Page 495 - Anuario FFCC - 2025
P. 495

Sagunto. We have completed support services for the impro-  In progress:
               vement works on the inner network at the Port of Valencia.   DI0937 - APMIC3D. Process automation in civil 3D infra-
               Construction management has commenced for the renovation   structure models.
               of the signage systems and automatic train protection in the   DI0822-SOSTR. Sustainable design methodology for the main
               single-track sections of lines 1 and 2 of the FGV Metrovalen-  structural typologies.
               cia network, In Mallorca, we are carrying out the preliminary   DI0892-WHOLE LIFE CYCLE. Integration of the monetary and   guía de empresas
               study of the rehabilitation of the Migjorn railway line.   environmental costs associated with the construction and ope-
               In Barcelona, we are engaged in the construction supervision   ration phases of infrastructures in a collaborative environment
               of the renovation works of the Montcada Bifurcación railway   supported by BIM methodology.
               station, the construction supervision of the completion and   DI0805-BIM  TUNNEL.  Development  of  a  methodology  and
               commissioning of the new rail access to terminals T1 and T2   evaluation of tools for the BIM modelling of underground works.
               at Barcelona Airport, and the construction supervision of the   DI0825-SERAPIS PROJECT. Development of a corporate repo-
               passenger building upgrade at Sants station.     sitory of scripts and digital assets.
               In Palencia, construction supervision of the rail track dupli-  DI0946-ENHANCFRC. Improvements in the characterisation
               cation work and detailed design for the electrification of the   and optimisation of the design of fibre-reinforced concrete
               Las Arenas-Vilecha stretch, part of the north-northwest high-  elements in tunnels and underground works.
               speed corridor, are being carried out.           DI0849-BIM-BRIDGES. New procedures and workflows for
               In Euskadi, we continue with the detailed design for Lezo In-  designing bridges with BIM methodologies.
               termodal Terminal in Gipuzkoa. We are also involved in the   DI0862-ACOM-SR-2. Constitutive models and advanced cal-
               construction supervision services for the new railway station in   culation procedures in PLAXIS with a focus on construction
               Usurbil, Gipuzkoa and continue providing construction super-  procedures and land treatment.
               vision services in Bizkaia for the Elorrio - Elorrio section of the   DI0814-PARACUS-Parameterisation of the design and calcu-
               Vitoria - Bilbao - San Sebastian high speed line trackbed works.   lation of recurrent structures.
               In Castilla y León, we are carrying out the detailed design of   DI0837-YELLOW TILES. Automation and optimisation of pro-
               the trackbed on the Madrid-Basque Country-French border   cesses in projects to improve accessibility.
               high-speed line between Piernigas and Pancorbo.   DI0867-BIM CATENARIES. Design of aerial contact systems
               In  Seville, we are involved in preparing designs for the   with BIM methodology.
               southern section of Seville Metro Line 3 and the project and
               construction management of the completion of the railway sy-  Areas where products and services are marketed:
               stem to Alcala de Guadaira. In Málaga, we are carrying out the   North America, Latin America, Europe, the Middle East, Asia,
               construction supervision of the Málaga Metro Line 2 extensi-  Australia and Africa.
               on, Guadalmedina-Hilera section, and the preliminary study
               for the rail section Antequera-Granada-Almería.  Certifications:
                                                                TYPSA has the following certifications:
               Innovations in 2024:                             Quality, Environment, OH&S, R&D and BIM: ISO 9001:2015
               Completed:                                       certified by AENOR. ISO 14001:2015 - Environmental Ma-
               DI0823-INFRARISK. Platform for risk analysis and support for   nagement, certified by AENOR,  UNE 166002:2014 - R&D
               investment decisions and infrastructure life cycle planning.  Management, certified by AENOR. TYPSA‘s  Occupational
               DI0826-BIGTYPIA. Development of AI agents for internal   Health and Safety Management system is ISO 45001:2018
               knowledge management.                            certified. TYPSA‘s  BIM Information Management System is
               DI0808-TYPSA BIM PM 2024. New features of the multi-device   ISO 19650 19650/ 2 certified. Its Anti-Bribery Management
               platform to support project and construction management, inclu-  System is ISO 37001:2016 certified by AENOR.
               ding advanced analytics and AI modules for generating reports.
               DI0872-CFD VENTILATION. Work methodology for advan-  Figures:
               ced computational fluid simulation (CFD) in the field of venti-  Earnings: 54.80 million Euro
               lation (integration in civil works).             Revenue: 396.30 million Euro
               DI0802-TY META. Evaluation of the possible applications that   No of employees: 3,700
               the Metaverse could have in the field of Engineering.  Share capital: 2.4 million Euro
               DI0838-ATENEA. Development of an automated tool for   Equity: 204.90 million Euro
               checking the quality of models in Revit.         R&D investment: 2.1 million Euro






            Spanish Railway Yearbook 2025 Anuario del Ferrocarril                                              493
   490   491   492   493   494   495   496   497   498   499   500