Page 361 - Anuario FFCC - 2025
P. 361

Activity: Infrastructure Construction and Engineering.  - Oural Tunnel located in the Monforte-Lugo section of Line
                                                                  800: A Coruña-León.
               Main products and services:                       - Platform of the Mediterranean High Speed corridor. Sec-
               Ferrovial Group is a leading global infrastructure operator,   tion: Lorca-Pulpí.
               with more than 70 years of experience, with extensive capabi-  - Platform of the Mediterranean High Speed corridor. Sec-
               lities to develop complete projects, from the conception of the   tion: Pulpí-Vera.               guía de empresas
               technical proposal, financing, design and construction to the   - Platform of the Madrid - Extremadura - Talayuela – Cáceres High
               operation and maintenance of infrastructures. It is listed simul-  Speed Railway. Section: Río Tiétar - Malpartida de Plasencia.
               taneously on Euronext Amsterdam, Nasdaq and the Spanish   - Remodeling of the A Coruña - San Cristovo station and si-
               stock market, where it is a member of the IBEX 35.  gnaling system, train protection, centralized traffic control
               The company has more than 25,000 employees, of which ne-  and communications.
               arly 6,500 are in Spain, and a presence in more than 15 coun-  - Undergrounding of the arterial railway network in the city
               tries, including the United States, Canada, the United Kingdom,   of Murcia. Undergrounding of the station and Barriomar
               Spain, Poland and Australia. The company focuses on four key   and undergrounding of Nonduermas.
               businesses: Toll Roads, Airports, Construction and Energy.  - Architecture,  installations  and  urban development of  the
               Both  technological  innovation  and  sustainability  are  essen-  Carmen Station (Murcia).
               tial cross-cutting themes in Ferrovial‘s corporate strategy. Its   - Maintenance depot and service building at the Murcia
               responsibility towards environmental protection, good gover-  freight logistics centre.
               nance and the development of the regions where it operates   - Algeciras-Zaragoza railway motorway. Section: San
               is endorsed by Ferrovial‘s continued presence in globally re-  Fernando-Santa Maria de la Huerta.
               cognised sustainability indices such as the Dow Jones Best in   - Emergency works as a result of the Storm DANA.
               Class Index (formerly the Dow Jones Sustainability Index).   - Platform of the Vitoria-Bilbao-San Sebastián High Speed
                                                                  Railway. Section: Legutiano-Escoriatza. Subsection II.
               Top products:  INFRASTRUCTURE: 1.  Execution of works   - Maintenance of infrastructure, track and switch and crossing
               for the Construction Project of High-Speed Rail Platform   of the Madrid South High Speed Railway Line. Lot 2 and 3.
               Madrid-Extremadura. Section: River-Malpartida in Plasencia   - Maintenance of infrastructure, track and switch and crossing
               (Spain). MAINTENANCE: 2. Application of Artificial Intelli-  for the Madrid Northeast High Speed Railway Line. Lot 2.
               gence for vegetation control.                     - Maintenance of infrastructure, track and switch and crossing
                                                                  for the Madrid Northwest High Speed railway line. Lot 1.
               Activities in the year:                           - Maintenance of infrastructure, track and switch and cros-
               Railway tracks                                     sing for the Plasencia-Badajoz High Speed railway line.
               Spain                                             - Maintenance of MIV Northwest. Lot 1.
               - Undergrounding of the R2 commuter line of Barcelona as   - Maintenance of MIV East. Lot 4.
                it passes through the urban area of Montcada I Reixac and   - Maintenance of MIV Center. Lot 5.
                construction of the new station.                 - Vegetation control by herbicide train in AV.
               - Accesses to La Sagrera station.                 - Vegetation control and margins on conventional lines. Lot 1.
               - Track assembly of La Sagrera High Speed station.   - Vegetation control and margins on conventional lines. Lot 3.
               - Architecture and facilities of La Sagrera Train Technical   - Vegetation control and margins on conventional lines. Lot 4.
                Treatment Area.                                  - Vegetation control and margins on conventional lines. Lot 5.
               - Architecture and installations of La Sagrera Train Technical   - Operation of ADIF locomotives. Northeast. Lot 1.
                Treatment Area (PHASE B).                        - Operation of ADIF locomotives. East. Lot 2.
               - Viaduct over the Ebro River and connection platform with the   - Towing of trains with materials for works to be carried out
                Castejón-Comarca de Pamplona High Speed Railway Line.  on the conventional gauge network
               - Renewal, change of gauge and adaptations of Xátiva-Nudo   - Railway Traction Services
                de la Teja.
               - Integral improvement of the infrastructure of the Madrid-  International
                Seville High Speed Line. Section: Guadalmez-Córdoba.  - Construction of the California High Speed Line. Section 4:
               - Renewal of turnouts (PHASE 1) in the Madrid-Seville High   Fresno-Bakersfield (USA).
                Speed Line.                                      - Design and construction of lots C2 and C3 of the British
               - Renewal of turnouts (PHASE 2) in the Madrid-Seville High   HS2 High Speed railway line (UK).
                Speed Line.                                      - Design and construction of track infrastructure of the British




            Spanish Railway Yearbook 2025 Anuario del Ferrocarril                                              359
   356   357   358   359   360   361   362   363   364   365   366