Page 430 - Anuario FFCC - 2025
P. 430

company guide  area of 900 m2 and will comprise a single floor with three diffe-  OUIGO

                 rentiated areas: passenger hall, shopping area and technical ser-
                 vice facilities. The station will have platforms 210 m long and a
                 minimum width of 5 m. An underpass will link the platforms built
                 using buried caissons measuring 5 m wide and 3 m headroom.

                 Execution of the works of the Track Renewal Project at the
                 Negrilla Logistics Center.
                 The actions consist of improving the performance of the Ne-
                 grilla terminal by renewing the track materials of the general
                                                                                  Dirección postal
                 tracks (tracks 1 and 2), reception and dispatch tracks (tracks
                                                                                Calle Alfonso XII, 62,
                 4, 6 and 8), of the M2 handle track, and of the tracks in the   28014 Madrid (España)
                 warehouse and warehouse area (28, 30, 32, 34 and 36). In       Tel.: + 34 910 780 990
                 addition, tracks 34 and 36 will be adapted to comply with the   marketing@ouigo.es
                 uniform gauge. The following will be                         https://www.ouigo.com/es/
                 type 1 ballast, rail 54 E1, track gauge 1668mm and PR-VE
                 concrete sleepers will be used.                   Equipo directivo:
                 To solve drainage problems, a geogrid and a geotextile will   Directora General: Hélène Valenzuela
                 be installed over a 15 cm sub-ballast layer, equipped with a   Director de Recursos Humanos y Tecnologías de Información:
                 pumping system that will allow the platform to drain towards   Francisco Martín
                 the planned ditches. In addition, it is planned to dismantle the   Dirección Asesoría Jurídica: Patricia Miranda
                 existing weighbridge on the road 4.               Dirección de Planificación y Mantenimiento: Sergio Bárcena
                 the existing weighbridge on track 4, currently in disuse.  Dirección de Seguridad: David Cortés
                                                                   Dirección Financiera y Adquisiciones: Santiago Pérez de Ayala
                 Geographical areas where our products and services are   Dirección Comercial y de Marketing: Federico Pareja
                 available:                                        Dirección de Operaciones y Servicios: Pierre Grosmann
                 ORTIZ CONSTRUCCIONES y PROYECTOS, S.A. carries out   Dirección de Tecnologías de Información: Guillaume Dahan
                 its business activities nationally and internationally.
                                                                   Actividad: Operadora Transporte Ferroviario.
                 Certifications:
                 Quality and Environment:                          Principales productos y servicios:
                 Quality Management System certificate in accordance with   OUIGO ESPAÑA SAU es una empresa privada, filial españo-
                 ISO 9001:2015 standard assigned registration number ER-  la del grupo francés SNCF Voyageurs, uno de los principales
                 0159/1997.                                        actores mundiales del transporte de viajeros, principalmente
                 Environmental Management System certificate in accordance   en ferrocarril. OUIGO es el operador de tarifas asequibles de
                 with the ISO 14001:2015 standard assigned registration num-  trenes de alta velocidad que ha llegado a España con el obje-
                 ber GA-2000/0039.                                 tivo de popularizar la alta velocidad y acercar este medio de
                 Certificate of the Energy Management System in accordance   transporte a todos los bolsillos.
                 with the ISO 50001:2018 standard assigned registration num-
                 ber GE-2014/0023.                                 Desde el 10 de mayo de 2021, OUIGO comenzó su acti-
                 CO2 Compliance Certificate calculated in accordance with   vidad en España ofreciendo un servicio de alta velocidad
                 the requirements of the GHG PROTOCOL assigned registrati-  entre Madrid y Barcelona con paradas en Zaragoza y Tarra-
                 on number GHG-0099/2023.                          gona. Desde el 7 de octubre de 2022, la compañía realiza
                 Certificate from the Occupational Health and Safety Manage-  la ruta Madrid – Valencia y el 27 de abril de 2023 OUIGO
                 ment System in accordance with the ISO 45001:2018 stan-  amplío su actividad en España acercando su servicio ha-
                 dard assigned registration number SST-0199/2012 (formerly   sta las ciudades de  Alicante y Albacete. Desde el 19 de
                 OSHAS 18001:2007).                                abril  de  2024  OUIGO  conectó  Madrid  con  Valladolid  y
                 Certificate from the Statutory Audit of Occupational Risk Pre-  Segovia; y desde el 5 de septiembre de 2024 Madrid con
                 vention assigned registration number APRL-2022/0040.  Elche y Murcia. En 2024 también añadió parada en Cuenca
                 All the aforementioned certificates were awarded by AENOR   en las rutas Madrid-Valencia y Madrid-Albacete-Alicante.
                 INTERNACIONAL, S.A.U.                             Además, desde el 16 de enero de 2025, OUIGO inauguró




       428                                                     Anuario del Ferrocarril 2025 Spanish Railway Yearbook
   425   426   427   428   429   430   431   432   433   434   435