- Calidad ISO 9001 Medio Ambiente ISO 14001 y Preven- workshop Fuencarral II, the largest railway workshop built by
ción de Riesgos Laborales ISO 45001. RENFE FABRICACIÓN Y MANTENIMIENTO so far.
Durante el año 2024, seguimos trabajando con estándares y
procedimientos del PMI (Project Management Institute) para Saudi Arabia
mejorar la calidad de nuestros servicios y ajustarlos a los usos - During 2024, we have continued with the maintenance of the
internacionales. Así mismo, hemos desarrollado un profundo y infrastructure and track superstructure, as well as the manage- guía de empresas
global proceso de digitalización que abarca todos los departa- ment of the line with passengers on the high-speed line bet-
mentos de la compañía. ween the cities of Mecca and Medina. It is worth mentioning
the adjustment and maintenance of both high-speed and con-
Facturación: Previsión IMATHIA Global en 2025: 85.332.564 €. ventional track equipment; periodic geometric monitoring of
N.º de empleados: 248 the track and dynamic monitoring of the track with integrated
accelerometer equipment on a commercial train at a speed of
300 km/h; as well as monitoring of the rails with ultrasound
equipment. We have also carried out annual grinding of the
track in order to achieve greater durability of the rail using a
Management Team: grinding train consisting of three units. With regard to preventi-
President: Julián García Valverde ve and corrective tasks and track maintenance inspections, the
Vice-President: Daniel García Martín company has the complete equipment of machinery, auxiliary
Managing Director: José María Carbajo Sotillo elements and specialised human resources for the complete
and autonomous development of the tasks foreseen in the
Activity: Civil Works. High Speed Track Integral Maintenance Plan.
- We follow with great attention the railway activity in the
Main products and services: region and we are present in several ongoing tenders. For
With a high specialization in the execution and maintenance example, we are candidates for the maintenance of the
of railway works, IMATHIA Construcción develops its main tracks of the freight railway connection on the North-South
activity in the execution of civil works: and East-West axes.
Railways
Roads Spain
Comprehensive Water Cycle and EnvironmentIndustrial & - In 2024, we successfully progressed with the ‘Maintenance
Singular Building Service for the Electrical Installations of ADIF-Alta Veloci-
Urban Planning dad Telecommunications Parks’ in various provinces. This
project is essential to guarantee the efficiency and safety
Top products: MAINTENANCE: 1. 1. Maintenance Works for of high-speed telecommunications infrastructures. Thanks
the Infrastructure and Superstructure of the Haramain High to our specialised team and the implementation of cutting-
Speed Line between Mecca and Medina during 12 years. edge maintenance practices, we are ensuring the continuity
TRACK: 2. 28 km of meter gauge tracks Refurbishment in the and reliability of these critical services.
Kampala – Malaba Railway Line (Uganda). - In 2024, we are in the last phase of the construction of the new
high-speed workshop Fuencarral II, the largest railway workshop
Activities during the year: built by RENFE FABRICACIÓN Y MANTENIMIENTO so far.
In 2024, we continued the maintenance of the Haramain High - The ‘Lower Iregua Outfall Project 06/10’ in La Rioja has
Speed Railway in Saudi Arabia, maintaining high quality stan- made significant progress in 2024, marking a milestone in
dards throughout our operations. the improvement of the region‘s water infrastructure. The
In addition, we completed the rehabilitation of 28 km on the initiative includes the construction of an outfall that will
Kampala to Malaba (Uganda) metric gauge railway line, inclu- connect Nalda with the Logroño treatment plant, including
ding a scope extension that included the rehabilitation of five a branch to collect discharges from Lardero. In addition,
level crossings, demonstrating our ability to manage complex storm tanks will be installed at the connection points of the
projects and deliver high quality results. discharges of the beneficiary municipalities, thus optimi-
In Spain, we have continued to be successful in the Electrical zing the management and treatment of wastewater.
Installations Maintenance Service for ADIF-Alta Velocidad‘s - In 2024 we were awarded the contract for ‘Phase 1 of the
Telecommunications Parks in several provinces and we have project to seal the Can Planas landfill site in Cerdanyola del
almost completed the construction of the new high-speed Vallès’. This action is key to prevent water seepage and gas