Page 270 - Anuario FFCC - 2025
P. 270
company guide Certificaciones: and upgrade works on the infrastructure of the Madrid–Seville
Calidad y Medio Ambiente:
HSR line.
Consulting and technical assistance for the overhead con-
- Gestión de la Calidad, conforme a la ISO 9001
tact line (OCL) and track installation projects at La Sagrera
- Gestión Ambiental, conforme a la ISO 14001
HSR Station.
- Gases de Efecto Invernadero, conforme a la ISO 14064-1
Technical assistance for the supervision of track renewal
works on the Ciudad Real–Badajoz line. Section: Brazatortas–
Facturación: 790 millones de euros
Guadalmez.
Nº de empleados: 13.000
Consulting services for the supervision of the southern railway
access platform works to the Port of Castellón. Section I (KP
0+000 – KP 4+698).
Technical assistance for comprehensive infrastructure and
Management team: track renewal works. Section: KP 96+430 – Calañas, Zafra–
CEO: José Luis Manzanares Abásolo. Chief Operations Of- Huelva line.
ficer: Rosalío Alonso. Chief Markets Officer Engineering: Mari- Consulting and assistance for the construction of the Palen-
sa Chabaneix. Chief Service Officer Engineering: Luis Garrido. cia–Aguilar de Campoo HSR platform. Section: Calahorra de
Boedo – Alar del Rey.
Activity: Engineering and Consulting, Other. Consulting and assistance services for the extension of plat-
forms and two new tracks at Puerta de Atocha station and Ato-
Main products and services: cha Cercanías – including systems adaptations for new tracks
Studies and designs (transport plans, feasibility studies, con- 16 and 17.
cept, preliminary and detailed designs) Consulting and technical services for gauge clearance impro-
Project management and Construction supervision. vement works on tunnels and overpasses along Line 610 –
Testing and commissioning Teruel–Sagunto Junction. Sections: Sagunto–Teruel–Zaragoza.
Operating and maintenance of underground rail infrastructures Project management support for the construction of the Agi-
Digital Engineering naga Tunnel.
General consultancy services for the Delhi–Meerut RRTS
Top products: ENGINEERING AND CONSULTING: 1. Tech- high-speed rail in India.
nical Assistance for the Extension of Madrid Metro Line 5 to Construction project for the double-tracking of the Antequera–
Terminals T1–T2–T3 of Adolfo Suárez Madrid–Barajas Air- Granada HSR. Section: Archidona Junction – La Chana Junction.
port. 2. Preliminary Design for the Porto Metro Lines: ISMAI Construction project for track and electrification associated
– Paradela and Roberto Frias – Airport (Lot 01), and Dragão with the commuter rail tunnel cover in Sant Andreu Comtal,
– Souto and IPO – Estádio do Mar (Lot 2). Barcelona.
Construction project for track installation on the Murcia–Al-
Activities in the year: mería HSR line. Section: Murcia – Lorca San Diego.
Design of the electrification of the Estonian railway network. Construction project for track and electrification works con-
Project Management for the Dhaka–Tongi railway line, Tongi– necting the Zamora–Pedralba and Pedralba–Ourense sections
Joydebpur section in Bangladesh. and the eastern Pedralba gauge changer.
Construction supervision of Line 86 in the Czernica Construction project for track installation on the Murcia–Al-
Wrocławska – Wrocław Główny section for CPK (Central mería HSR line. Section: Lorca – Almería.
Communication Hub - Poland). Basic and detailed design for a maintenance base for the Lor-
Comprehensive supervision (interventoría) of the Regiotram ca–Almería section of the Murcia–Almería HSR.
del Occidente in Colombia. Construction design for adapting the León classification yard
Sections 1 (supervision), 2 (design), 5 North, 6 and 7 (supervi- – San Andrés del Rabanedo section to the new León–Pola de
sion) of the Tren Maya project in Mexico. Lena HSR configuration.
Technical assistance for the supervision and monitoring of Construction project for implementing standard gauge at Irún
construction works on the Vitoria–Bilbao–San Sebastián high- Station – including track and electrification.
speed rail line. Section: Mondragón–Elorrio–Bergara, Sector 1. Infrastructure improvement projects (bridges, tunnels,
Technical assistance services for the supervision of the railway earthworks). Lot 4: Southern Tunnels.
access project to Sagunto Port. Structural and/or maintenance repairs of non-load-bearing
Technical assistance services for the supervision of renovation masonry walls on conventional and metre-gauge railway li-
268 Anuario del Ferrocarril 2025 Spanish Railway Yearbook