Page 266 - Anuario FFCC - 2025
P. 266

company guide  Independent Safety Assessments (ISA) for infrastructure, en-  ment); Achilles (Link up) (UK for safety, telecommunications,

                                                                   and electrification systems).
                 ergy, signalling, and rolling stock subsystems. RAMS studies,
                                                                   No. of employees: 420
                 Life Cycle Cost studies,
                                                                   Share capital: 60,121 Euros
                                                                   R&D Investment: 700,000 Euros
                 Comprehensive  Electrification,  Operation  and  Maintenance
                 Simulations.
                                                                   Sales: 35,2 million Euros
                 Top products: TRAINING, CERTIFICATION, RESEARCH: In-
                 dependent Safety Assessor: ISA accreditation in Control, Com-
                 mand and Signalling, Rolling Stock, Energy, and Infrastructure.

                 Activities in the year:
                  - Design services for the integration of systems and infra-
                   structures in the different phases of the extension works
                   of the Llobregat – Anoia line of FGC in Barcelona. Plaza
                   España – Gracia.
                  - Design and supervision of the executive project for Kau-
                   nas Station.                                                    AYESA
                  - Supervision of construction works for the modernization
                   and transformation of the passenger building at Barcelo-   Marie Curie, 2 PCT Cartuja
                   na Sants Station.                                           E-41092 Sevilla. España
                  - Control  and  monitoring  of  the  construction  project  for   Tel.: +34 95 446 70 46
                   the installation of automatic block signalling on the Gua-    ayesa@ayesa.com
                   dalajara – Ariza section.                                      www.ayesa.com
                  - Supervisión & Review of the Electrification Design for the
                   High-Speed Line between Mumbai and Ahmedabad (India).  Equipo directivo:
                  - Consultancy services for the comprehensive mainte-  CEO: José Luis Manzanares Abásolo.
                   nance of High-Voltage lines for ADIF and ADIF-AV.  Chief Operations Officer: Rosalío Alonso.
                  - Technical support services for the execution of enginee-  Chief Markets Officer Engineering: Marisa Chabaneix.
                   ring projects and works associated with improvement   Chief Service Officer Engineering: Luis Garrido.
                   plans for the Madrid Metro network.
                  - Feasibility study and Preliminary Design of the Railway   Actividad: Ingeniería y Consultoría, Otros.
                   Line between Jinji and Kampala in Uganda.
                  - Advisory services to the EBRD for the supervision of the   Principales productos y servicios:
                   execution of railway infrastructure projects in the Rail-  Estudios y diseños (planes de transporte, estudios de viabili-
                   way Corridor VIII - Phase I Project in North Macedonia.  dad, diseños preliminares y detallados).
                  - Consultancy services for the geolocation of cable cars   Consultoría de construcción y PMO.
                   in  the  Khyber  Pakhtunkhwa  region,  analysis of the in-  Pruebas y puesta en marcha.
                   frastructure condition, and recommendations to enhance   Operación y mantenimiento de infraestructuras metropolitanas.
                   operational safety (Pakistan).                  Ingeniería 4.0.

                 Geographic areas where products and services are marketed:  Productos estrella: INGENIERÍA Y CONSULTORÍA: 1. AT
                 Ardanuy operates on five continents and has undertaken pro-  para la Ampliación de la L5 del Metro de Madrid. Prolon-
                 jects in over 70 countries. Additionally, it has permanent of-  gación a la T1-T2-T3 del Aeropuerto Adolfo Suárez – Ma-
                 fices in Spain, India, Colombia, Panama, Peru, and Lithuania.  drid Barajas. 2. Elaboración de Projecto Preliminar de las
                                                                   líneas ISMAI – Paradela y Roberto Frias – Aeroporto (Lote
                 Certifications:                                   01) y Dragão - Souto y IPO - Estádio do Mar (Lote 2) para
                 Certification / Accreditation: ISO 9001 (Quality), ISO 14001   Metro Oporto.
                 (Environmental Management), ISO 45001 (Occupational
                 Health and Safety), ISO 17020 (Independent Safety Assess-




       264                                                     Anuario del Ferrocarril 2025 Spanish Railway Yearbook
   261   262   263   264   265   266   267   268   269   270   271