Page 501 - Anuario FFCC - 2025
P. 501
Connection Madrid – Valladolid and Madrid – Olmedo- Za-
mora in the Olmedo Area. Phase 1; High Speed Railway Line
North - Northwest Corridor: Section: Ponte Ambia – Taboade-
Management team: la (Orense) / Section: Prado - Porto (Orense) / Track assembly
Sole Director: José Maria Aguirre Fernández; Section: Olmedo - Pedralba de la Pradería; High Speed Rail-
Production Manager: Antonio Álvarez-Cedrón Hernández; way Line Valladolid – Burgos - Vitoria: Section: Valladolid - guía de empresas
Technical and Bids Manager: José Manuel Díez Roncero; Burgos and Venta de Baños - Palencia, subsection: Venta de
Administration and Finance Manager: Manuel Rodríguez Huerta; Baños junction (Palencia) / Track assembly Section: Quintana
Human Resources and General Services Manager: Carlos del Puente – Estépar; High Speed Railway Line Valladolid –
Covo Vicente; Venta de Baños – Palencia – León: Section: South access to
Machinery Manager: Javier Del Río Urra; Palencia / Track assembly Section: Villada – León; High Speed
Risk Prevention, Quality and Environment Manager: María Railway Line Vitoria – Bilbao - San Sebastián: Section: Durango
Rincón Fernández; – Amorebieta - Etxano (Vizcaya); High Speed Atlantic Railway
Legal Advisory Manager: Yovana Carnicero Costa. Line: Section: As Maceiras - Redondela (Pontevedra) / Track as-
sembly Section: Vigo Urzaiz - Soutomaior (Pontevedra); High
Activity: Speed Railway Line Antequera - Granada: Section: Bobadil-
Construction of civil and building works (Specialised in rail- la Junction – Antequera / Track assembly Section: Antequera
way infrastructure and superstructure). – Loja / Antequera High Speed station; High Speed Railway
Line Madrid – Extremadura. Track assembly Section: Plasencia
Main products and services: – Cáceres / Track renewal. Section: Monfragüe – Plasencia /
CONSTRUCTION: Railway systems, highways, hydraulic Track assembly Section: Mérida By-pass / HSRL Connection in
works, buildings, urban developments, environmental works Mérida. Platform and track; High Speed Railway Line Madrid
and gas pipelines. Latest railway technology, specialised in – Sevilla: Infrastructure improvement works. Section B: Yeles –
construction, renewal, conservation and maintenance of rail- Guadalmez / Remodelling of tracks at the Puertollano station;
way infrastructures. Central pool of machinery with its own Extension and remodelling of the high-speed railway tracks
turn-out in Pancorbo (Burgos). and the passenger building at Chamartín station.
Top products: INFRAESTRUCTURE: 1. Remodeling of tracks MAINTENANCE OF HIGH SPEED RAILWAY SYSTEMS:
at the Chamartín station / Extension of HS tracks and pas- High Speed Railway Line Madrid - Sevilla: Section: Madrid
senger building at Chamartín station. MAINTENANCE: 2. – Adamuz; High Speed Railway Line Madrid - Barcelona -
Maintenance of track superstructure and platform on railway French Border: Section: Madrid – Zaragoza High Speed Rail-
lines. TRACK: 3. Leaders in Railway Superstructure Works. way Line Madrid - Toledo: Section: La Sagra - Toledo; High
TRAINING, CERTIFICATION, RESEARCH: 4. Carbon foot- Speed Railway Line Madrid - Valladolid: Sections: Madrid
print registry. – Valladolid and Olmedo – Medina del Campo; High Speed
Railway Line Madrid – Castilla la Mancha - Levante - Mur-
Activities in the year: cia: Sections: Madrid – Valencia and Gabaldón – Albacete
Main Railway Works: – Alicante - Murcia; High Speed Railway Line Madrid - Gali-
cia: Section: Olmedo – Pedralba de la Pradería; High Speed
NATIONAL: Railway Line Madrid - Asturias: Section: Galicia Junction –
HIGH SPEED RAILWAY LINES: La Robla – Pola de Lena.
High Speed Railway Line Madrid – Barcelona – French Bor-
der: Section: Trinidad Junction - Montcada (Barcelona) / Track CONVENTIONAL LINES:
assembly line Figueres – Perpignan; High Speed Railway Line ADIF: Mediterranean Corridor. Section: Castellbisbal - Murcia.
Madrid – Castilla la Mancha - Levante - Murcia: Section: Olalla Subsections: Sant Vicenç de Calders – Tarragona – Nudo de Vila-
– Arcas del Villar / Section: Buñol – Cheste / Section Albace- seca and Fuente de San Luis - Almussafes / Remodelling of tracks
te – Alpera bypass / Section: Monforte del Cid - Aspe (Alican- and platforms at the Chamartín station (Madrid) / Remodelling of
te) / Track assembly Section: Gabaldón - Siete Aguas / Track tracks and catenary in the Atocha – Recoletos – Chamartín tunnel
assembly Section: Monforte del Cid – Túnel de Callosa; High / Track renewal. Section: Plasencia del Monte – Ayerbe / Infra-
Speed Railway Line Madrid - Valladolid: Section: Tres Can- structure improvement works Monforte – Orense Line. Sections:
tos – Colmenar Viejo / Guadarrama tunnels sections 3 and 4 009+059 -019+798 and 036+524 – 046+229 / Track duplica-
/ Track assembly Section: Segovia - Fuente de la Cruz / HSRL tion. Section: Astillero – Orejo / Algeciras – Zaragoza Railway
Spanish Railway Yearbook 2025 Anuario del Ferrocarril 499