Page 406 - Anuario FFCC - 2025
P. 406
company guide Top products: ELECTRIFICATION: 1. Railway electrificati- - Modernization of the Plovdiv-Skutare and Plovdiv-Krumovo
Ayerbe, Ayerbe-Calderarenas, Jaca-Canfranc of Huesca-
Canfranc line (Huesca), the standard gauge connection
on projects. INFRAESTRUCTURE: 2. Balzola Polska. MAIN-
to the Mediterranean Corridor of the Llagosta Multimodal
TENANCE: 3. DSV Construction and Railway Company.
Platform (Barcelona) and the remodelling of the Mont-
TRACK: 4. Manufacture of prestressed and reinforced con-
cada-Bifurcación station (Barcelona).
crete railway sleepers.
railway lines and the Plovdiv railway junction in Bulgaria.
Activities in the year:
Renovation of distribution stations, design and construction
Infrastructure:
- Connection of the Madrid-Barcelona and Madrid-Levante
of the platform, track systems, catenary, and signalling and
high-speed lines. Construction of a direct branch line linking
telecommunications systems.
the Madrid-Barcelona and Madrid-Levante high-speed lines
in Madrid, which will enable direct connections between the - Modernization of the Voliujak-Petarch railway section in
Bulgaria. The works will involve the modernization of 12
north-east and the north and north-west of the peninsula. km of track between Voluyak and Petarch to adapt the
- Construction works on the platform construction project. speed of trains to 160 km/h, which requires the construc-
Palencia-Aguilar de Campoo high-speed railway line. Sec- tion of new layouts with civil works for the platform and
tion: Palencia - Palencia Norte. structures, the renovation of the railway track and the
- Execution of the works for the construction project of the ac- traction and catenary system. Renovation of the station
cess to Terminal T4 of Madrid-Barajas Adolfo Suárez airport in the town of Kostinbrod, renovation and construction
in standard UIC gauge. of pedestrian underpasses and a bus stop.
- Execution of bridge repair projects on the Madrid-Barcelona
line, Vilanova-Sitges section: bridge over the Riera de Ca- Building construction:
ñellas stream, km 640+674 and bridge over the Torrente de - Construction of the new Albal (Valencia) train station.
Piera, km 636+562. Construction of the new station and the corresponding
- Execution of the works for the project to repair the bridge emergency works following the impact of the DANA
over the River Arlanzón I on the Madrid-Hendaye line, storm on October 29, 2024, on the main structure. Con-
Quintana del Puente - Villodrigo section. struction of two pavilions, two 200-meter-long platforms,
- Execution of the construction project for the extension of an underpass, and a parking lot with 80 spaces. The
track 2 at the southern end of Vic station on the line from emergency work consisted of cleaning and the replace-
Tour de Carol-Enveigt to the Montcada junction (Barcelona). ment of virtually all the facilities.
- Works for the execution of the project to stabilise the - Accessibility improvement works at the Ramón y Cajal com-
earthworks between km. 128+301 and 129+000. Castejón muter train station in Madrid.
de Ebro - Bilbao line. - Works on the construction project to improve accessibility
- Enlargement of track 3 at Orduña station (Vizcaya). at Navalperal de Pinares station (Ávila).
- Modernization of the Huesca-Canfranc railway lines in two - Works on the construction project to improve accessibility
of its sections, the Ribaforada-Tudela line (Navarra) and the between platforms at Valdepeñas station (Ciudad Real).
Mediterranean Corridor with new sleepers. - Renovation project for the mechanical equipment ope-
- Acoustic protections of the High-Speed line south zone (Ca- rations rest module in the tunnels of the Algeciras Ma-
stilla La Mancha and Andalusia). ritime Station.
- Acoustic protections of the High-Speed line Vitoria-Bilbao- - New Valladolid railway complex. Phase II.
San Sebastian. Section: Bergara-Irun.
- Typsa. Supply of sleepers for the maintenance of the Electrification:
northeast area of the General Interest Railway Network - Electrification of the Madrid-Extremadura high-speed cor-
(RFIG), for access to the new Barcelona Airport terminal, ridor. Erection of the overhead contact line (catenary) bet-
adaptation of Can Tunis station (Barcelona), section of ween Plasencia and Peñas Blancas (125 km).
Calafell-Gavá and others of Barcelona-Tarragona-France - Commissioning of the Tomeza electrical substation (Ponte-
line, Cercanías de Barcelona between Parets del Vallés vedra). Supply of equipment to the existing installation for
and La Garriga, maintenance of Metro Bilbao, renova- its conversion into a traction substation that will feed the A
tion of turnouts and level crossings for Ferrocarrils de la Coruña-Vigo Atlantic axis.
Generalitat Valenciana FGV, the complete renovation of - Construction of 400kV Transmission line in Totana.
the Gijón-Laviana (Asturias) and Torralba-Soria (Soria), - Overhead contact line on the section Sagrera–Mollet–Gra-
and the renovation of the sections Plasencia del Monte- nollers (Barcelona).
404 Anuario del Ferrocarril 2025 Spanish Railway Yearbook