company guide  corridor. Erection of the overhead contact line (catenary)   Maintenance:

                    between Plasencia and Peñas Blancas (125 km).
                                                                     - Preventive and corrective maintenance and auxiliary
                                                                     works of the different electrification facilities of the
                    - New traction power substation of Taradell (Barcelona).
                                                                     conventional network in the eastern area of Spain:
                    Supply, installation and commissioning of the electrical
                                                                     overhead contact line, traction substations and high
                    equipment for two high voltage connections (25 kV) as
                    well as the transformer, rectifiers, feeders and power
                                                                     voltage power supply lines to traction substations.
                                                                     -  Albacete-Alicante signaling maintenance. Several
                    supply systems to the catenary and safety installations.
                                                                     maintenance works in a line with 160km of double lane.
                    - Construction of traction power substations for the Pajares
                    bypass: 20kV Transmission line, GIS 400kV substation, 32
                    transformation centers and 2 20kV autotransformation
                                                                     power lines in conventional network to comply with Adif
                    centers, including telecontrol and maintenance.
                                                                     regulations in the Northeast, South, Center and North
                                                                     areas.
                    - Construction and maintenance of Pola de Lena mobile   - Adaptation of traction substations and their high voltage
                    substation: installation of facilities for mobile substation,   - Maintenance of Albacete-Alicante signalling. Actions on
                    6 feeder outputs 3kVcc, 1 rectifier group 3.3kA and   a double-rail line with two maintenance bases located in
                    associated auxiliary systems.                    Monforte and Bonete.
                    - Commissioning of the  Tomeza electrical substation   - Maintenance service for the contact line, auto-
                    (Pontevedra). Supply of equipment to the existing   transformer and remote control energy installations,
                    installation for its conversion into a traction substation   including the installations associated with the high-speed
                    that will feed the A Coruña-Vigo Atlantic axis.  section between Chamartín and Torrejón de Velasco.
                    - Supply and installation of batteries in the ADIF’s High
                    Speed Network (2020 renewal plan).               Geographic areas where your products and services are
                    - Construction of 400kV Transmission line in Totana.   marketed: Main European and American countries.
                    - Pre-construction engineering for the Las  Vegas-Los
                    Angeles High Speed Rail project.                 Certifications:
                                                                     Quality, Environmental Management and RDI: As proof of
                    Metro and Tram:                                  our commitment to the HSE and QA/QC policies Lantania
                    - Works on the technical branch of the northern section of   obtained the ISO 9001, ISO 14001 and ISO 45001:2018
                    line 3 of the Seville Metro.                     certifications, in the areas of quality, environment and
                    -  Construction  of  the energy and  telecommunications   Health & Safety granted by Aenor. In addition, we have
                    facilities for line 9 of the Barcelona subway, as well as two   recently obtained the ISO 50001:2018 certification of our
                    GIS 400kV substations and 20 traction substations.  energy management system.
                    - Renovation works on Line 1 of Metrovalencia.
                    Replacement of the existing turnouts with their drives and   Income:  301 million Euro.*
                    modification of interlockings and centralised traffic control   Ebitda: 12.2 million Euro.*
                    systems (CTC). Track renewal will also be carried out on   No. of employees: 1,008.
                    several branches and level crossings will be renovated.   (*) Note: Provisional figures for 2022 pending
                    Replacement of 45 turnouts, the supply and installation of   confirmation at the closing of the annual accounts audit.
                    14,374 prestressed concrete monoblock sleepers and the
                    supply and installation of 24,932 m3 of ballast.
                    - Modernisation of the tramway track, street reconstruction
                    and water and infrastructure services on the section Pl.
                    Bp. Snore to Ul. Podgórna in Torun (Poland).
                    -Reconstruction of the Lodz tramway line. Legionow
                    Street. Sections I, II and III. Lodz (Poland).
                    - Balzola builds a 1.3 km double tramway line with three
                    stations along its route on Gagarina Street in the city of
                    Warsaw (Poland).
                    - Balzola carries out track modernisation on the section
                    between Chrapka Street and UI in Podgone (Poland).