company guide  initial level at the exit of it, while the High Speed   line   Renovation of the superstructure of the mixed gauge track

                    would have a substantially horizontal layout.
                                                                     or adaptation to this gauge where it does not yet exist
                                                                     on the general track and on a large part of the rail yard,
                                                                     including optimisation of the geometry. Other works to
                    Track assembly and execution of installations in technical
                    areas for trains at La Sagrera. The contract for the main
                                                                     be carried out are the creation of new platform to sort rail
                    work has been complemented with the track assembly
                                                                     tracks, and the adaptation of the drainage, electrification,
                                                                     railway installations, services and easements and auxiliary
                    contract, which includes the  complete work for the
                    commissioning of the high-speed tracks at La Sagrera, and
                                                                     installations to the new track configuration.
                    the contract for the architecture and installations of the
                    technical treatment area for trains.
                                                                     Riyadh  Metro.  Lines  4,  5  and  6  (Saudi  Arabia).  The
                    Arterial  railway  network  of  Valladolid.  East  by-pass.   > Metro and Metropolitan Infrastructures
                    Railway substructure and civil works. It has a total length   project includes the design and construction of lines 4
                    of 17.5 km, with 2 branches in the initial section and two   (yellow), 5 (green) and 6 (purple), which will have 25
                    provisional links with the current route at the beginning   stations for which 64.6 kilometers of subway tracks will
                    and end of the section. A variant in Iberian gauge will be   be required, 29.8 kilometers of viaducts , 26.6 kilometers
                    developed, mainly for the transport of merchandise, on   of underground roads and 8.2 kilometers of surface roads.
                    which will be located a New Railway Complex, which   For the construction of the three lines, two Tunnel Boring
                    will have access in international gauge. The layout in plan   Machines of the type TBM (tunnel boring machine), of
                    with design speed of 160 km / h, runs on the surface along   9.77 meters in diameter, were used to excavate complete
                    its entire length except in 2 km in which the ground runs   section tunnels. Dhafrah was the first tunnel boring
                    underground, being mostly false tunnel. The type section   machine to start operations and Sanah was the first to
                    of the platform is suitable for a double track of Iberian   reach a station. Currently, 80% of the project’s progress has
                    gauge  with an  entree of  4.0 m,  although  in a  zone of   been achieved, obtaining constructive milestones that are
                    6 km the platform is extended to accommodate a third   relevant to the proper development of the infrastructure.
                    track in UIC gauge, to be installed in the future. As for
                    the structures, the variant has 1 viaduct, 5 underpasses,   Lima Metro. Line 2 and branch line 4 (Peru). The project
                    8 overpasses and a pedestrian walkway. The most unique   includes the design, construction, financing, operation
                    structure is the viaduct of “Los Tramposos”, on the N-601   and maintenance of Line 2 of the Lima Metro and a
                    road, with a total length of 1,130.5 meters.     branch of Line 4, which will reach the airport, for an
                                                                     amount of 3,900 million euros. Line 2 will have a length
                    Construction  of  the  freight  terminal  of  the  railway   of 27 kilometers and will cover the east-west axis of Lima,
                    complex and its connection with Valladolid’s new arterial   from Ate to Callao. Once in operation, will serve more
                    railway network.                                 than 600,000 people a day, which will save up to ninety
                    Construction of the freight terminal of the new arterial   minutes on its journey. For its part, the branch line 4,
                    network’s railway complex. It has a set of tracks for   which will link the Peruvian capital with the airport, will
                    the entry, exit and formation of trains, and a loading/  run along 8 kilometers of tunnel, from Faucett avenues to
                    unloading area consisting of a concrete slab 750 m long   Nestor Gambetta.
                    by 50 m wide.
                                                                     Toronto  Subway  Extension  of  TTC  Line  2  (Toronto,
                    Track duplication of the R-3 commuter line (Barcelona).   Canada).  Line  2  will  be extended  by  7.8  kilometres,
                    Parets  del  Vallés-La  Garriga  section.  Track  and   including new stations and connections to Line 5, TTC
                    electrification.  Track duplication in a 16 km section   bus services and Durham Region Transit. The extension
                    including platform and track, structures (9 viaducts,   will replace the existing Line 3, improving the customer
                    7 overpasses, 9 underpasses, 28 walls), drainage (19   experience by providing fast and seamless access to the
                    culverts for drainage, ditches, collectors), electrification   city and helping to reduce travel times.
                    (catenary), railway installations, and restoration of affected
                    services and easements.                          Metro of Madrid (Spain). Maintenance. Maintenance
                                                                     actions consisting of replacement of track devices,
                    Complete  remodelling  of  Fuente  de  San  Luis  Station   substitution  of  support  system  and  rail  fixings,  rail
                    (Valencia) for the implementation of standard gauge track.  renewal, substitution of sleepers, track ripple, geometric