 and 036+524 – 046+229 /  Track
                    la Pradería; High Speed Railway Line Valladolid – Burgos   duplication. Section: Astillero – Orejo.
                    - Vitoria: Section: Valladolid - Burgos and Venta de Baños
                    - Palencia, subsection: Venta de Baños junction (Palencia)   OTHER RAILWAY AUTHORITIES:
                    / Track assembly Section: Quintana del Puente – Estépar;
                    High Speed Railway Line Valladolid – Venta de Baños –   ETS: Infrastructure and trackwork for Loiola-Herrera
                    Palencia – León: Track assembly Section: Villada – León;   section in Lasarte-Hendaya Line / / Vitoria Tram System.
                    High Speed Railway Line Vitoria – Bilbao - San Sebastián:   Section: Abetxuko. 2  Phase / Works to execute track
                                                                                   nd
                    Section: Durango – Amorebieta - Etxano (Vizcaya); High   superestructure construction Project for Bilbao metro
                    Speed  Atlantic Railway Line:  Section:  As Maceiras -   line 3. Section 2; GISA: Metro de Barcelona: Track and
                    Redondela (Pontevedra) / Track assembly Section: Vigo   catenary works of the new L9 of Metro de Barcelona,
                    Urzaiz - Soutomaior (Pontevedra); High Speed Railway   Section: Terminal South to Ensanche Norte; Metro de
                    Line Antequera - Granada: Section: Bobadilla Junction –   Barcelona: Track renewal in line 5. Section: Sagrera –
                    Antequera / Track assembly Section: Antequera – Loja /   Horta / Track renewal in line 4. Section: Barceloneta
                    Antequera High Speed station; High Speed Railway Line   - Verdaguer;  Metro de Madrid: Trackworks on line
                    Madrid – Extremadura. Track assembly Section: Plasencia   12. Section 1: Los Espartales - San Nicasio / Track
                    – Cáceres / Track renewal. Section: Monfragüe – Plasencia   maintenance. Section 1: Sacedal / Track renewal in line
                    / Track assembly Section: Mérida By-pass;  High Speed   8. Section: Colombia – Pinar del Rey / Track renewal in
                    Railway Line Madrid – Sevilla: Infrastructure improvement   line 5. Section: Callao – Ópera.
                    works. Section  B:  Yeles – Guadalmez;  Extension and
                    remodelling of the high-speed rail lines and the passenger   CONVENTIONAL LINES MAINTENANCE:
                    building at Chamartín station.
                                                                     ADIF: Railway, infrastructure and corrective interventions
                    MAINTENANCE OF HIGH SPEED RAILWAY SYSTEMS:       treatment plan, in lines with iberian track gauge Period:
                                                                     01/01/2012 - 31/12/2017 Sections  A3 GM Madrid-
                    High Speed Railway Line Madrid - Sevilla: Section:   Sur, C3 GM Valladolid and B2 GM Tarragona / Railway,
                    Madrid  – Adamuz; High Speed Railway Line Madrid  -   infrastructure and corrective interventions treatment
                    Barcelona - French Border: Section: Madrid – Zaragoza   plan,  in  lines  with  iberian  track  gauge  (MIV)  Period:
                    High Speed Railway Line Madrid -  Toledo: Section:   01/01/2018 - 31/08/2021 Sections: 1 - Centro, 3 - Norte
                    La Sagra - Toledo; High Speed Railway Line Madrid -   and 4 – Noreste / Railway, infrastructure and corrective




       490                                                     Anuario del Ferrocarril 2023 Spanish Railway Yearbook
   487   488   489   490   491   492   493   494   495   496   497