Page 268 - Anuario FFCC - 2024
P. 268
company guide between station platforms. Catalonia and Valencia. Lot 3. track superstructure of lines 1 and 2 of the Malaga Metro. Sec-
Projects within the scope of the sub-directorate of operati-
tion: Guadalmedina-Atarazanas.
ons of the northeast conventional network. Infrastructure and
Innovations:
track, energy, safety facilities and telecommunications subsy-
R&D
stems (4 lots).Lot 1: infrastructure.
The company continues to carry out important R&D&I ac-
Projects in the field of the sub-directorate of operations of the
tivities to generate solutions and apply the most advanced
north-east conventional network. Subsystems of infrastructure
technologies to its customers’ needs. This activity is mainly
and track, energy, safety installations and telecommunications
(4 lots).
universities, research centres and other companies, with in-
Lot 2: track
centives and funding from entities such as the Centre for the
Metro systems: carried out through projects in collaboration with customers,
Development of Industrial Technology (CDTI) and the Euro-
pean Commission (EC).
Oporto Metro - Extension Yellow Line. Portugal. (Project Ma-
nagement Consultancy) The three most important projects are: Super PV, which inte-
Oporto Metro - Ruby Line. Portugal. (Design consultancy) grates AI into photovoltaic plants to reduce maintenance costs
Delhi Metro - Line 8, Phase IV. India (Design consultancy) and achieve new systems for obtaining solar energy, based
Mumbai Metro – Line 3 and 7. India (Design Consultancy) on state-of-the-art PV; Islander, which proposes the design
Jaipur Metro - Lines 1C and 1D. India (Design consultancy) of a complete system to turn the German island of Borkum
Mumbai Metro - Line 2B, 3, 7. India (Project Management into a fully autonomous and decarbonised energy enclave by
Consultancy) 2030; and SDN-Microsense, which aims to design and provi-
NCRCT Delhi Meerut RRTS. Phase 1. India (Project Manage- de a new resilient, multi-layered, SDN-compatible microgrid
ment Consultancy) architecture.
Services for the Interventoria of Line 1 of Metro Bogotá
Services for the supervision of Line 1 of the Bogota Metro Geographic areas where your products and services are mar-
Supervision of sections 2, 3 and 4 of Line 7 of the Santiago keted:
Metro (Chile) Head office: Seville.
Supervision of the extension of line 3 of the Santiago metro Offices: Spain, United Kingdom, Irlanda, Bahrein, Dubai, Sau-
(Chile) di Arabia, India, Mexico, Poland, Portugal, Panama, Domini-
Supervision of lines 4, 5 and 6 of the Monterrey metro (Me- can Republic, Colombia, Ecuador, Chile, Peru, Brasil, Andor-
xico) ra, Argentina, Italy, Germany, Morocco and Algeria.
Supervision of the Santo Domingo metro line 1 extension (Do-
minican Republic) Certifications:
Design L2 and L4 of Lima metro (Peru) Quality and Environment:
Supervision of L1 Quito Metro (Ecuador) - Quality Management, according to the standard ISO 9001
Technical assistance services for the drafting of the construc- - Environmental Management, according to the standard ISO
tion project: Extension of the Llobregat - Anoia line of FGC. 14001
Plaza Espanya - Gracia. - Greenhouse Gases, according to the standard ISO 14064-1
Services for the drafting of the informative study and construc-
tion project for the extension of L5 of the Madrid Metro. Ex- Turnover: 717 million Euros
tension to T1-T2-T3 of Adolfo Suárez - Madrid Barajas Airport. No. of employees: 12.500
Services for the drafting of the Southern Extension of the
Granada Metropolitan Railway. Armilla - Churriana de la
Vega - Las Gabias section.
Project for the construction of line 2 and line 4 of the Lima
Metro.
Project management services (Project Management), interface
coordination and technical assistance for line 2 of the Panama
Metro.
Technical assistance contract for the management of the
works corresponding to the execution of the infrastructure and
266 Anuario del Ferrocarril 2024 Spanish Railway Yearbook