Page 271 - Anuario FFCC - 2025
P. 271

nes. Lot 1: Northwest.
               Alternatives study and construction project for platform access   Project Management for the extension of the Yellow Line of
               between station tracks in Catalonia and the Valencian Com-  the Porto Metro (Portugal).
               munity. Lot 3.                                   Design of the Rubi Line for the Porto Metro (Portugal).
               Projects under the Northeast Conventional Network Operati-  Design of Line 8, Phase IV of Delhi Metro (India).
               ons Subdirectorate. Subsystems: infrastructure, track, energy,   Design of Lines 3 and 7 of the Mumbai Metro (India).  guía de empresas
               signalling, and telecommunications. Lot 1: Infrastructure.  Design of Lines 1C and 1D of the Jaipur Metro (India).
               Projects under the Northeast Conventional Network Operati-  Project Management for Lines 2B, 3, and 7 of Mumbai Metro
               ons Subdirectorate. Lot 2: Track.                (India).
                                                                Project Management for the Delhi–Meerut RRTS, Phase 1 (India).
               Drafting of construction design for track installation on the   Supervision services for Line 1 of Bogotá Metro (Colombia).
               Murcia–Almería HSR line. Section: Murcia – Lorca San Diego.  Supervision of Sections 2, 3, and 4 of Line 7 of Santiago
               Drafting of construction design for track installation on the   Metro (Chile).
               Murcia–Almería HSR line. Section: Lorca – Almería.  Supervision of the extension of Line 3 of Santiago Metro (Chile).
               Drafting of basic and detailed design for a maintenance base   Supervision of Lines 4, 5, and 6 of Monterrey Metro (Mexico).
               for the Lorca–Almería section of the Murcia–Almería HSR.  Supervision of the extension of Line 1 of Santo Domingo Me-
               Drafting of construction project for track and electrification   tro (Dominican Republic).
               modification  between  Zamora–Pedralba  and  Pedralba–Ou-  Design of Lines 2 and 4 of Lima Metro (Peru).
               rense, including the Pedralba gauge changer.     Oversight (fiscalización) of Line 1 of Quito Metro (Ecuador).
               Drafting of construction design for track and electrification   Technical assistance for the construction design of the FGC
               works associated with the Sant Andreu Comtal tunnel cover   Llobregat–Anoia line extension: Plaça Espanya – Gràcia (Bar-
               in Barcelona.                                    celona).
               Drafting of construction design for implementing standard   Informative and construction design study for Line 5 extension
               gauge at Irún Station. Track and electrification.  to Terminals T1–T3 of Adolfo Suárez Madrid–Barajas Airport.
               Supervision services for the basic and detailed designs of ETS’s   Design services for the South extension of Granada Metro:
               South Railway Bypass. Basque Government.         Section Armilla – Churriana de la Vega – Las Gabias.
               Drafting of infrastructure improvement projects (bridges, tun-  Construction design of Lines 2 and 4 of Lima Metro.
               nels, earthworks). Lot 4: Southern Tunnels.      Project management, interface coordination, and technical
               Drafting of double-tracking construction design on the An-  assistance for Line 2 of Panama Metro.
               tequera–Granada  HSR.  Section:  Archidona  Junction  –  La   Technical coordination support for the Northern Section of
               Chana Junction.                                  Seville Metro Line 3 (Ramal Norte, Ramal Sur–Los Mares, Los
               Drafting of alternatives study and construction project for in-  Mares–San Lázaro, workshops, and rail systems).
               ter-track crossings at stations in Catalonia and the Valencian   Inspection, quality control, and environmental management
               Community. Lot 3.                                for rail replacement works in the Madrid Metro. Lot 1: Nort-
               Drafting of repair and improvement designs for non-structu-  hern Zone.
               ral masonry walls on conventional and metre-gauge lines.   Railway safety oversight, inspection, and quality control for
               Lot 1: Northwest.                                the superstructure works connecting Lines L3 and L12 of Ma-
               Drafting of projects under the Northeast Conventional Net-  drid Metro.
               work Operations Subdirectorate. Lot 1: Infrastructure.
               Drafting of projects under the Northeast Conventional Net-  Drafting of the project for new railway access, freight and re-
               work Operations Subdirectorate. Lot 2: Track.    ception/dispatch tracks, Nou Llobregat sector.
               Drafting of construction design for the adaptation of León   Drafting of construction project to increase capacity in Phases
               Classification Yard – San Andrés del Rabanedo to the León–  I & II for the Port Authority of Barcelona.
               Pola de Lena HSR.                                Assistance in drafting the Informative Study for the Villamalla
               Preliminary studies for a direct freight corridor between Pau–  Railway Terminal development.
               Canfranc international route and the Mediterranean Corridor.  Technical assistance for the basic and construction design
               Design for track renewal in the branch line to Ferrol Port, in-  of the new Tarragona Tramway (FGC): Tranche I – Cambrils
               cluding third rail implementation.               Centre to Vila-seca Estació, Tranche II – Cambrils North spur.
               Construction design for infrastructure, track, and electrificati-  Technical assistance for the construction design to improve
               on renewal. Section: Villa del Río – Palma del Río. Lot 1: Villa   accessibility and regulatory compliance at Verdaguer Inter-
               del Río – Córdoba Freight Junction.              change (Lines 4 & 5, FMB).




            Spanish Railway Yearbook 2025 Anuario del Ferrocarril                                              269
   266   267   268   269   270   271   272   273   274   275   276