Page 457 - Anuario FFCC - 2025
P. 457

and air conditioning management in metro networks,   - PMC Baltimore & Potomotac (Frederik Douglass)
                stations and other enclosed spaces, focused on impro-  Tunnel (USA)
                ving thermal comfort, air quality and energy consump-  - Planning services for the management of freight transport
                tion. In service in five Barcelona metro lines, with very   on the Tren Maya (Mexico)
                significant improvements in both energy savings and   - On-site Technical Assistance Cable-stayed Bridge “Garra
                passenger comfort.                                de Jaguar” (Mexico)                            guía de empresas
                                                                  - Preliminary Project and Executive Project Connection Ma-
               - ACROT: Advisory system for risk control in the opera-  yan Train – Campeche City (Mexico)
                tion of ACROT tunnel boring machines, based on the   - Site technical assistance and electromagnetic compatibility
                combination of a digital platform for data collection,   services for section 5 SOUTH of the Maya train project (Mexico)
                processing, analysis and visualization in real time with   - Traction study Mayan Train (Mexico)
                the technical expertise of a dedicated team of specia-  - Projects and specialized consulting for the technological
                lists,  a detailed  and permanently  updated  procedures   support of the services required for the start of the com-
                manual and a structured database with project history.   mercial exploitation, operation, maintenance and structural
                The system has been successfully used in projects such   monitoring of the Mexico-Toluca Interurban Train (Mexico)
                as the first phase of the Oporto metro (Portugal), the   - EFE Project Management Framework Contract. Preparation
                Barcelona Sants-Sagrera high-speed railway line and   of technical specifications for the development of detailed
                line 3 of the Guadalajara metro (Mexico).         engineering for the railroad tracks of the TAM project (Chile).
                                                                  - Tender engineering “Railway transport service of minerals
               - ACROT Maintenance: Digital platform for predictive   from Los Colorados Mine to Pellets Plant in Huasco (Chile)
                maintenance and tunnel condition management that   - Consulting for the drafting of electrification projects (2nd
                transforms data into real knowledge of the condition of   Framework Agreement) for ADIF (Spain).
                the structure, improving decision making.         - Technical Assistance Works Managment Chamartín Stati-
                                                                  on in Madrid (Spain)
               - Structural health  monitoring  system  for  railway bridges   -  Services  for  dynamic  project  supervision  at  ADIF-High
                based on data analytics and the application of decision-  Speed (Spain)
                making algorithms to predictively assess the future evolu-  - Framework Plan CMS Projects Suburban Railway Plan (Ex-
                tion of the structural condition of the structures, integrated   pansion 2024) (Spain)
                with BIM models. Developed through a pre-commercial   - Technical Assistance Control and Surveillance Works PC
                innovative public procurement contract with the Center   Line Torralba – Soria (Spain)
                for the Development of Industrial Technology (CDTI).  - D&B tender services for the Lisbon-Porto high-speed rail
                                                                  link (Portugal)
               - Intelligent energy asset management system EMS: Real-  - Linha do Douro. Execution Project for the Electrification
                time predictive and automatic control system for all the   and Modernization of the Regua-Pocinho Section (Portugal).
                energy assets of a facility, optimizing the possible syner-  - HS2 EDP (Engineering Delivery Partner) 2024 contract for
                gies between self-consumption generation, storage and   the line between London and Birmingham for High Speed
                energy demand, both electrical and thermal.       Two (HS2) Limited, a government company responsible for
                                                                  the development and running of the new high-speed rail-
               Top products: ENGINEERING AND CONSULTING: 1. Sener is   way network in the United Kingdom.
               carrying out the preliminary design of the new Abu Dhabi-  - TPS Femern Detail Design (Denmark)
               Dubai high-speed rail line, UAE. 2. Design of the world‘s lon-  - Design of substations and catenary for the Vilnius-Klaipe-
               gest driverless monorail network in Cairo, Egypt.  da line (Lithuania).
                                                                  - Study for vertical impact detectors for UIC
               Activities in the year:                            - Project Management Consultant Services for the Saudi
               High-speed and conventional railway:               Land Bridge Railway Network (Saudi Arabia).
                                                                  - Tender engineering service for NEOM Marina project
                - Client engineering services for the new rail line between   (Saudi Arabia)
                Quebec and Toronto (High Frequency Rail) (Canada)  - Preliminary design of Abu Dhabi-Dubai high-speed line,
                - Systems Engineering and Design Management for ONX-  the first in UAE
                PRESS CJV on the ON CORRIDOR (RER Package 3) project   - Etihad Rail Conventional Speed Passenger Service Stations
                of the GO Rail Expansion Program in Ontario (Canada).  Systems (Systems Integrator) (UAE)




            Spanish Railway Yearbook 2025 Anuario del Ferrocarril                                              455
   452   453   454   455   456   457   458   459   460   461   462