Page 494 - Anuario FFCC - 2025
P. 494
company guide sessment. Preliminary design and feasibility studies. Detailed Areeiro and Braço de Prata, and to modernise the North Line bet-
design. Tender support services (studies and designs). Con-
ween Braço de Prata and Sacavém. We are also carrying out the
detailed design for the renovation of the Pocinho-Barca d’Alva
struction supervision services. Project and construction ma-
section, on the Duero Line. In Croatia, studies have continued for
nagement. Land acquisition management. Right-of-way. Ope-
the upgrade and duplication of the Dugo Selo-Novska Railway.
ration and maintenance support services. Technical reports.
Concession and PPP studies.
In Asia, in India, TYPSA is providing project and construction
Top products: ENGINEEERING AND CONSULTING: 1.
management services for the new Kanpur Metro and Agra Me-
tro networks. The scope includes a total of 62 km on 4 lines,
High-speed line between Merced and Bakersfield, Califor-
with 57 stations and 4 depots. We are also carrying out the
nia. 2. New Stockholm Metro Yellow Line between Frid-
hemsplan and Älvsjö, Sweden.
detailed design and construction management of the section
between Digras and Palshi stations on the new Yavatmal-Nan-
Activity in 2024: ded railway line in the state of Maharashtra.
In Africa, TYPSA is carrying out the detailed design, super- In Saudi Arabia, we are working on the tender design for the
vision and project construction management of the Tabora- Riad Metro Line 2 extension and the new Line 7.
Kigoma stretch and the detailed design of the Tabora-Isaka
railway section, in Tanzania. In Australia, we continue working with Sydney on the detailed
design and technical support during the construction of the
In North America, in Canada, we are providing supervision tunnel and the excavation sites of 5 stations, corresponding to
services for the construction of the tunnels in the Eglinton the 11 km twin central section of the Sydney Metro West Line,
Crosstown West LRT extension in Toronto. In the US, we are between The Bays and Sydney Olympic Park stations.
working on the detailed design and support services of the
High Speed Railway line track and systems between Merced In Spain, we have concluded the preliminary and detailed design
and Bakersfield, California, together with the detailed design of the Campo Grande High Speed Station in Valladolid. In Ma-
for the light rail extension in Phoenix, Arizona. drid, the major railway and urban development known as “Ma-
drid Nuevo Norte” sees TYPSA supervising the expansion and
In Latin America, support services continued for the work on remodelling of high-speed tracks and platforms, together with the
metro lines 2 and 4 in Lima, Peru. In Mexico, design supervisi- passenger building, which houses activity in all areas of the stati-
on of the suburban railway expansion between Lechería Station on, lobbies, platforms, new tracks, passenger waiting rooms and
and Felipe Ángeles International Airport is being carried out. In commuter connections, as well as a new high-speed technical
Brazil, we are overseeing the São Paulo Metro Line 6 (Orange) building. We are also carrying out the construction management
project. In the Dominican Republic, technical and environmen- and supervision of the Madrid Metro Line 11 extension.
tal advisory services are being provided for the detailed design In Galicia, we are engaged in the construction supervision of the
of metro line 2C, part of the Santo Domingo metro network. comprehensive renovation works on the stretch of railway between
Guillarei station (Pontevedra) and the Portuguese border. We are
In Europe, in Sweden, TYPSA has commenced the preliminary also preparing detailed designs for the extension of freight train si-
design for the infrastructure to increase capacity of the Norge- dings up to a useful length of 750 m, at the stations on the León-
Vänerbanan line between Öxnered and Göteborg, in Älvängen. Monforte de Lemos section of the Leon-A Coruña railway line.
We continue working on the design and construction support In Valencia, we are continuing with the construction manage-
services on the Kungsträdgården to Nacka and Gullmarsplan ment, and health and safety supervision and coordination
section of the Stockholm metro extension, as well as on the new of the pedestrian access tunnel to link Line 10 with Xàtiva
yellow line between Fridhemsplan y Älvsjö. In the United King- station, and with the design of Valencia´s tramway Line 11.
dom, work continues on the design of sections S1, S2, C2 and C3 Additionally, we are carrying out the construction supervision
of the HS2 high speed line between London and Birmingham. at the Intermodal and Logistics Terminal of Valencia-Fuente
In Ireland, we are providing consulting services for the remodel- San Luis. We are also actively collaborating on the construc-
ling and expansion of the 20 km long Kildare line in the Dublin tion supervision of the works for the Integration of the High-
area rapid transit network (DART). We are also carrying out the Speed railway infrastructure in Valencia. The scope includes
preliminary design and support services in the administrative taking the railway accesses to Joaquin Sorolla and Valencia
approval stage of the improvement works for the local railway Nord stations underground. We continue with the construc-
network in Cork. In Portugal, we are participating in the design tion management and environmental support services for the
to quadruple Lisbon’s Cintura ring railway line between Roma/ intermodal platform in the Parc Sagunt II logistics area, in
492 Anuario del Ferrocarril 2025 Spanish Railway Yearbook