company guide - Hardware and software evolution of the Metro Bilbao an electronic interlocking at Caldes de Malavella with
Central Command Post to manage obsolescence.
Centralised Traffic Control (ctc) and Automatic Banalised
Blocking with its collateral stations. Barcelona to Portbou
line.
Euskal Trenbide Sarea/Basque Railway Network (ETS/
- Work on the construction project for the renovation
RFV)
of video surveillance, access control and anti-intrusion
equipment on the Madrid - Lérida -Barcelona section.
- Construction works of a new interlocking in Muxika
- Renovation works for the Madrid-Lerida-Barcelona and
Government of Cantabria
- Awarding of the contract for the drafting of the
- Control, information management and clearing centre
construction project and execution of the works to modify
and security platform of the unified integrated payment Zaragoza-Huesca PDH access network.
the conditions for opening consecutive exit signals on
system for transport in Cantabria. a several THALES technology interlockings in the northern
operations sub-directorate.
National Network of Spanish Railways RENFE - Commissioning of more than 300 audio-frequency track
circuits using Thales technology (TTC) on the Madrid-
- Maintenance of safety installations and motorisation of Seville high-speed line.
turnouts in BMSs and BMIs of RENFE Manufacturing and - Commissioning of the change of parity at the Llinars,
Maintenance Cardedeu, Sant Celoni and Riells i Viabrea-Breda
interlockings.
Spanish Ports - New Cártama interlocking brought into service.
- Moreda interlocking modification.
- Development of new functionalities of the safety - Commissioning Modification of CTCs Cordoba & Seville
installations of the railway terminals located inside the and interlockings at Peñaflor and Almendralejo.
port of Huelva. - Commissioning of ERTMS N1 technology on the Seville-
- Automation and monitoring of the Port of Marín, in Cádiz line.
Pontevedra. - Bringing into service of the side signalling of the new
Granada interlocking and the new Albolote interlocking.
Turkey
Bizkaia Transport Consortium
- 3-year maintenance contract for the signalling,
communication, GSM-R and CTC control centre systems - Actions and improvements in the SAGB and in the OAC
on the high-speed line between Sincan and Kosekoy, system for the implementation of Barik Mobile in bulk and
section of the Ankara-Istanbul high-speed line. optimisation of data exploitation.
- Supply and support services of track circuits for Isparta- - Maintenance, evolution and updating of the Barik Card
Burdur-Denizli line. Administration and Management System.
- Supply, design and support for installation, testing and - Hardware and software evolution of the Centralised
commissioning of TTC track circuits on the Çerkezköy- Control Centre of Metro de Bilbao to manage
Kapıkule section. obsolescence.
COMMISSIONED IN RELEVANT PROJECTS Euskal Trenbide Sarea/Basque Railway Network (ETS/
RFV)
Administrador de Infraestructuras Ferroviarias ADIF
(Spanish Railway Infrastructure Administrator) - Construction of a new interlocking in Muxika.
- Updating of operation modules (OM) in the interlockings
- Technical change of the ERTMS system on the Chamartín- of the Amorebieta-Lebario section.
Torrejón de Velasco line.
- Execution of construction works for the suppression of
telephone blocking on the Ferrol - Ortigueira section (Line
740).
- Execution of works on the project for the installation of
478 Anuario del Ferrocarril 2023 Spanish Railway Yearbook