Page 277 - Anuario FFCC - 2025
P. 277
Design, manufacture and supply of hot-dip galvanized metal Valladolid Railway Complex Phase II
fittings: Amusco-Osorno Section (Palencia)
- Suspension flanges UTE Atocha expansion of tracks (Madrid)
- Clamping flanges UTE Mediterranean Corridor Pulpi-Vera (Almeria)
- Brace braces Southern Access Palencia (Palencia)
- Brace hooks guía de empresas
- Brace thimble UTE Roda de Bara Tunnel (Tarragona)
- Protective plates UTE Intermodal A Coruña (A Coruña)
- Threaded rods FGV (Generalitat Valenciana Railways) Valencia SUD (Valencia)
- Anchors for retaining connection cables Santander Port Authority (Cantabria)
- Supports for terminal boxes Veriña Serin Section (Asturias)
- Supports for junction boxes UTE Renedo Guarnizo (Cantabria)
- Square and round washers UTE Jundiz Logistic Platform (Álava)
- Reinforcement links UTE Nonduermas-Sangonera (Murcia)
- Climbing stirrups
- Wall anchors Legutiano-Escoriatza SUB-II (Guipúzcoa)
- Rings
- Wall staples Geographic areas where your products and services are marketed:
- Suspension heal pad for posts X2-X3-Z1 y Z2-Z3-Z4-Z5 National and International.
- Pole tie-down cleats X2-X3-Z1 and Z2-Z3-Z4-Z5
- Mooring jacks Certifications:
Quality and Environment:
Top products: COMPONENTS: 1. Concrete prefabricated for
cable laying, signaling and hot-dip galvanized steel fittings UNE EN ISO – 1461, UNE 36065 EX00, UNE EN-124-95 and
for railway telecommunications. INFRASTRUCTURE / ENGI- ADIF 03.305.001.4+M1+M2
NEERING & CONSULTING: 2. Parts based on drawing and
laser cutting technology. ATEG Quality and Sustainability Certificate. ENAC ISO 9001
Certification. Bureau Veritas Certification UNE-EN-124-BUP-
Activities in the year: RE and ESG. ATISAE Certification ATISAE Homologation of
Manufacturing and supply of materials for: Welding Process UNE EN ISO 15614-1 and NORMA EN 287-
Ave Villafranca - Peralta Section (Navarra) 1. Achiles RePro Certification. ANDECE ADAP.
Logistic Platform (Álava) Bodies and Covers of Prefabricated Cable Channels, accor-
Ave Burgos - Vitoria Section Phase II (Álava) ding to the Approval document for the Supply of Prefabricated
Train Track Conversion Chamartín (Madrid) Concrete Cable Channels dated 06/11/2020:
Elorrio Section (Vizcaya)
New Work Shop Ave Fuencarral (Madrid) - General Track Channel Bodies (CVG)
Access Way (Valencia) - General Road Gutter Covers (TVG)
Intermodal (A Coruña) - Tunnel Channel Bodies (CT)
Castellbisbal - Martorell Section (Barcelona) - Tunnel Channel Covers (TT)
Nonduermas - Sangonera Section (Murcia) - Interlink area Gutter Bodies 22 (CZE 22)
- Interlink area Gutter Covers 22 (TZE 22)
Ave Navalmoral Section (Cáceres) - Interlink area Gutter Bodies 18 (CZE 18)
Legutiano - Escoriatza Section Sub-II (Guipúzcoa) - Interlink area Gutter Covers 18 (TZE 18)
Villadangos Branch (Ua77) (León) - Biseno 45 (CB45) Gutter Bodies
Tafalla Section (Navarra) - Biseno 45 (TB45) Gutter Covers
Hernani - Astigarraga Section Phase II (Guipúzcoa) - Biseno 600 (CB6) channel bodies
Astigarraga - Irun Section (Guipúzcoa) - Biseno 600 (TB6) Gutter Covers
Renewal of Communications Infrastructure in the Southern Area
Turnover: 6.967.064 -€
Atxondo - Abadiño Section (Vizcaya)
Rante - Seixalbo Tunnel (Ourense) No. of employees: 29
Spanish Railway Yearbook 2025 Anuario del Ferrocarril 275