Page 496 - Anuario FFCC - 2024
P. 496
company guide * Execution of works for the provision of BAB on the Torre- tunnels of the Madrid – Barcelona – French border High Speed
lavega - Santander - Nueva Montaña and Maliaño - Astillero
Line.
* Maintenance of Security and Communication network of
sections.
Tunnels in ADIF’s Conventional Railway network. Northwest
* Execution of infrastructure communication renewal works in
the Northwest area.
Lot.
* OCL maintenance in the Madrid-Castilla la Mancha-Valen-
* Infrastructure communication renewal works in the Nort-
cia-Murcia high speed line.
hern area.
* Execution of the construction project for the Rincón de Soto
variant of the Castejón – Logroño (La Rioja) line.
* Maintenance service for 25 kV AC traction energy facilities
* Development of a next generation track-side dynamic pan-
tograph sensor.
on the Madrid - Asturias high-speed line: overhead contact
line, substations, autotransformation centers, 20 kV line, trans- Innovations in 2023:
* Development of a distributed-integrated command system
formation centers, and energy telecontrol in the Bif. Pajares for high speed lines traction substations and collateral instal-
- Pola de Lena section. lations.
* Execution of the construction project for the 2,200V-3,000V * Development of a predictive maintenance system for cate-
power supply system and fibre optic laying for the conventio- naries.
nal network line Lérida-Manresa. * Development and testing of sensors for the monitoring of
* Works for the construction project to renovate signalling on automatic tension compensation sections in catenaries.
the Madrid – North Area commuter train network. * Development of an algorithm for the complete geometric
* Works execution for the construction project for the safety characterisation of a contact wire from precise point LIDAR
and telecommunications installations of the Sama de Langreo measurements and continuous measurements with noise.
underground routing of Laviana-Gijón San Sanz Crespo line, * Development of an advanced CMMS system.
Laviana-Tuilla section, ADIF’s metric gauge network. *Recovery and use of energy from the vibrations produced by
* Works on the construction project for the eastern traction railways (REVIFE).
substation of the Valladolid railway bypass and rehabilitation *Development system for characterization of railway infra-
of the Pinar de Antequera and Cabezón de Pisuerga traction structure by LiDAR image.
substations. * Switch point heating solution, high performance in efficien-
* Works for the construction project of new interlockings in cy, availability and system versatility.
Veriña and Serín railway stations. *Application development and integration of Web-based
* Construction project for tunnel lighting refurbishment in computing, and local electrification infrastructure.
Madrid-Sevilla High Speed Line. *Development of a CAD environment for OCS design and
* Rigid Catenary Electrification of Lima suburban, Line 2 calculation.
(Peru). *Intelligent Tunnel lighting.
* Execution of the construction project for the refurbishment *SCADA for central control of switch point heaters.
of the 2200v power cable between Covas and Monforte de *Heat transfer simulations in switch point heating systems /
Lemos, León-A Coruña line development of control algorithms.
* Preventive and corrective maintenance assistance and ancil- *Intelligent drive design and development controller for OCS
lary works for electrification facilities (overhead contact line, interaction.
traction substations and high voltage power lines). ADIF-lot 2 *Local operation facility and remote control system for OCS
(Northwest). power disconnectors.
*Maintenance support services for cable network and tele-
communications systems. ADIF-lot 1 (Northwest). Geographic areas where your products and services are mar-
* Maintenance support services for telecommunications cable keted:
and systems network. ADIF-lot 2 (North). Spain, Norway, United Kingdom, Portugal, Denmark, Chile,
* Execution of the construction project for the power remote Peru, Canada, USA, Hong Kong.
control of the Plasencia-Badajoz section of the Madrid-Extre-
madura high-speed railway line. Certifications:
* Power supply to mobile telephony operator infrastructures Quality management system certificate: According to the norm
(BTO) from 750 V-Line II in the Madrid-Lérida section of the UNE - EN ISO 9001:2000 (ER-0186 / 1996). Environmental
Madrid-Barcelona-Figueras high-speed line. Management System Certificate: according to the norm UNE -
*Integral management of the safety and security systems in the EN ISO 14001:2004 (GA-2005 / 0302). R & D I Management
494 Anuario del Ferrocarril 2024 Spanish Railway Yearbook