Page 289 - Anuario FFCC - 2023
P. 289

CAF Signalling´s strategy is based on:            - Award of contract for supply and commissioning of ETCS
               1.     Making available advanced in-house technological   L1 + ATO on-board equipment in New Zealand. Customer
               products, both in the  field of on-board equipment, as well as   Auckland Transport.
               that of trackside infrastructures, which constitute the nucleus   - Certification of the generic product BL3R2 on-board, Level 1
               of comprehensive solutions. In R&D+i backs on-going   and Level 2.
               innovation and client-based solutions.            - Commissioning ETCS on-board Level 1 in Auckland of 15
               2.     High levels of signage engineering know-how,   new CAF trains. Operator Auckland Transport.  guía de empresas
               necessary to undertake turn-key projects for railway signalling.  - Retrofit and commissioning of on-board ETCS Level 1 on all
               3.     Major skills to manage and implement complex   57 CAF trains in Auckland. Operator Auckland Transport.
               projects, backed by the support of its parent company, CAF.  - Execution of ATO tests on ERTMS on CAF trains in Auckland.
                                                                 Operator Auckland Transport.
               Management team:                                  - Execution of ATO over ERTMS tests on CAF SNG trains.
               GENERAL MANAGER: Jon  Alzate. STRATEGY, QUALITY &   Operator NS.
               SAFETY/RAM DIRECTION: Egoitz Iturritxa. FINANCE, LEGAL &   - BL3R2 on-board ERTMS authorisation in the Czech
               COMPLIANCE, IT DIRECTION: Alberto Altuna. TECHNOLOGY   Republic.
               DIRECTION: Javier Rábade. PEOPLE & COMMUNICATION   - Execution of tests and commissioning of the EM100 project
               DIRECTION: Silvia López. TRACKSIDE BUSINESS UNIT: Jon   (Yellow Machine retrofit) in the Czech Republic. Customer
               Alzate. TS OPERATIONS DIRECTION: Frédéric Charlemagne.   AZD.
               TS COMERCIAL AND BIDS DIRECTION: Raúl Costa. MASS   - Execution of BL3R2 Level 1 and Level 2 on-board ETCS
               TRANSIT BUSINESS UNIT: Ion Irazabal. ON BOARD SYSTEMS   integration tests for 21 CAF trains in UK, class 197 -
               BUSINESS UNIT: Xabier Subijana.                   Wales&Borders project. Operator Transport for Wales
                                                                 - Execution of BL3R2 Level 1 and Level 2 on-board ETCS
               Activity: Signalling systems and railway control.  integration tests for 7 PESA trains in Czech Republic. Operator
                                                                 Regiojet
               Main products and services:                       - Execution of on-board ETCS integration tests BL3R2 Level
               Design, development, manufacture, supply, installation and   1 and Level 2 for 25 PESA trains in Poland. Operator Koleje
               maintenance of:                                   Dolnoslaskie
               ERTMS solutions: ETCS level 1 and ETCS level 2 (trackside   - Execution of works and tests for the renovation of the León
               and On Board)                                     and Oviedo CTCs. Commissioning of the León and Oviedo
               Electronic interlocking systems                   CTCs.
               Integrated Control Centres with CTC, Power Remote Control   - Execution of works for the renovation of the Berrón,
               and Maintenance Aid.                              Santander and Bilbao CTCs. Commissioning of the Santander
                                                                 and Bilbao CTCs.
               Top products: SIGNALLING: 1. QUASAR Q4 ENCLAVAMIENTO   - Execution of works for the design and construction of the
               ELECTRÓNICO. 2. AURIGA OBS BL3 R2 N1 Y N2.        signalling system, PCC, SAEIV, GTE, GTC and chronometry for
                                                                 the first tramway line in Liège (Belgium).
               Activities in the year:                           - Execution of works for the renewal of the signalling system
               - Execution of the ENCE/ERTMS_N2 works and testing   on the Zidani Most, Šentilj line in Slovenia. Commissioning of
               of the interlocking installations, train protection system,   section 3 of the line (Poljcane-Slovenska Bistrica).
               fixed telecommunications, centralised traffic control,   - Execution of works for the design, construction of the
               auxiliary detection systems, GSM-R and protection and   signalling system and control centre of the Green line and the
               safety installations on the Madrid-Levante high-speed line,   renovation and two extensions of the Red line of the Jerusalem
               Monforte del Cid-Murcia section (in consortium formed by   tramway (Israel).
               CAF Signalling, Revenga Ingenieros and FCC Industrial).   - Execution of works for the design, construction,
               Commercial commissioning of the infrastructure, energy   refurbishment and maintenance of the signalling and ERTMS
               and CMS subsystems of the Beniel - Murcia section of the   system for the Port of Montevideo-Paso de los Toros station
               Monforte del Cid - Murcia Del Carmen high-speed line.  line (Uruguay).
               - Execution of phase 2 and commissioning of the ERTMS N1   - Execution of works for the design, construction and
               system and commencement of maintenance of the contract   maintenance of the signalling and ERTMS system on the
               for the implementation of the signalling and ERTMS level 1   Encina-Xátiva-Valencia section of the Mediterranean corridor.
               system on the Pamukova-Köseköy line in Turkey. Client TCDD.   Providing ADIF with the La Encina - L’Alcudia tunnel section
               - Commissioning of ETCS on-board equipment in the   for train driver testing.
               Netherlands for customer NS.                      - Execution of works to renew the blockage on the Arahal-



            Spanish Railway Yearbook  2023 Anuario del Ferrocarril                                             287
   284   285   286   287   288   289   290   291   292   293   294