company guide  Top products:  ELECTRIFICATION: 1. Railway electrificati-  - Modernization of the Plovdiv-Skutare and Plovdiv-Krumovo
                                                                     Ayerbe, Ayerbe-Calderarenas, Jaca-Canfranc of Huesca-
                                                                     Canfranc line (Huesca), the standard gauge connection
                 on projects. INFRAESTRUCTURE: 2. Balzola Polska. MAIN-
                                                                     to the Mediterranean Corridor of the Llagosta Multimodal
                 TENANCE:  3.  DSV  Construction  and  Railway  Company.
                                                                     Platform (Barcelona) and the remodelling of the Mont-
                 TRACK: 4. Manufacture of prestressed and reinforced con-
                                                                     cada-Bifurcación station (Barcelona).
                 crete railway sleepers.
                                                                     railway lines and the Plovdiv railway junction in Bulgaria.
                 Activities in the year:
                                                                     Renovation of distribution stations, design and construction
                 Infrastructure:
                  - Connection of the Madrid-Barcelona and Madrid-Levante
                                                                     of the platform, track systems, catenary, and signalling and
                   high-speed lines. Construction of a direct branch line linking
                                                                     telecommunications systems.
                   the Madrid-Barcelona and Madrid-Levante high-speed lines
                   in Madrid, which will enable direct connections between the   - Modernization of the Voliujak-Petarch railway section in
                                                                     Bulgaria. The works will involve the modernization of 12
                   north-east and the north and north-west of the peninsula.   km of track between Voluyak and Petarch to adapt the
                  - Construction works on the platform construction project.   speed of trains to 160 km/h, which requires the construc-
                   Palencia-Aguilar de Campoo high-speed railway line. Sec-  tion of new layouts with civil works for the platform and
                   tion: Palencia - Palencia Norte.                  structures, the renovation of the railway track and the
                  - Execution of the works for the construction project of the ac-  traction and catenary system. Renovation of the station
                   cess to Terminal T4 of Madrid-Barajas Adolfo Suárez airport   in the town of Kostinbrod, renovation and construction
                   in standard UIC gauge.                            of pedestrian underpasses and a bus stop.
                  - Execution of bridge repair projects on the Madrid-Barcelona
                   line, Vilanova-Sitges section: bridge over the Riera de Ca-  Building construction:
                   ñellas stream, km 640+674 and bridge over the Torrente de   - Construction of the new Albal (Valencia) train station.
                   Piera, km 636+562.                                Construction of the new station and the corresponding
                  - Execution of the works for the project to repair the bridge   emergency  works  following  the  impact  of  the  DANA
                   over the River Arlanzón I on the Madrid-Hendaye line,   storm on October 29, 2024, on the main structure. Con-
                   Quintana del Puente - Villodrigo section.         struction of two pavilions, two 200-meter-long platforms,
                  - Execution of the construction project for the extension of   an  underpass,  and  a  parking  lot  with  80  spaces.  The
                   track 2 at the southern end of Vic station on the line from   emergency work consisted of cleaning and the replace-
                   Tour de Carol-Enveigt to the Montcada junction (Barcelona).  ment of virtually all the facilities.
                  - Works for the execution of the project to stabilise the   - Accessibility improvement works at the Ramón y Cajal com-
                   earthworks between km. 128+301 and 129+000. Castejón   muter train station in Madrid.
                   de Ebro - Bilbao line.                           - Works on the construction project to improve accessibility
                  - Enlargement of track 3 at Orduña station (Vizcaya).  at Navalperal de Pinares station (Ávila).
                  - Modernization of the Huesca-Canfranc railway lines in two   - Works on the construction project to improve accessibility
                   of its sections, the Ribaforada-Tudela line (Navarra) and the   between platforms at Valdepeñas station (Ciudad Real).
                   Mediterranean Corridor with new sleepers.        - Renovation project for the mechanical equipment ope-
                  - Acoustic protections of the High-Speed line south zone (Ca-  rations rest module in the tunnels of the Algeciras Ma-
                   stilla La Mancha and Andalusia).                  ritime Station.
                  - Acoustic protections of the High-Speed line Vitoria-Bilbao-  - New Valladolid railway complex. Phase II.
                   San Sebastian. Section: Bergara-Irun.
                  - Typsa. Supply of sleepers for the maintenance of the   Electrification:
                   northeast area of the General Interest Railway Network   - Electrification of the Madrid-Extremadura high-speed cor-
                   (RFIG), for access to the new Barcelona Airport terminal,   ridor. Erection of the overhead contact line (catenary) bet-
                   adaptation of Can Tunis station (Barcelona), section of   ween Plasencia and Peñas Blancas (125 km).
                   Calafell-Gavá and others of Barcelona-Tarragona-France   - Commissioning of the Tomeza electrical substation (Ponte-
                   line, Cercanías de Barcelona between Parets del Vallés   vedra). Supply of equipment to the existing installation for
                   and La Garriga, maintenance of Metro Bilbao, renova-  its conversion into a traction substation that will feed the A
                   tion of turnouts and level crossings for Ferrocarrils de la   Coruña-Vigo Atlantic axis.
                   Generalitat Valenciana FGV, the complete renovation of   - Construction of 400kV Transmission line in Totana.
                   the Gijón-Laviana (Asturias) and Torralba-Soria (Soria),   - Overhead contact line on the section Sagrera–Mollet–Gra-
                   and the renovation of the sections Plasencia del Monte-  nollers (Barcelona).