CMMS, local and cloud SCADA, railway engineering calcula- Northern area.
tion tools, traveler information systems. * Execution of the construction project for the Rincón de Soto
Tailored solutions based on LiDAR technology: geometric variant of the Castejón – Logroño (La Rioja) line.
gauge/ clearance control solutions, positioning solutions in * Maintenance service for 25 kV AC traction energy facilities
complex environments, point cloud-based solutions for obtai- on the Madrid - Asturias high-speed line: overhead contact
ning digital twins in linear civilian infrastructures. line, substations, autotransformation centers, 20 kV line, trans- guía de empresas
SICK preferred allies in the rail sector for integration of formation centers, and energy telecontrol in the Bif. Pajares
LiDAR devices. - Pola de Lena section.
* Works for the construction project to renovate signalling on
Top products: INFRAESTRUCTURE: 1. tCat . 2. tElphe. the Madrid – North Area commuter train network.
®
MAINTENANCE: 3. Telice dyntact . 4. Telice Lizard. * Works execution for the construction project for the safety
®
and telecommunications installations of the Sama de Langreo
Activities in 2024: underground routing of Laviana-Gijón San Sanz Crespo line,
* Drafting of the construction project and execution of the Laviana-Tuilla section, ADIF‘s metric gauge network.
works to adapt the safety installations affected by the electri- * Works on the construction project for the eastern traction
fication of the Vigo Guixar – Redondela section of L812. L812 substation of the Valladolid railway bypass and rehabilitation
Vigo Guixar - Chapela bifurcation, L810 Monforte de Lemos of the Pinar de Antequera and Cabezón de Pisuerga traction
- Redondela, and L824 Redondela - Arcade bifurcation. substations.
* Preventive and corrective maintenance and auxiliary works * Works for the construction project of new interlockings in
for electrification installations (overhead contact line and trac- Veriña and Serín railway stations.
tion substations). Lot 2 Northwest. * Construction project for tunnel lighting refurbishment in
* Maintenance services for traction energy installations: over- Madrid-Sevilla High Speed Line.
head contact line, energy remote control, substations, auto- * Rigid Catenary Electrification of Lima suburban, Line 2 (Peru).
transformation centers, and associated systems of the LAV * Preventive and corrective maintenance assistance and
North, Madrid-Valladolid-León and Burgos sections. ancillary works for electrification facilities (overhead con-
* Execution of the works for the construction project of the tact line, traction substations and high voltage power lines).
duplication of the North - Northwest High-Speed Corridor, ADIF-lot 2 (Northwest).
section Palencia - Vilecha bifurcation (High-Speed) and the *Maintenance support services for cable network and tele-
construction project for the electrification of the line Palencia communications systems. ADIF-lot 1 (Northwest).
- León, overhead contact line, new duplication sections. * Maintenance support services for telecommunications cable
*Execution of the works for the construction project of the and systems network. ADIF-lot 2 (North).
Cariñena and Villafranca substations of the traction electri- * Execution of the construction project for the power remote
cal, auto-transformation centers, and high-voltage overhead control of the Plasencia-Badajoz section of the Madrid-Extre-
line for the Zaragoza - Teruel section of the Cantabrian-Me- madura high-speed railway line.
diterranean Corridor. * Power supply to mobile telephony operator infrastructures
* Execution of the works for the construction project of three (BTO) from 750 V-Line II in the Madrid-Lérida section of the
intermediate auto-transformation centers, adaptation of the Madrid-Barcelona-Figueras high-speed line.
electrical areas of the Luengos, Becerril, and Dueñas substati- *Integral management of the safety and security systems
ons, and the energy remote control associated with the track in the tunnels of the Madrid – Barcelona – French border
doubling in the Palencia-León section. High Speed Line.
* Constructive project for the standardization and moderniza- * Maintenance of Security and Communication network of Tun-
tion of block systems and new interlockings on the Cabezón nels in ADIF’s Conventional Railway network. Northwest Lot.
de la Sal - Torrelavega section. * OCL maintenance in the Madrid-Castilla la Mancha-Valen-
* Execution of works for the removal of telephone blockage cia-Murcia high speed line.
between Aranda de Duero and Bif. Aranda.
* Execution of works for the provision of BAB on the Torre- Innovations in 2024:
lavega - Santander - Nueva Montaña and Maliaño - Astil- * Development of a next generation track-side dynamic pan-
lero sections. tograph sensor.
* Execution of infrastructure communication renewal works in * Development of a distributed-integrated command system
the Northwest area. for high speed lines traction substations and collateral in-
* Infrastructure communication renewal works in the stallations.