INFRAESTRUCTURA                                INFRASTRUCTURE
                 Red arterial                                  Arterial railway
                 ferroviaria de
                                                               network of Valladolid.
           top products  electrificación y terminal de mercancías  works, electrification
                                                               East by-pass. Railway
                 Valladolid. Variante
                                                               substructure and civil
                 Este. Plataforma,
                                                               and freight terminal
                 La variante tiene una longitud total de 17,5 kilómetros, dos
                                                               It has a total length of 17.5 kilometers, with two branches in
                 ramales en el tramo inicial y dos enlaces provisionales. La
                                                               the initial section and two provisional links. The most unique
                 estructura más singular es el viaducto de 1.130,5 metros. Se
                                                               structure is the viaduct, with a total length of 1,130.5 meters. The
                 ejecuta también la electrificación de la variante y una terminal de
                                                               electrification of the east by-pass and a freight terminal are also
                 mercancías.
                                                               being built.
                                             http://www.fccco.com







                 Base de montaje y                             Assembly and
                                                               Arterial railway network
                 acopios de balasto                            storage base for
                                                               of Valladolid. East by-pass.
                 para el montaje                               track assembly of
                                                               Railway substructure and civil
                 de vía de la línea                            works, electrification and ía
                                                               the Murcia-Almer
                 de alta velocidad Murcia-Almería. Tramo:      high-speed line.
                                                               freight terminal
                 Murcia-Lorca.                                 Section: Murcia-
                                                               Lorca.
                                                               It has a total length of 17.5
                 Construcción de una base desde las que se suministraran los   kilometers, with two branches
                 materiales y balasto necesarios para el montaje de vía de la línea   Construction of a base from which the materials and ballast
                                                               in the initial section and two provisional links. The most unique
                 de alta velocidad Murcia-Almería. Posteriormente la base se   necessary for track assembly of the Murcia-Almería high-speed
                                                               structure is the viaduct, with a total length of 1,130.5 meters. The
                 destinará al mantenimiento de la línea.       line will be supplied. The base will subsequently be used for line
                                                               electrification of the east by-pass and a freight terminal are also
                                                               maintenance.
                                                               being built.
                                             http://www.fccco.com





                 EJECUCIÓN DE                                  EXECUTION OF
                 OBRAS DEL                                     WORKS FOR THE
                 PROYECTO DE                                   CONSTRUCTION
                 CONSTRUCCIÓN                                  PROJECT OF
                 DE PLATAFORMA                                 HIGH-SPEED
                 DE LA LÍNEA DE ALTA VELOCIDAD MADRID          RAIL PLATFORM
                 – EXTREMADURA. TALAYUELA-CÁCERES.             MADRID-EXTREMADURA. SECTION: TIÉTAR
                 TRAMO: RÍO TIÉTAR-MALPARTIDA DE               RIVER-MALPARTIDA IN PLASENCIA (SPAIN)
                 PLASENCIA.
                                                               Execution of the infrastructure for a double track of the 11.7 km
                 Ejecución de la infraestructura para doble vía del tramo de alta   long Río Tiétar-Malpartida de Plasencia high-speed section. Of
                 velocidad Río Tiétar-Malpartida de Plasencia de 11,7 km de   the fourteen structures to be built included in the project, the
                 longitud. De las catorce estructuras a realizar incluidas en el   construction of a railway viaduct with a mixed deck over the EX-
                 proyecto, destaca la construcción de un viaducto ferroviario con   108 and EX-A1 roads stands out.
                 tablero mixto sobre las carreteras EX-108 y EX-A1.