Page 449 - Anuario FFCC - 2023
P. 449

- Basic and executive design of the Itaquera II bus corridor   - Nierbimo: Project developed in the framework of the HAZITEK
               (Brazil)                                          program, aimed at developing digital twins of railway stations
               - Construction project for the energy and communications   and depots to optimize their operation and maintenance
               systems of line 9 of the Barcelona subway (Spain).  and contribute to their transformation into near-zero energy
               - Construction project for the renovation of the  ATP-ATO   consumption buildings (NZEB).
               signaling system on line 4 of the Barcelona subway.
               - Construction management of the migration of the transport   Geographic  areas  where  your  products  and  services  are  guía de empresas
               network of line 9 of the Barcelona subway to IP MPLS.  marketed:
               - Works management for the upgrading of the command and   Countries  in the  EU,  UK, Middle  East  -with a  presence  in
               control technology of the Barcelona subway.       countries such as Saudi  Arabia, the United  Arab Emirates,
               - Integral project and works management for the implementation   Qatar and Oman-, Australia, Brazil, Canada, Colombia, Chile,
               of new electric bus charging facilities in Barcelona.  Ecuador, Egypt, the United States, Israel, Mexico, Panama,
               - Construction project for the extension of line 12 of the   Peru, the Philippines, Tanzania and Uruguay.
               Metrovalencia tramway.
               - Construction project for the northern extension of the Granada   Certifications:
               subway.                                           Quality and Environment: ISO 9001 – ISO 14001 – OHSAS
               - Tender design for the extension to Cais do Sodré of the yellow   18001.
               and green lines of the Lisbon subway (Portugal)   Innovation: AENOR certificate in R&D&I in accordance with
               - Detailed design and RAMS/EMC/E&E analysis of the extension   UNE standard 166002:2006.
               of the Edinburgh tramway, York Place - Newhaven section   Building Information Modeling (BIM): UNE-EN ISO 19650.
               (Scotland).                                       Railway Safety Inspections (ISA): UNE-EN ISO/IEC 17020:2012
               - Tender design for Cluj-Napoca subway (Romania)
               - Tender design for the Jerusalem Light Rail Blue Line (Israel)  No. of employees: 2,700
               - Tender design for Haifa-Nazareth light rail (Israel)
               - Lender technical advisor services for Jerusalem light rail
               project (Israel)
               - Detailed design of the New Capital and 6th October lines of
               the Cairo Monorail (Egypt)
               - Independent review engineering (ICE) services for Riyadh
               Metro Package 3 (Lines 4, 5 and 6) (Saudi Arabia)
               - Independent review engineering (ICE) services for phases 2C2
               and 2C3 of Lusail light rail (Qatar)
               - Tender design for Alexandria to Abu Qir metro (Egypt)
               - Tender design for the  Western Sydney  Airport line of the   SIDERÚRGICA REQUENA,
               Sydney Metro - SSTOM (Australia)
                                                                                 S.A.U.
               Innovations:
               Sener is a very involved player in the innovation ecosystem,     Domicilio Social:
               having more than 80 patent families, of which more than        Eduardo Barreiros, 116
               40 remain in force through  almost 200 patents in different   E-28041 Madrid. España
               countries around the world.                                    Tel.: + 34 91 702 72 52
                                                                              Fax: + 34 91 702 72 53
               Among the main innovation projects in which Sener is       rrequena@siderurgicarequena.com
               currently working in relation to railroads, the following can be   central@siderurgicarequena.com
               highlighted:
                                                                 Equipo directivo: Director: Ignacio Domecq Benjumea. Jefe
               - Hydrogen technology for use in rail mobility.   de Taller: Alejandro González Fernández. Administración
               - Hyperloop: Participation in the  Technical Committee for   y Control: María Luisa Martín Sáez. Ingeniería de Calidad:
               Standardization CTN 326 of AENOR.                 Fernando García Guerrero. Ingeniería de Proyectos: David
               - Assests4Rail: Project developed within the framework of the   Israel Morcuende García.
               Shift2Rail program focused on the exploration, adaptation,
               and testing of innovative technologies for the monitoring and
               maintenance of railway assets.



            Spanish Railway Yearbook  2023 Anuario del Ferrocarril                                             447
   444   445   446   447   448   449   450   451   452   453   454