Page 385 - Anuario FFCC - 2025
P. 385

- Calidad ISO 9001 Medio Ambiente ISO 14001 y Preven-  workshop Fuencarral II, the largest railway workshop built by
                ción de Riesgos Laborales ISO 45001.            RENFE FABRICACIÓN Y MANTENIMIENTO so far.
               Durante el año 2024, seguimos trabajando con estándares y
               procedimientos  del  PMI  (Project  Management  Institute)  para   Saudi Arabia
               mejorar la calidad de nuestros servicios y ajustarlos a los usos   - During 2024, we have continued with the maintenance of the
               internacionales. Así mismo, hemos desarrollado un profundo y   infrastructure and track superstructure, as well as the manage-  guía de empresas
               global proceso de digitalización que abarca todos los departa-  ment of the line with passengers on the high-speed line bet-
               mentos de la compañía.                             ween the cities of Mecca and Medina. It is worth mentioning
                                                                  the adjustment and maintenance of both high-speed and con-
               Facturación: Previsión IMATHIA Global en 2025: 85.332.564 €.  ventional track equipment; periodic geometric monitoring of
               N.º de empleados: 248                              the track and dynamic monitoring of the track with integrated
                                                                  accelerometer equipment on a commercial train at a speed of
                                                                  300 km/h; as well as monitoring of the rails with ultrasound
                                                                  equipment. We have also carried out annual grinding of the
                                                                  track in order to achieve greater durability of the rail using a
               Management Team:                                   grinding train consisting of three units. With regard to preventi-
               President: Julián García Valverde                  ve and corrective tasks and track maintenance inspections, the
               Vice-President: Daniel García Martín               company has the complete equipment of machinery, auxiliary
               Managing Director: José María Carbajo Sotillo      elements and specialised human resources for the complete
                                                                  and autonomous development of the tasks foreseen in the
               Activity: Civil Works.                             High Speed Track Integral Maintenance Plan.
                                                                 - We follow with great attention the railway activity in the
               Main products and services:                        region and we are present in several ongoing tenders. For
               With a high specialization in the execution and maintenance   example, we are candidates for the maintenance of the
               of railway works, IMATHIA Construcción develops its main   tracks of the freight railway connection on the North-South
               activity in the execution of civil works:          and East-West axes.
               Railways
               Roads                                            Spain
               Comprehensive Water Cycle and EnvironmentIndustrial &   - In 2024, we successfully progressed with the ‘Maintenance
               Singular Building                                  Service for the Electrical Installations of ADIF-Alta Veloci-
               Urban Planning                                     dad Telecommunications Parks’ in various provinces. This
                                                                  project is essential to guarantee the efficiency and safety
               Top products: MAINTENANCE: 1. 1. Maintenance Works for   of high-speed telecommunications infrastructures. Thanks
               the Infrastructure and Superstructure of the Haramain High   to our specialised team and the implementation of cutting-
               Speed Line between Mecca and Medina during 12 years.   edge maintenance practices, we are ensuring the continuity
               TRACK: 2. 28 km of meter gauge tracks Refurbishment in the   and reliability of these critical services.
               Kampala – Malaba Railway Line (Uganda).           - In 2024, we are in the last phase of the construction of the new
                                                                  high-speed workshop Fuencarral II, the largest railway workshop
               Activities during the year:                        built by RENFE FABRICACIÓN Y MANTENIMIENTO so far.
               In 2024, we continued the maintenance of the Haramain High   - The ‘Lower Iregua Outfall Project 06/10’ in La Rioja has
               Speed Railway in Saudi Arabia, maintaining high quality stan-  made significant progress in 2024, marking a milestone in
               dards throughout our operations.                   the improvement of the region‘s water infrastructure. The
               In addition, we completed the rehabilitation of 28 km on the   initiative includes the construction of an outfall that will
               Kampala to Malaba (Uganda) metric gauge railway line, inclu-  connect Nalda with the Logroño treatment plant, including
               ding a scope extension that included the rehabilitation of five   a branch to collect discharges from Lardero. In addition,
               level crossings, demonstrating our ability to manage complex   storm tanks will be installed at the connection points of the
               projects and deliver high quality results.         discharges of the beneficiary municipalities, thus optimi-
               In Spain, we have continued to be successful in the Electrical   zing the management and treatment of wastewater.
               Installations Maintenance Service for ADIF-Alta Velocidad‘s   - In 2024 we were awarded the contract for ‘Phase 1 of the
               Telecommunications Parks in several provinces and we have   project to seal the Can Planas landfill site in Cerdanyola del
               almost  completed the  construction  of the  new high-speed   Vallès’. This action is key to prevent water seepage and gas




            Spanish Railway Yearbook 2025 Anuario del Ferrocarril                                              383