company guide  systems in several lines (4, 5 and 10) of the Madrid Metro;   Conventional lines of La Encina - Xàtiva- Valencia, and

                                                                   the Technical Assistance for the works of new frequen-
                 Mounting of track in plate and electrification in the new
                                                                   cies of the ASFA Digital and the inspection of 2,000 Level
                 connection between the Atocha and Chamartin stations.
                                                                   Crossings for ADIF. In 2022, the electrification projects
                 Signaling systems and train protection ERTMS, CTC and
                                                                   in the comprehensive renovation of the  Padrún tunnels
                 auxiliary detection systems in the Madrid-Levante High
                 Speed    Line (sections: Torrejón-Motilla, Motilla-Albacete
                                                                   and Villabona tunnels on the LEÓN-GIJÓN line; the Parla
                                                                   station halt project; of the construction project of the SAN-
                 and Motilla-Valencia),  Olmedo-Zamora-Galicia High
                                                                   TANDER IISS; Technical assistance for the Silla-Cullera-
                 Speed   Line ( section: Ourense-Santiago), Zaragoza-Hues-
                 ca High Speed    Line;  High Speed    Line Valladolid-León
                 and Valladolid-Burgos (VALEBU) for ADIF; Works for the
                                                                   B.A.B. in FIGUERES-PORTBOU; electrical substations and
                 Platform Screen Doors installation in the Madrid Metro;
                                                                   electrification for the eastern VALLADOLID railway vari-
                                                                   ant; of the inspection and support in the management of
                 Substitution of the catenary of line 2 of Metro de Madrid;   Gandía line;  Montcada bifurcation interlocking; of the
                 Track assembly work in the extension of Line 1 towards   the exploitation of the Metropolitan of Granada.
                 the Ensanche de Vallecas. Works for the implantation   The most relevant technical assistance and construction pro-
                 of  electronic interlocking in the  Deposit of Canillejas   jects in 2023 were those of the railway security and telecom-
                 de Metro de Madrid; Implementation and start-up of the   munications facilities for access to the new Barcelona airport
                 concessions of the light rail lines ML 1, ML 2 and ML 3   terminal, the security facilities resulting from the electrificati-
                 of the Community of Madrid for MINTRA; Modifications   on of the Ronda-Algeciras line, the elimination of telephone
                 in Substations of the Madrid Metro; Signaling Supervisi-  blocking between Villanueva de la Serena – Brazatortas, the
                 on in several Metro Lines of Madrid. Implementation of   development and implementation of a unified control center
                 rail-ground protection implementation in 18 traction cen-  for ERTMS (CCUE) and the adaptation of existing facilities and
                 ters of the Madrid Metro. Implementation of the signaling   equipment on the high-speed lines in the Northwest area .
                 CBTC system and ITCS control center in the La Loma-  The Level Crossing projects in various stations and routes for
                 Ciénaga Line and in the Rolling Stock of FENOCO (Co-  ENYSE, ICF and THALES, the low cost ERTMS and the Cala-
                 lombia); Implementation of the ERTMS N1 system in the   tayud BAB for Alstom. At the beginning of 2025, it contracted
                 Sarmiento Line of Buenos Aires (Argentina). For the tender   with EUSKAL TRENBIDE SAREA-RED FERROVIARIA VASCA
                 for the concession of the Móstoles - Navalcarnero line for   (ETS) in a joint venture with SAITEC for the “Technical support
                 OHL; For the tender of the Lima urban train concession   service for the implementation of the ERTMS system in ETS.
                 for OHL; Of the systems of signaling and protection of the   Usurbil - Hendaye section.“
                 train ERTMS of High Speed   Line Zaragoza-Huesca (sec-
                 tion: Tardienta-Huesca) for ADIF; Of the systems of signa-  RAM and Safety Consulting: RAMS Supervision on Lines
                 ling and protection of the train ERTMS, CTC and auxiliary   1 and 6 of the Madrid Metro; RAMS supervision on Line
                 detection systems in the Madrid-Levante High-Speed   Line   7b (Metroeste) of the Madrid Metro; RAMS Supervision in
                 (sections: Torrejón-Motilla, Motilla-Albacete and Motilla-  the Hortaleza Deposit (Madrid); Supervision of the project
                 Valencia). Of the signaling and protection systems of the   of the First Line of the Bogotá Metro PLMB (Colombia);
                 ERTMS, CTC and auxiliary detection systems in the Ol-  Supervision of the Marmaray project (Turkey); Inspection
                 medo-Zamora-Galicia High Speed Line (section: Ourense-  of the signaling facilities of Line 5 of the Madrid Metro;
                 Santiago) for ADIF; Of the signaling systems of the Grana-  Safety analysis of Platform Screen Doors for Metro de Ma-
                 da Tram. Evaluation of proposals to contests of the SCT   drid; Management of the Acceptance of Functionality and
                 Mexicana. Inspection of Quito Metro Facilities (Ecuador).   Safety (RAMS) of Interlockings for Metro de Madrid; Pro-
                 Project for the installation of a “distance to go” signaling   specting and feasibility study of the integral automation
                 system (DTG) on Line 5 of the Madrid Metro for Siemens.   of a current Metro de Madrid line; Improvement of safety
                 Inspections of the Level Crossings and of the Crossings   in the works of railway signaling installations; For the IP
                 between platforms for passengers in stations for the AESF.   / MPLS network of EFE (Chile). RAMS study for the Inter-
                 Drafting of signaling and communications projects for the   urban train from Toluca to Mexico D.F. (Mexico). Expert
                 Asunción-Guardo and Ferrol - Ortigueira railway lines for   opinion of the unfortunate ANGROIS accident for ADIF.
                 ADIF. Drafting of construction projects for signaling and   Drafting of the Safety Dossiers of the stations of Torrela-
                 communications for the Asunción-Guardo railway lines;   vega to Santander for the UTE of construction. In 2020,
                 Ferrol - Ortigueira; Torrelavega Santander; Xativa-Alcoy;   2021 and 2022 Assistance in terms of technical advice
                 suppression  of 10  crossings between  platforms; all for   on railway safety to the Department of Territorial Policy,
                 ADIF. The Technical Assistance of the High Speed and   Public Works and Mobility of the Generalitat Valencia-




       246                                                     Anuario del Ferrocarril 2025 Spanish Railway Yearbook
   243   244   245   246   247   248   249   250   251   252   253