tion of rail corrugation. TRACK: 4. Machine for positioning re, track, switches and crossings. Operating bases Villarrubia
and Squaring Railway Sleepers. Squaring machine. de Santiago and Gabaldon (2025-2029). Madrid-Galicia HST
Line. Section: Olmedo–Pedralba de la Pradería (25 years)
Activities in the year:
INFRASTRUCTURE AND SUPERSTRUCTURE FOR HST LINES. CONVENTIONAL LINES: ADIF. Railway actions: Track rene-
New Railway Complex of Atocha Station (Madrid). Construc- wal, specific actions in Infrastructure and adaptation of the guía de empresas
tion Project of Phase 2. Pasante Station Projects for the con- gauge of overpasses of the Bobadilla – Ronda section. New
struction of the new access channel for the integration of High rail access to the Port of Seville. Castellón Station. New par-
Speed in the city of Valencia, the expansion and remodeling king base for high-speed trains in Sant Andreu Comtal; Re-
of the Valencia Station - Joaquín Sorolla and the expansion modelling of the Madrid-Vicálvaro freight terminal. Phase
of the Valencia - Joaquín Sorolla car park; Sevilla-Cádiz HST 1, Subphase 1B and Subphase 1C; Replacement of current
line. Platform and track, Section: Airport of Jerez de la Frontera concrete track for a new railway track on ballast in Orcasitas
Station-Cádiz. Duplication of railway tracks. Railway spur to Station (C-5 Cercanias Madrid Commuter rail network); Im-
Bajo de la Cabezuela dock; Madrid-Sevilla HST line Construc- provement works on the railway track. R16 Line (Rodalies de
tion Project for Comprehensive Infrastructure Improvements on Catalunya´s commuter rail service). Section: Tortosa-L´Aldea
the Madrid-Seville High-Speed Line. Section B: Yeles – Gua- / Conventional lines Maintenance (Infrastructure and tracks)
dalmez; Construction Project for the Remodeling of the Puer- ADIF (MIV): MIV 2021 LOT 1 Northwest / LOT 2 North Me-
tollano Station on the Madrid-Seville High-Speed Line. Track tric-Gauge lines: Infrastructure and track maintenance Adif
and Electrification; Renewal of sleepers on Madrid-Sevilla HST network path. LOT 7 Metric Gauge Railway Network.
line.; Madrid–Zaragoza–Barcelona– French Border HST Line.
New Sant Andreu Station for Catalonia commuter trains net- Renfe Operations (Spanish National Railway Network): Plat-
work. Tracks and overhead contact system works; Vitoria–Bil- form expansion at Asturias and Cantabria stations. Extension
bao–San Sebastián HST line. Platform. Section: Atxondo – Aba- of train-maintenance workshops at Montcada
diño / Platform. Section: Mondragon-Elorrio-Bergara. Sector II.
/ Platform and track, Section: Astigarraga-Irun. Implementation STATE PORTS (PUERTOS DEL ESTADO). For Valencia Port
of the UIC track width; Mediterranean Corridor Platform and Authority: Track duplication works and implementation of the
tracks works for implementation of standard width. a) Section: third railway line between the Western and Eastern Piers of the
Silla – Cullera, b) Castellbisbal-Martorell, c) Castellón Station; Port of Valencia; maintenance of the internal railway network
Special works: Montcada Bifurcación Station Remodeling Con- of the Port of Valencia; Remodeling of the Príncipe Felipe Pier
struction Project. Phase 1; A High Speed Line connecting the Railway Terminal; Improvement of the layout of the rail and
stations of Atocha and Chamartin. (Madrid). Construction of a road network, including a new classification yard, between
new tunnel by using a TBM and an UIC track width / Atlantic the Poniente Pier and the Costa del Puerto Pier.
Axis high-speed rail linea. Section: Ulla Viaduct. (The bridge
is a composite featuring a steel truss built on a concrete deck. OTHER RAILWAY AUTHORITIES. For Eukal Tremdide Sarea
It is composed of 3 main spans of 225 meters, 240 meters and (E.T.S.): Road Renewal Work on the Lutxana – Sondika Sec-
225 meters, making the principal span one of the largest in the tion; Tramway expansion Vitoria-Gazteiz to Salburu, second
world – the bridge also holds multiple records) / Madrid-Gali- phase. Civil works. / New Station in Zarautz (Basque Country)
cia HST line. Section: Silleda-Vedra-Boqueixón. Infrastructure / Maltzaga Station track renovation and new auxiliary track.
works including the Ulla viaduct a lightly pointed arch, 168 / New emergency exits. Section: Bergara-Astigarraga / Addi-
m. of span and 105 m. of rise; Project design and track-laying. tional platform works for the New Railway Network in the
Section: Olmedo-Pedralba de la Pradería. Basque Country. Section: Bergara-Astigarraga / Infrastructure
maintenance and track Tramcar Vitoria / Infrastructure main-
HST-TRACK MAINTENANCE: Madrid–Barcelona HST line. tenance and track Tramcar Bilbao period 2019-2022. For Me-
Maintenance of infrastructure, track switches and crossings. tro Madrid: Comprehensive Renovation Works of the Track
Operating bases Brihuega y Calatayud (2024 -2028); Ma- Superstructure on Line 6, Section 2; Integral maintenance of
drid-Asturias HST line. Maintenance of track, switches and switches and crossings for Metro Madrid. Lot 1 and emergen-
crossings. Section: Galicia connection – La Robla - Pola de cy works / Infrastructure maintenance service for Metro de
Lena (2023-2027). Madrid–Seville HST line. Maintenance of Madrid network Lot 4: Lines 6 and 11 / Infrastructure main-
infrastructure, track switches and crossings. Operating bases tenance service for Metro de Madrid network Lot 6: Lines 9;
Mora y Calatrava (2024 -2028); Madrid – Levante HST line. For FGC: Track renewal between Muntaner and Tres Torres,
Maintenance and pre-maintenance service of the infrastructu- Barcelona – Vallés Line. For TMB: Track renewal Line 3. Sec-