Page 407 - Anuario FFCC - 2025
P. 407
- Pre-construction engineering for the Las Vegas-Los Angeles stallations associated with the high-speed section between
High Speed Rail project. Chamartín and Torrejón de Velasco.
- Hitrino traction substation (Bulgaria). - Maintenance of electrification facilities. South and East
- Supply and assembly of the second transformer at the Se- Operations Subdirectorate.
queiros supply center. León – A Coruña Line. Section: Mon- - Maintenance of the tunnels on the La Robla-Pola de Lena
forte – Covas (Lugo). high-speed line (León, Asturias). guía de empresas
- Guillarei new feeder exit (Pontevedra).
- Catenary electrification of Mollet Sant Fost station (Bar- Geographic areas where your products and services are mar-
celona). keted: Main European and American countries.
- Reconstruction of Jasna traction substation buildings in
Warsaw - Lot 1. Certifications:
Quality, Environmental Management and RDI: As proof of
Metro and Tram: our commitment to the HSE and QA/QC policies Lantania
- Works on the technical branch of the northern section of obtained the ISO 9001, ISO 14001 and ISO 45001:2018
line 3 of the Seville Metro. certifications, in the areas of quality, environment and
- Renovation works on Line 1 of Metrovalencia. Replacement Health & Safety granted by Aenor. In addition, we have
of the existing turnouts with their drives and modification of recently obtained the ISO 50001:2018 certification of
interlockings and centralised traffic control systems (CTC). our energy management system. ISO 20400 Sustainab-
Track renewal will also be carried out on several branches le Purchasing Certification granted by AERCE. ‘Calculo’
and level crossings will be renovated. Replacement of 45 badge by the Ministry for Ecological Transition and Demo-
turnouts, the supply and installation of 14,374 prestressed graphic Challenge. ISO 19650 Certification for BIM Infor-
concrete monoblock sleepers and the supply and installati- mation Management. ISO 39001 Certification for the Road
on of 24,932 m3 of ballast. Safety Management System.
-Reconstruction of the Lodz tramway line. Legionow Street.
Sections I, II and III. Lodz (Poland).
- 1.3 km double tramway line with three stations along its Income 2023: 375 million Euro.
route on Gagarina Street in the city of Warsaw (Poland). Ebitda 2023: 12.5 million Euro.
- Tram line from Aleja Niepodleglosci to Pulawska Street No. of employees 2024: 1,300
(Poland).
- Tram line to the Jar housing estate in Toru‐ - part A, B and
C (Poland)
- Reconstruction of the tram crossing at Towarowa and
Chłodna Streets in Warsaw (Poland).
- Tramway works at the ‐aba roundabout in Warsaw (Poland).
Maintenance:
- Preventive and corrective maintenance and auxiliary works
of the different electrification facilities of the conventional
network in the eastern area of Spain: overhead contact line,
traction substations and high voltage power supply lines to
traction substations.
- Albacete-Alicante signaling maintenance. Several mainte-
nances works in a line with 160km of double lane.
- Adaptation of traction substations and their high-voltage po-
wer lines in the conventional network to comply with Adif
regulations in the Northeast, South, Center and North areas.
- Maintenance of Albacete-Alicante signalling. Actions on
a double-rail line with two maintenance bases located in
Monforte and Bonete.
- Maintenance service for the contact line, auto-transformer
and remote control energy installations, including the in-
Spanish Railway Yearbook 2025 Anuario del Ferrocarril 405