Page 492 - Anuario FFCC - 2023
P. 492
company guide Activities in the year: Valladolid: Sections: Madrid – Valladolid and Olmedo
Main Railway Works:
– Medina del Campo; High Speed Railway Line Madrid
– Castilla la Mancha - Levante - Murcia: Sections: Madrid
– Valencia and Gabaldón – Albacete – Alicante - Murcia;
NATIONAL:
High Speed Railway Line Madrid - Galicia: Section:
Olmedo – Pedralba de la Pradería.
HIGH SPEED RAILWAY LINES:
High Speed Railway Line Madrid – Barcelona – French
CONVENTIONAL LINES:
Border: Section: Trinidad Junction - Montcada (Barcelona)
/ Track assembly line Figueres – Perpignan; High Speed
Railway Line Madrid – Castilla la Mancha - Levante -
Adaptation of Iberian Gauqe to International Gauge for
Murcia: Section: Olalla – Arcas del Villar / Section: Buñol ADIF: Section: Castellbisbal/Papiol to Mollet San Fost
both traffics / Track renewal, instalation phase. Section:
– Cheste / Section Albacete – Alpera bypass / Section: Villar de Chinchilla-Alpera-Almansa. Madrid-Alicante
Monforte del Cid - Aspe (Alicante) / Track assembly Line / Mediterranean Corridor. Section: Castellbisbal -
Section: Gabaldón - Siete Aguas / Track assembly Section: Murcia. Subsections: Sant Vicenç de Calders – Tarragona
Monforte del Cid – Túnel de Callosa; High Speed Railway – Nudo de Vilaseca and Fuente de San Luis - Almussafes
Line Madrid - Valladolid: Section: Tres Cantos – Colmenar / Remodelling of tracks and platforms at the Chamartín
Viejo / Guadarrama tunnels sections 3 and 4 / Track station (Madrid) / Remodelling of tracks and catenary in
assembly Section: Segovia - Fuente de la Cruz; High the Atocha – Recoletos – Chamartín tunnel / Track renewal.
Speed Railway Line North - Northwest Corridor: Section: Section: Plasencia del Monte – Ayerbe / Infrastructure
Ponte Ambia – Taboadela (Orense) / Section: Prado - Porto improvement works Monforte – Orense Line. Sections:
(Orense) / Track assembly Section: Olmedo - Pedralba de 009+059 -019+798 and 036+524 – 046+229 / Track
la Pradería; High Speed Railway Line Valladolid – Burgos duplication. Section: Astillero – Orejo.
- Vitoria: Section: Valladolid - Burgos and Venta de Baños
- Palencia, subsection: Venta de Baños junction (Palencia) OTHER RAILWAY AUTHORITIES:
/ Track assembly Section: Quintana del Puente – Estépar;
High Speed Railway Line Valladolid – Venta de Baños – ETS: Infrastructure and trackwork for Loiola-Herrera
Palencia – León: Track assembly Section: Villada – León; section in Lasarte-Hendaya Line / / Vitoria Tram System.
High Speed Railway Line Vitoria – Bilbao - San Sebastián: Section: Abetxuko. 2 Phase / Works to execute track
nd
Section: Durango – Amorebieta - Etxano (Vizcaya); High superestructure construction Project for Bilbao metro
Speed Atlantic Railway Line: Section: As Maceiras - line 3. Section 2; GISA: Metro de Barcelona: Track and
Redondela (Pontevedra) / Track assembly Section: Vigo catenary works of the new L9 of Metro de Barcelona,
Urzaiz - Soutomaior (Pontevedra); High Speed Railway Section: Terminal South to Ensanche Norte; Metro de
Line Antequera - Granada: Section: Bobadilla Junction – Barcelona: Track renewal in line 5. Section: Sagrera –
Antequera / Track assembly Section: Antequera – Loja / Horta / Track renewal in line 4. Section: Barceloneta
Antequera High Speed station; High Speed Railway Line - Verdaguer; Metro de Madrid: Trackworks on line
Madrid – Extremadura. Track assembly Section: Plasencia 12. Section 1: Los Espartales - San Nicasio / Track
– Cáceres / Track renewal. Section: Monfragüe – Plasencia maintenance. Section 1: Sacedal / Track renewal in line
/ Track assembly Section: Mérida By-pass; High Speed 8. Section: Colombia – Pinar del Rey / Track renewal in
Railway Line Madrid – Sevilla: Infrastructure improvement line 5. Section: Callao – Ópera.
works. Section B: Yeles – Guadalmez; Extension and
remodelling of the high-speed rail lines and the passenger CONVENTIONAL LINES MAINTENANCE:
building at Chamartín station.
ADIF: Railway, infrastructure and corrective interventions
MAINTENANCE OF HIGH SPEED RAILWAY SYSTEMS: treatment plan, in lines with iberian track gauge Period:
01/01/2012 - 31/12/2017 Sections A3 GM Madrid-
High Speed Railway Line Madrid - Sevilla: Section: Sur, C3 GM Valladolid and B2 GM Tarragona / Railway,
Madrid – Adamuz; High Speed Railway Line Madrid - infrastructure and corrective interventions treatment
Barcelona - French Border: Section: Madrid – Zaragoza plan, in lines with iberian track gauge (MIV) Period:
High Speed Railway Line Madrid - Toledo: Section: 01/01/2018 - 31/08/2021 Sections: 1 - Centro, 3 - Norte
La Sagra - Toledo; High Speed Railway Line Madrid - and 4 – Noreste / Railway, infrastructure and corrective
490 Anuario del Ferrocarril 2023 Spanish Railway Yearbook