Page 501 - Anuario FFCC - 2025
P. 501

Connection Madrid – Valladolid and Madrid – Olmedo- Za-
                                                                mora in the Olmedo Area. Phase 1; High Speed Railway Line
                                                                North - Northwest Corridor: Section: Ponte Ambia – Taboade-
               Management team:                                 la (Orense) / Section: Prado - Porto (Orense) / Track assembly
               Sole Director: José Maria Aguirre Fernández;     Section: Olmedo - Pedralba de la Pradería; High Speed Rail-
               Production Manager: Antonio Álvarez-Cedrón Hernández;   way Line Valladolid – Burgos - Vitoria: Section: Valladolid -   guía de empresas
               Technical and Bids Manager: José Manuel Díez Roncero;   Burgos and Venta de Baños - Palencia, subsection: Venta de
               Administration and Finance Manager: Manuel Rodríguez Huerta;   Baños junction (Palencia) / Track assembly Section: Quintana
               Human Resources and General Services Manager: Carlos   del Puente – Estépar; High Speed Railway Line Valladolid –
               Covo Vicente;                                    Venta de Baños – Palencia – León: Section: South access to
               Machinery Manager: Javier Del Río Urra;          Palencia / Track assembly Section: Villada – León; High Speed
               Risk Prevention, Quality and Environment Manager: María   Railway Line Vitoria – Bilbao - San Sebastián: Section: Durango
               Rincón Fernández;                                – Amorebieta - Etxano (Vizcaya); High Speed Atlantic Railway
               Legal Advisory Manager: Yovana Carnicero Costa.  Line: Section: As Maceiras - Redondela (Pontevedra) / Track as-
                                                                sembly Section: Vigo Urzaiz - Soutomaior (Pontevedra); High
               Activity:                                        Speed Railway Line Antequera - Granada: Section: Bobadil-
               Construction of civil and building works (Specialised in rail-  la Junction – Antequera / Track assembly Section: Antequera
               way infrastructure and superstructure).          – Loja / Antequera High Speed station; High Speed Railway
                                                                Line Madrid – Extremadura. Track assembly Section: Plasencia
               Main products and services:                      – Cáceres / Track renewal. Section: Monfragüe – Plasencia /
               CONSTRUCTION:  Railway systems, highways, hydraulic   Track assembly Section: Mérida By-pass / HSRL Connection in
               works, buildings, urban developments, environmental works   Mérida. Platform and track; High Speed Railway Line Madrid
               and gas pipelines. Latest railway technology, specialised in   – Sevilla: Infrastructure improvement works. Section B: Yeles –
               construction, renewal, conservation and maintenance of rail-  Guadalmez / Remodelling of tracks at the Puertollano station;
               way infrastructures. Central pool of machinery with its own   Extension and remodelling of the high-speed railway tracks
               turn-out in Pancorbo (Burgos).                   and the passenger building at Chamartín station.

               Top products: INFRAESTRUCTURE: 1. Remodeling of tracks   MAINTENANCE OF HIGH SPEED RAILWAY SYSTEMS:
               at the Chamartín station / Extension of HS tracks and pas-  High Speed Railway Line Madrid - Sevilla: Section: Madrid
               senger building at Chamartín station. MAINTENANCE: 2.   – Adamuz; High Speed Railway Line Madrid - Barcelona -
               Maintenance of track superstructure and platform on railway   French Border: Section: Madrid – Zaragoza High Speed Rail-
               lines. TRACK: 3. Leaders in Railway Superstructure Works.   way Line Madrid - Toledo: Section: La Sagra - Toledo; High
               TRAINING, CERTIFICATION, RESEARCH: 4.  Carbon foot-  Speed Railway Line Madrid - Valladolid: Sections: Madrid
               print registry.                                  – Valladolid and Olmedo – Medina del Campo; High Speed
                                                                Railway Line Madrid – Castilla la Mancha - Levante - Mur-
               Activities in the year:                          cia: Sections: Madrid – Valencia and Gabaldón – Albacete
               Main Railway Works:                              – Alicante - Murcia; High Speed Railway Line Madrid - Gali-
                                                                cia: Section: Olmedo – Pedralba de la Pradería; High Speed
               NATIONAL:                                        Railway Line Madrid - Asturias: Section: Galicia Junction –
               HIGH SPEED RAILWAY LINES:                        La Robla – Pola de Lena.
               High Speed Railway Line Madrid – Barcelona – French Bor-
               der: Section: Trinidad Junction - Montcada (Barcelona) / Track   CONVENTIONAL LINES:
               assembly line Figueres – Perpignan; High Speed Railway Line   ADIF: Mediterranean Corridor. Section: Castellbisbal - Murcia.
               Madrid – Castilla la Mancha - Levante - Murcia: Section: Olalla   Subsections: Sant Vicenç de Calders – Tarragona – Nudo de Vila-
               – Arcas del Villar / Section: Buñol – Cheste / Section Albace-  seca and Fuente de San Luis - Almussafes / Remodelling of tracks
               te – Alpera bypass / Section: Monforte del Cid - Aspe (Alican-  and platforms at the Chamartín station (Madrid) / Remodelling of
               te) / Track assembly Section: Gabaldón - Siete Aguas / Track   tracks and catenary in the Atocha – Recoletos – Chamartín tunnel
               assembly Section: Monforte del Cid – Túnel de Callosa; High   / Track renewal. Section: Plasencia del Monte – Ayerbe / Infra-
               Speed Railway Line Madrid - Valladolid: Section: Tres Can-  structure improvement works Monforte – Orense Line. Sections:
               tos – Colmenar Viejo / Guadarrama tunnels sections 3 and 4   009+059 -019+798 and 036+524 – 046+229 / Track duplica-
               / Track assembly Section: Segovia - Fuente de la Cruz / HSRL   tion. Section: Astillero – Orejo / Algeciras – Zaragoza Railway




            Spanish Railway Yearbook 2025 Anuario del Ferrocarril                                              499
   496   497   498   499   500   501   502   503   504   505   506