Page 256 - Anuario FFCC - 2023
P. 256

company guide  Coordinación de Seguridad y Salud Laboral en varias obras de   1 and 6 of Metro de Madrid system. In 68 trains 2000 series
                  ADIF, Metro de Madrid y MINTRA. En el año 2020 AIRTREN ha
                                                                    and in 48 trains series 5000, respectively; Implementation
                  conseguido la certificación de seguridad y salud 45001:2018.
                                                                    of the  CBTC and Driverless system on  Line 7b (Metroeste)
                                                                    of the Madrid Metro; Signaling works and ATP / ATO of the
                                                                    Metronorte and Metroeste lines and Metroeste links with line
                  Productos  y  Sistemas:  SIMOVE:  Sistema de  monitorización
                  de la  velocidad de circulación  embarcado desarrollado
                                                                    7 and Metronorte with line 10 for MINTRA; ATO-CTC for the
                                                                    extensions of the Metro Madrid. Technical Assistance in the
                  con el Metropolitano de Tenerife  https://www.youtube.com/
                                                                    Hortaleza  Deposit  (Madrid); Modifications on  Speed    Codes
                  watch?v=hoEyW-S0S_I&feature=youtu.be.  WIRAIL:  Sistema
                                                                    and Distance to Go systems in several lines (4, 5 and 10) of the
                  inalámbrico  para  la  monitorización  de  parámetros  del  tren.
                  CROSS INSPECT: Sistema para la inspección de cruzamientos
                  de los desvíos. RIFLEX: Sistema para la inspección a velocidad
                                                                    in the new connection between the  Atocha and Chamartin
                                                                    stations. Signaling systems and train protection ERTMS, CTC
                  del carril. EcoS Sistema de medición Inteligente de energía a
                  bordo de material móvil. ASFA TOOL Simulador de marcha   Madrid Metro; Mounting of track in plate and electrification
                                                                    and auxiliary detection systems in the Madrid-Levante High
                  protegida con ASFA.                               Speed    Line (sections: Torrejón-Motilla, Motilla-Albacete and
                                                                    Motilla-Valencia),  Olmedo-Zamora-Galicia High Speed    Line
                  Áreas  geográficas  donde  comercializa  los  productos  y   ( section: Ourense-Santiago),  Zaragoza-Huesca  High  Speed
                  servicios: Todo el mundo.                         Line; High Speed   Line Valladolid-León and Valladolid-Burgos
                                                                    (VALEBU)  for ADIF;  Works for the  Platform Screen Doors
                  Certificaciones:                                  installation in the Madrid Metro; Substitution of the catenary
                  Calidad, Medio Ambiente y seguridad y salud: ISO 9001:2015   of  line  2  of  Metro  de  Madrid;  Track  assembly  work  in  the
                  and ISO 14001:2015 y 45001:2018.                  extension of Line 1 towards the Ensanche de Vallecas. Works
                                                                    for the implantation of electronic interlocking in the Deposit
                  Facturación: Consolidada con México.              of Canillejas de Metro de Madrid; Implementation and start-
                  Nº de empleados: Gran equipo de ingenieros ferroviarios.   up of the concessions of the light rail lines ML 1, ML 2 and
                  Inversión en I+D: 4%                              ML 3 of the Community of Madrid for MINTRA; Modifications
                                                                    in Substations of the Madrid Metro; Signaling Supervision in
                                                                    several Metro Lines of Madrid. Implementation of rail-ground
                                                                    protection implementation in 18 traction centers of the Madrid
                  Description:                                      Metro. Implementation of the signaling CBTC system and ITCS
                  Founded  by Antonio  Puyol,  with  40  years  of  experience  in   control center in the La Loma-Ciénaga Line and in the Rolling
                  the sector, and managed by Roberto Puyol, Airtren S.L. is an   Stock of FENOCO (Colombia); Implementation of the ERTMS
                  engineering Company characterized by its dynamism when   N1 system in the Sarmiento Line of Buenos Aires (Argentina).
                  facing  new  challenges.  His  success  lies  in  not  looking  for   For the tender for the concession of the Móstoles - Navalcarnero
                  customers but good partners, by leaving a trail of commitment   line for OHL; For the tender of the Lima urban train concession
                  and professionalism wherever it goes. This has allowed the   for  OHL;  Of the systems of  signaling  and protection of  the
                  company to build a really good network in the railway field.  train  ERTMS  of  High  Speed    Line  Zaragoza-Huesca  (section:
                                                                    Tardienta-Huesca) for ADIF; Of the systems of signaling and
                  Management team:  Roberto Puyol Escolar, Beatriz Escolar-  protection of the train  ERTMS,  CTC  and  auxiliary  detection
                  Noriega and Emilio Martín.                        systems in the Madrid-Levante High-Speed    Line (sections:
                                                                    Torrejón-Motilla, Motilla-Albacete and Motilla-Valencia). Of
                  Activity: Railway Safety, Engineering and Consulting.  the signaling and protection systems of the ERTMS, CTC and
                                                                    auxiliary  detection  systems  in  the  Olmedo-Zamora-Galicia
                  Main products and services:                       High Speed Line (section: Ourense-Santiago) for ADIF; Of the
                                                                    signaling systems of the Granada Tram. Evaluation of proposals
                  Top products: ASSESSMENT, CERTIFICATION, RESEARCH AND   to contests of the SCT Mexicana. Inspection of Quito Metro
                  TRAINING: 1. Assessment Body “AsBo”. MAINTENANCE: 2.   Facilities (Ecuador). Project for the installation of a “distance
                  CROSS INSPECT.                                    to go” signaling system (DTG) on Line 5 of the Madrid Metro
                                                                    for  Siemens.  Inspections  of  the  Level  Crossings  and  of  the
                  Activities in the year:                           Crossings between platforms for passengers in stations for the
                  Activities: 2007-2022:                            AESF. Drafting of signaling and communications projects for
                                                                    the  Asunción-Guardo and Ferrol - Ortigueira railway lines
                  Consulting and Technical Assistance for the implementation of   for ADIF. Drafting of construction projects for signaling and
                  CBTC system (Communications-Based Train Control) on lines   communications for the Asunción-Guardo railway lines; Ferrol



       254                                                     Anuario del Ferrocarril 2023 Spanish Railway Yearbook
   251   252   253   254   255   256   257   258   259   260   261