Page 469 - Anuario FFCC - 2023
P. 469

Activity:                                        span one of the largest in the world – the bridge also holds
                 Construction of all kinds of civil works, buildings and   multiple records) / Madrid-Galicia HST line. Section:
                 special works. High specialization in construction and   Silleda-Vedra-Boqueixón. Infrastructure works including
                 maintenance of railway infrastructure and superstructure   the Ulla viaduct a lightly pointed arch, 168 m. of span and
                 for HST lines, conventional lines, tram and metro systems.  105 m. of rise; Project design and track-laying. Section:
                                                                  Olmedo-Pedralba de la Pradería.                guía de empresas
                 Main products and services:
                 RAILWAYS: High technology for railways specialising in   HST-TRACK MAINTENANCE: Madrid-Asturias HST line.
                 renovation, construction and maintenance of new and   Maintenance of track, switches and crossings. Section:
                 existing railway lines (both HST and conventional), as   Galicia connection – La Robla - Pola de Lena. Madrid–
                 well as metro and tram lines.                    Seville  HST  line.  Maintenance  of  infrastructure,  track
                                                                  switches and crossings. Operating bases Mora y Calatrava
                 CONSTRUCTION: high ways, roads, hydraulic works,   (2020 -2024); Madrid – Levante HST line. Maintenance
                 urban developments, environmental actions, buildings.  and pre-maintenance service of the infrastructure, track,
                                                                  switches and crossings. Operating bases  Villarubia de
                 Top products: TRAINING, CERTIFICATION, RESEARCH:   Santiago and Gabaldon.  Madrid-Galicia HST Line.
                 1. Structures and infrastructure monitoring through IoT   Section: Olmedo–Pedralba de la Pradería (25 years).
                 sensors. INFRAESTRUCTURE: 2.  Tunnel  Enlargement
                 System (TES).  TRACK: 3.  Automatic  system  for  the   CONVENTIONAL LINES:  ADIF. Railway actions:  New
                 selective correction of rail corrugation. 4. Machine for   rail access to the Port of Seville. Castellón Station. New
                 positioning  and  Squaring  Railway  Sleepers.  Squaring   parking base for high-speed trains in Sant Andreu Comtal;
                 machine.                                         Remodelling of the Madrid-Vicálvaro freight terminal.
                                                                  Phase 1, Sub phase 1B; Replacement of current concrete
                 Activities in the year:                          track for a new railway track on ballast in Orcasitas
                 INFRASTRUCTURE  AND SUPERSTRUCTURE FOR           Station (C-5 Cercanias Madrid Commuter rail network);
                 HST LINES.  Projects for the construction of  the new   Improvement works on the railway track. R16 Line
                 access channel for the integration of High Speed   in the   (Rodalies de Catalunya´s commuter rail service). Section:
                 city  of Valencia, the expansion and remodeling of the   Tortosa-L´Aldea /  Conventional lines Maintenance
                 Valencia Station - Joaquín Sorolla and the expansion of   (Infrastructure  and  tracks)  ADIF  (MIV):  MIV 2021
                 the  Valencia - Joaquín Sorolla car park;  Sevilla-Cádiz   LOT 1 Northwest / LOT 2 North  Metric-Gauge  lines:
                 HST line. Platform and track, Section: Airport of Jerez de   Infrastructure and track maintenance Adif network path.
                 la Frontera Station-Cádiz. Duplication of railway tracks.   LOT 7 Metric Gauge Railway Network.
                 Railway spur to Bajo de la Cabezuela dock;  Madrid-
                 Sevilla HST line Renewal of sleepers on Madrid-Sevilla   Renfe Operations (Spanish National Railway Network):
                 HST line.; Madrid–Zaragoza–Barcelona– French Border   Extension of train-maintenance workshops at Montcada.
                 HST Line.  New Sant  Andreu Station for Catalonia
                 commuter trains network. Tracks and overhead contact   STATE PORTS (PUERTOS DEL ESTADO).  For Valencia
                 system works;  Vitoria–Bilbao–San Sebastián HST line.   Port Authority:  Remodeling of the Príncipe Felipe Pier
                 Platform. Section: Atxondo – Abadiño / Platform. Section:   Railway Terminal; Improvement of the layout of the rail
                 Mondragon-Elorrio-Bergara. Sector II. / Platform and track,   and road network,  including a new classification  yard,
                 Section:  Astigarraga-Irun. Implementation of the UIC   between the Poniente Pier and the Costa del Puerto Pier.
                 track width; Mediterranean Corridor Platform and tracks
                 works for implementation of standard width. a) Section:   OTHER RAILWAY  AUTHORITIES. For ETS:  Tramway
                 Silla – Cullera, b) Castellbisbal-Martorell, c) Castellón   expansion  Vitoria-Gazteiz to Salburu, second phase.
                 Station; Special works: A High Speed Line connecting the   Civil works. / New Station in Zarautz (Basque Country) /
                 stations of Atocha and Chamartin. (Madrid). Construction   Maltzaga Station track renovation and new auxiliary track.
                 of a new tunnel by using a TBM and an UIC track width /   / New emergency exits. Section: Bergara-Astigarraga /
                 Atlantic Axis high-speed rail linea. Section: Ulla Viaduct.   Additional platform works for the New Railway Network
                 (The bridge is a composite featuring a steel truss built on   in the Basque Country. Section: Bergara-Astigarraga /
                 a concrete deck. It is composed of 3 main spans of 225   Infrastructure maintenance and track  Tramcar  Vitoria
                 meters, 240 meters and 225 meters, making the principal   / Infrastructure maintenance and track  Tramcar




            Spanish Railway Yearbook  2023 Anuario del Ferrocarril                                             467
   464   465   466   467   468   469   470   471   472   473   474